Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC | ₹31.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹35.1 LRejected-Finance | ₹35.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹36.1 LRejected-Finance | ₹36.1 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S MOHIT ASSOCIATES L1 | M/S Z.A BUILDCON L2 | M/S VIPIN KUMAR CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work with slush and lehal clearance in internal section of minor by manual labour i/c raming & dressing the surface to the required levels and slopes and also i/c 1.50 m lift and 6m lead . The earth to be disposed upto 1.00km of spoil banks or as directed by engineer - in- charge. | 819.75 | cum | 60 ₹49,185 | 40 ₹32,790 | 60 ₹49,185 |
| 2.00 | Uprooting jhunds with back filling. | 550 | nos | 19 ₹10,450 | 15 ₹8,250 | 16 ₹8,800 |
| 3.00 | Earth work in Making Diversion/Bundha by transported earth with a lead 200 m to 1.00 km i/c excavation, loading, unloading, manual compaction, dressing & all lift complete. | 51.31 | cum | 88 ₹4,515.28 | 100 ₹5,131 | 190 ₹9,748.90 |
| 4.00 | Earth work in Leap cutting in all soil (loam clay or sand) including all lift and lead upto 30M and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches. from km 2.150 to 2.800 | 413.06 | cum | 29 ₹11,978.74 | 50 ₹20,653 | 110 ₹45,436.60 |
| 5.00 | Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 78.2 | cum | 3,950 ₹3.1 L | 4,400 ₹3.4 L | 4,800 ₹3.8 L |
| 6.00 | Supplying and laying 200 micron L.D.P.E. film including cost of all material, Labour and T&P etc. complete. | 2,925 | sqm | 28 ₹81,900 | 10 ₹29,250 | 37.25 ₹1.1 L |
| 7.00 | Brick work with first class(M-150) bricks in 1 : 4 C.M. i/c cost of all material, labour, T&P etc. Complete. | 360.59 | cum | 4,900 ₹17.7 L | 4,750 ₹17.1 L | 5,050 ₹18.2 L |
| 8.00 | Supplying and Laying brick /Cement concrete tiles Grade M-15 size (250X120x50)mm including 12 mm thick C.M. 1:3 over 200micron LDPE film including filling of joint with same mortar,cost of labour and T&P complete. | 2,262 | sqm | 380 ₹8.6 L | 574 ₹13.0 L | 500 ₹11.3 L |
| 9.00 | Cement Pointing Struk Deep on brick masonry in 1:2 cement mortar i/c all cost of material, labour, T&P etc required for proper completion of work. | 622.05 | sqm | 85 ₹52,874.25 | 80 ₹49,764 | 100 ₹62,205 |
| 10.00 | Earth Work in removing Bundha by hydraulic excavator/JCB/equivalent capacity with lift upto 1.5 M & lead upto 90 M including cost of driver/assistant driver, POL, maintenance of mabhine, contractor profit, T&P etc required for proper completion of work. | 38.48 | cum | 40 ₹1,539.20 | 120 ₹4,617.60 | 40 ₹1,539.20 |
Tender Value
₹42.4 L
EMD Value
₹85,000
Closing Date
12 Sept 2025, 3:00 pmClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1071640_11
04/SE-1/2025-26
Open Tender
Civil Works
60 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹85,000
SE OFFICE 1ST IWC MEERUT
25 Dec 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
10 Sept 2025
Amount
Earth work with slush and lehal clearance in internal section of minor by manual labour i/c raming & dressing the surface to the required levels and slopes and also i/c 1.50 m lift and 6m lead . The earth to be disposed upto 1.00km of spoil banks or as directed by engineer - in- charge.
Uprooting jhunds with back filling.
Earth work in Making Diversion/Bundha by transported earth with a lead 200 m to 1.00 km i/c excavation, loading, unloading, manual compaction, dressing & all lift complete.
Earth work in Leap cutting in all soil (loam clay or sand) including all lift and lead upto 30M and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches. from km 2.150 to 2.800
Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work.
Supplying and laying 200 micron L.D.P.E. film including cost of all material, Labour and T&P etc. complete.
Brick work with first class(M-150) bricks in 1 : 4 C.M. i/c cost of all material, labour, T&P etc. Complete.
Supplying and Laying brick /Cement concrete tiles Grade M-15 size (250X120x50)mm including 12 mm thick C.M. 1:3 over 200micron LDPE film including filling of joint with same mortar,cost of labour and T&P complete.
Cement Pointing Struk Deep on brick masonry in 1:2 cement mortar i/c all cost of material, labour, T&P etc required for proper completion of work.
Earth Work in removing Bundha by hydraulic excavator/JCB/equivalent capacity with lift upto 1.5 M & lead upto 90 M including cost of driver/assistant driver, POL, maintenance of mabhine, contractor profit, T&P etc required for proper completion of work.
M/S Z.A BUILDCON (BID ID -5530458)
M/S VIPIN KUMAR CONTRACTOR (BID ID -5529740)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid