Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
5 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
SR. DEN 5
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
Experience in similar nature of work :- (a) The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.),tenderer must have successfully completed any of the following during last 07 (seven) years,ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(i): Separate completed works of minimum required values for each component shall also be considered for fulfillment of technical eligibility criteria.(b) (ii) In such cases, what constitutes a component in a composite work shall be clearly pre defined with estimated tender cost of it, as part of the tender documents without any ambiguity.
Defination of Similar Work :- Any P.Way works.
81 conditions · 18 needing a document upload
" No post tender correspondence will be done with the participant tenderer(s) for deficient credentials noted during scrutiny of tender/offer nor any credential will be accepted after opening of the tender and the offer shall be decided on the basis of submitted/Credentials downloaded with offer only"
If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender.
After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society/HUF etc. shall be neither asked nor considered, if submitted.Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in tender offer submitted
Tenderers attention is invited to clause I of Section VII and other relevant clauses of Section I and II whereby in case of non- submission/non compliance, the tender offer is likely to be rejected.
The tenderer/s shall submit a duly filled Tender form as per "ANNEXURE-I" OF STANDARD TENDER DOCUMENT"
In case of other than Company/Proprietary firm, Annexure-V (A) shall be submitted by each member of a Partnership Firm/ Joint Venture (JV)/Hindu Undivided Family (HUF)/ Limited Liability Partnership (LLP) etc. as the case may be. Non submission of above Certificate(s) by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested/digitally signed by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document.
The following documents should be specified for submission along with tender:
A. List of Personnel, Organization available on hand and proposed to be engaged for the subject work.
B. List of plant Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work.
C. The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, Date of actual start, actual completion and final value of contract should also be given.
D. List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
The tenderers whether sole proprietor , a limited company or a partnership firm he/they should submit authentic proof in terms of partnership deed, proprietorship documents etc. along with the tender. If he/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by Notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorizing him/her name to submit the tender, sign the agreement , receive money, witness measurements, sign measurement books , compromise, settie, relinquish any claims, preferred by firm and also sign No Claim Certificate and refer all or any disputes arbitration.
Bid Security: (a)Subject to exemptions provided under para 4(iv)) of this document, the tender must be accompanied by a Bid Security as mentioned in tender documents, failing which the tender shall be summarily rejected. (b)The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender. It is understood that the tender documents have been issued to the Tenderer(s) and the Tenderer(s), is / are permitted to tender in consideration of the stipulation on his / their part that after submitting his / Their tender subject to the period being extended further, if required by mutual agreement from time to time, he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to North East Frontier Railway. Should the tenderer fail to observe or comply with the foregoing stipulation, the amount deposited or Bank guarantee bond submitted as Bid Security for the due performance of the above stipulation, shall be forfeited to the Railway. (c)If his tender is accepted, (i)the Bid Security mentioned in sub para(a) above deposited in cash through e- payment gateway will be retained as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract; (ii)the Bid Security mentioned in sub para(a) above submitted as Bank guarantee bond, will be encashed as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract. The Bid Security of other Tenderers shall, save as herein before provided, be returned to them, but the Railway shall not be responsible for any loss or depreciation to the Bid Security that may happen thereto while in their possession, nor be liable to pay interest thereon. (d)In case Contractor submits the Term Deposit Receipt/Bank Guarantee Bond towards either the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security so retained as per sub para(c) above, to the Contractor.
The payment towards earnest money (EMD) against the works tenders should be made as brought out in GCC April 2022, Para 5: (Bid Security) PART I Instructions to Tenderers (ITT) & Para 6 (a to d) of Tender Form (Second Sheet)
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' and Labour Cooperative Societies shall submit Registration Certificate issued by appropriate authority.
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90days beyond the bid validity period
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured:
A scanned copy of the Bank Guarantee shall be uploaded on e- Procurement Portal (IREPS) while applying to the tender.
The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last 6.3.2 date of submission of bids). (Corrigendum: Para 5(3) ii Part I of GCC has been modified vide Advance Correction Slip No. 5 Railway Board's letter no. 2022/CE-l/CT/GCC-2022/Policy Dated 20.10.2023)
Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original 6.3.3 Bank Guarantee within the specified period shall lead to summary rejection of bid.
The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender.
The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, FAILING WHICH THE BID WILL BE REJECTED.
The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid 6.3.6 for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope.
The envelope shall be addressed to the officer and address as mentioned in the tender document.
The following documents should be specified for submission along with tender:
A. List of Personnel, Organization available on hand and proposed to be engaged for the subject work.
B. List of plant Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work.
C. List of Works completed in the last three financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, Date of actual start, actual completion and final value of contract should also be given.
D. List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Clause regarding GST - (a) Tenderer should furnished their GSTIN numbers representing the States in which they are registered for GST, along with address of Registered Office, place of business in State etc. (b) The contract is under GST act & rules as applicable time to time. (c) All the bidders/tenders should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law.
