| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | ₹4.7 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹4.7 LRejected-Finance | ₹4.7 L | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | MR.SHANMUGASUNDARAPANDIAN, CONTRACTOR L2 | Mrs. K. Saradha Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation | 7.03 | Cum | 263.78 ₹1,854.37 | 263.77 ₹1,854.30 |
| 2.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 2.93 | Cum | 5,344.82 ₹15,660.32 | 5,344.81 ₹15,660.29 |
| 3.00 | Filling the basement excavated earth other than sand including all labour charges etc., complete | 4.86 | Cum | 45.85 ₹222.83 | 45.84 ₹222.78 |
| 4.00 | Supllying filling with m. sand in layers not including all labour charges etc., complete | 1.62 | Cum | 1,630.84 ₹2,641.96 | 1,630.83 ₹2,641.94 |
| 5.00 | Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 7.65 | Cum | 6,060.05 ₹46,359.38 | 6,060.04 ₹46,359.31 |
| 6.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc., complete | 830 | kg | 91.86 ₹76,243.80 | 91.86 ₹76,243.80 |
| 7.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 75.85 | Sqm | 1,095 ₹83,055.75 | 1,095 ₹83,055.75 |
| 8.00 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 7.46 | Cum | 8,955.65 ₹66,809.15 | 8,955.64 ₹66,809.07 |
| 9.00 | Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same | 25.01 | Sqm | 1,305.25 ₹32,644.30 | 1,305.24 ₹32,644.05 |
| 10.00 | Paving the floor with best quality Stain free Nano Polish Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. | 17.19 | Sqm | 1,193.2 ₹20,511.11 | 1,193.2 ₹20,511.11 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
9 Mar 2026, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
Bus Shelter
2026_RDTN_672147_1
A3/2885/2025
Open Tender
Civil Works - Others
180 days
Manur
Refer Tender Doc
2 documents required · 2 mandatory
₹0
₹6,000
22 Mar 2026
8 Mar 2026
9 Mar 2026
8 Mar 2026
9 Mar 2026
8 Mar 2026
Earth work excavation for foundation in all soils such as red earth,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Filling the basement excavated earth other than sand including all labour charges etc., complete
Supllying filling with m. sand in layers not including all labour charges etc., complete
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc., complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Paving the floor with best quality Stain free Nano Polish Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.
Finishing the top of slopped roof, sun-shade with Decorative Tiles (Ornamental Tiles) of approved quality laid in cement mortar 1:3 20mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same red oxide mixed mortar etc complete, complying with standard specifications
Dadooing of walls with white glazed tiles of size 15cmx15cmx6 mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 -10Sqm.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Exterior emulsion paint two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_807810.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid