Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | ₹15.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.6 LRejected-AOC | ₹16.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹15.8 LRejected-AOC | ₹15.8 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | N S CHELLAPANDIAN L3 | T RAJA L1 | K DEEPAK L2 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling Plain Cement Concrete | 10 | M3 | 546.24 ₹5,462.41 | 503.6 ₹5,036 | 520.13 ₹5,201.26 |
| 2.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 78 | M3 | 6,477.81 ₹5.1 L | 5,971.9 ₹4.7 L | 6,168.11 ₹4.8 L |
| 3.01 | Supplying, erecting shuttering with necessary supports for plinth beam with all cross bracing etc., complete (RCC column footing plinth, beam and lintel sides ) | 42 | M2 | 1,517.82 ₹63,748.31 | 1,399.3 ₹58,770.60 | 1,445.25 ₹60,700.54 |
| 4.01 | Plain Cement Concrete 1:1.5:3 (one cement One and half fine aggregates and Three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and all incidential charges such as water providing etc., complete as per standard specification | 87 | M3 | 8,555 ₹7.4 L | 7,886.9 ₹6.9 L | 8,145.99 ₹7.1 L |
| 5.01 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 69 | M2 | 509.25 ₹35,138.25 | 469.5 ₹32,395.50 | 484.9 ₹33,458.31 |
| 6.01 | Charges towards finishing the concrete surface with power traveler machine rate shall include the cost of fule charges hire for manchine and labour charges for operation etc.,, | 870 | M2 | 59.89 ₹52,106.04 | 55.2 ₹48,024 | 57.03 ₹49,614.88 |
| 7.01 | Add GST 18% | 1 | GST | 2,53,081.63 ₹2.5 L | 2,33,317.2 ₹2.3 L | 2,40,981.91 ₹2.4 L |
Tender Value
₹15.8 L
EMD Value
₹15,801
Closing Date
5 Nov 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Renovation of CC ward at mariamman kovil 2nd street and 1st street in ward 35
2025_MAWS_617574_1
E7 / EST 292 / 2025-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹15,801
12 Mar 2026
27 Oct 2025
5 Nov 2025
27 Oct 2025
5 Nov 2025
27 Oct 2025
Amount
Dismantling Plain Cement Concrete
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.
Supplying, erecting shuttering with necessary supports for plinth beam with all cross bracing etc., complete (RCC column footing plinth, beam and lintel sides )
Plain Cement Concrete 1:1.5:3 (one cement One and half fine aggregates and Three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and all incidential charges such as water providing etc., complete as per standard specification
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Charges towards finishing the concrete surface with power traveler machine rate shall include the cost of fule charges hire for manchine and labour charges for operation etc.,,
Add GST 18%
K DEEPAK (BID ID -1503738)
N S CHELLAPANDIAN (BID ID -1503745)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_738049.xls
BOQ • 0.23 MB
DOC.pdf
Tender Documents • 0.79 MB
Download all tender documents and submit your bid