(a) At the time of creation of any new tender in IREPS works module, an option has been provided to the tendering authority for obtaining Bid Security Declaration in lieu of Bid Security/Earnest Money Deposit. In case this option is selected, the Bid Security/Earnest Money Deposit amount for the tender shall be NIL. (b) If the tendering authority decides to take Bid Security/Earnest Money Deposit, it shall be mandatory for the tendering authority to provide reasons, and upload the approval of competent authority for the same. The Competent Authority shall be the next higher authority to the authority competent to finalise the particular tender. (c) In case Bid Security Declaration in lieu of Bid Security/Earnest Money Deposit is allowed against a tender, the provision has been made in IREPS for the bidder to mandatorily submit the following declaration along with his offer : If the bidder fails to submit the Bid security declaration, the bid will be rejected irrespective of winning the bid and qualifying for the tender.
Maintenance of BG track including lifting and Packing,Boxing and profiling, Pulling back of rails/panels, Anti-corrosive painting,De-stressing, Slewing and realigning of curves, Overhauling, Removing weeds & bushes, Cleaning of side drains, Carring out pre-tamping, during tamping and post-tamping works and other ancillary works under the jurisdiction of SSE/P.way/JRNA (For One(1) Year Period)
SCL-ENGG-72-2026~NFR
SCL-ENGG-72-2026
Open
Works - General
12 Months
Hojai, Assam
₹0
₹4.8 L
9 Oct 2026
9 Oct 2026
22 Oct 2026
81 items across 1 schedule · ₹2,40,06,275.62 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Up to 40 m long rail panel | RM | 1000.00 | 10.29 | 10,290 |
| 2 | For Casual/Scattered Rail Renewal work | RM | 3000.00 | 39.91 | 1,19,730 |
| 3 | For Casual/Scattered Rail Renewal work | RM | 3000.00 | 42.26 | 1,26,780 |
| 4 | Lubrication of Elastic Rail Clips on PSC sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as per procedure prescribed in latest edition of IRPWM. | ERC | 30000.00 | 4.49 | 1,34,700 |
| 5 | Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. | ERC | 30000.00 | 6.27 | 1,88,100 |
| 6 | By using Contractor's Grease Graphite | Each | 2500.00 | 42.55 | 1,06,375 |
| 7 | Renewal of existing SEJ with improved SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. | Set | 15.00 | 9,692.04 | 1,45,380.6 |
| 8 | 1 in 8½ Points & Crossing | Set | 15.00 | 15,082.57 | 2,26,238.55 |
| 9 | 1 in 12 Points & Crossing | Set | 15.00 | 20,530.65 | 3,07,959.75 |
| 10 | Sleepers up to 2.85 m length | Each | 4000.00 | 684.36 | 27,37,440 |
| 11 | 1 in 12 Turnout | Set | 15.00 | 4,688.64 | 70,329.6 |
| 12 | Depth of 150 mm below bottom of sleeper - For Plain Track : | TRM | 100.00 | 479.4 | 47,940 |
| 13 | Depth of 150 mm below bottom of sleeper for Turnouts | TRM | 1000.00 | 767.05 | 7,67,050 |
| 14 | Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in- charge. | TRM | 5000.00 | 201.22 | 10,06,100 |
| 15 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 40000.00 | 29.56 | 11,82,400 |
| 16 | Under Traffic Block Conditions: | cum | 6000.00 | 59.02 | 3,54,120 |
| 17 | 25mm gap 'in-situ' welding during traffic block using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. | Each | 100.00 | 1,851.75 | 1,85,175 |
| 18 | Using H3B electrodes | Each | 20.00 | 2,722.55 | 54,451 |
| 19 | Using H3B electrodes | Each | 30.00 | 3,436.95 | 1,03,108.5 |
| 20 | For one shift ( 12 Hrs) | Each | 120.00 | 1,343.29 | 1,61,194.8 |
| 21 | For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more | TRM | 40000.00 | 117.26 | 46,90,400 |
| 22 | 1 in 12 PSC layout | Set | 8.00 | 16,744.29 | 1,33,954.32 |
| 23 | Packing of isolated loose PSC sleepers on plain track below the bottom of the sleepers and surrounding through out its length duly opening two galas on either side of the renewed sleepers and packing the sleeper to bring the track to normal speed including gauging, aligning, squaring of sleepers and sectioning of ballast to the required profile with all contractor's labour, tools and plant etc. including all lead and lift and crossing of tracks where ever necessary complete and as directed by the Engineer-in-charge. | Sleeper | 1000.00 | 90.78 | 90,780 |
| 24 | For rails up to 13 metre length | TRM | 2500.00 | 40.55 | 1,01,375 |
| 25 | For rail panel above 13 metre & up to 40 metre length | TRM | 2500.00 | 44.64 | 1,11,600 |
| 26 | PSC Sleeper track - Maximum slew more than 100mm and up to 150mm | TRM | 1500.00 | 205.62 | 3,08,430 |
| 27 | PSC Sleeper track - Maximum slew more than 150mm | TRM | 1000.00 | 235.81 | 2,35,810 |
| 28 | Without Rail tensor | TRM | 20000.00 | 50.06 | 10,01,200 |
| 29 | With 2 bolts | Set | 200.00 | 123.26 | 24,652 |
| 30 | With Clamps | Set | 250.00 | 175.34 | 43,835 |
| 31 | Providing wooden blocks under weld joint duly transporting Railway's released wooden blocks with rail screw / dog spikes and doing packing, as directed under traffic condition. Note: Wooden blocks, rail screws/dog spikes will be supplied free at SSE/P.Way depot. | Each | 200.00 | 192.04 | 38,408 |
| 32 | Interchanging gauge face of rails of any section in traffic line block including removal of fittings and re-fixing the same after changing of gauge face, cutting of rails, joining the rails with fish plate & drilling holes as directed by engineer in-charge. | TRM | 500.00 | 109.66 | 54,830 |
| 33 | Cleaning of side drains along the track including disposing of muck beyond Railway boundary as per instructions of Engineer in- charge to keep drains clean and clear in cuttings etc. | RM | 50000.00 | 36.37 | 18,18,500 |
| 34 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 100000.00 | 16.74 | 16,74,000 |
| 35 | Trimming of tree branches coming within 6m of centre line of track & those obstructing views of Curves/LCs / Signal / Indicator at locations in section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. Note: Girth of more than 20 cm will only be considered as tree branch. | Each | 500.00 | 192.15 | 96,075 |
| 36 | For 52 Kg Rails | TRM | 24000.00 | 95.99 | 23,03,760 |
| 37 | Anti-corrosive painting to weld collar for Thermit welded rail joints on track for old painted joints in normal corrosive prone area for any rail section with two coats of ready mixed bituminous black paint of reputed make confirming to IS:9862 latest version on welded area up to 10cm on either side including on the underside of rail foot by brush including surface preparation as per Railway's AT Weld Manual including lettering / weld numbering with approved enamel paint as directed Note: 1.Before painting, dust, dirt and flaked paint from the welded joint shall be removed thoroughly by scrapping with wire brush. Grease and oil shall be removed by use of appropriate solvent confirming to latest IS:1745. 2.Use of detergent followed by water washing should also be done to ensure removal of oil and grease apart from the greasing compound. 3.The paint should be procured along with the thinner recommended by the manufacturer of the paint. 4.No other thinner like kerosene oil should be used. | Each | 200.00 | 29.02 | 5,804 |
| 38 | 1 in 12 Turnout | Set | 30.00 | 1,434.72 | 43,041.6 |
| 39 | Kilometre & Gradient post | Each | 200.00 | 103.89 | 20,778 |
| 40 | Hectometre Post | Each | 500.00 | 121 | 60,500 |
| 41 | LWR / SEJ Board | Each | 200.00 | 188.03 | 37,606 |
| 42 | Level Crossing Boards including Road Sign Boards | Each | 200.00 | 215.96 | 43,192 |
| 43 | Level Crossing Post | Each | 100.00 | 208.33 | 20,833 |
| 44 | Curve Post | Each | 200.00 | 111.11 | 22,222 |
| 45 | Level Crossing Boom including fringe | Metre | 100.00 | 181.32 | 18,132 |
| 46 | Level Crossing Boom without fringe | Metre | 100.00 | 147.09 | 14,709 |
| 47 | Curve Board | Each | 300.00 | 188.03 | 56,409 |
| 48 | Curve details, SE, Versine, Station Nos. etc. per station. | Each | 500.00 | 63.05 | 31,525 |
| 49 | Bridge Board | Each | 50.00 | 188.03 | 9,401.5 |
| 50 | Bridge Tablet | Each | 200.00 | 52.7 | 10,540 |
| 51 | Bridge Height Gauge | Each | 10.00 | 3,308.73 | 33,087.3 |
| 52 | For day time block working | TRM | 40000.00 | 21.32 | 8,52,800 |
| 53 | Level crossing with CC block surface | Sqm | 300.00 | 370.84 | 1,11,252 |
| 54 | Removing and refixing of guard Rails over slab bridges during machine packing with all contractor's men and materials duly removing fittings, leading guard rails to bridge approaches, lifting, dragging, positioning and crossing of track etc, and as directed by Engineer In charge. | TRM | 300.00 | 117.91 | 35,373 |
| 55 | 1 in 12 Turnouts (Under Traffic Block Conditions) | Set | 6.00 | 12,224.2 | 73,345.2 |
| 56 | Carrying out various miscellaneous works, for proper upkeep of crew rest van / rest room as directed by machine in-charge of Track Machines by providing a team of 2 labours for 12 hours shift, broadly mentioned hereunder: (1) Bringing water from nearby source and cleaning machine with water jet or any suitable means;(2) Fuelling machine duly bringing diesel / hydraulic oil from the stacked drums;(3) Bringing water to staff rest van or staff rest room, cleaning rest van / rest room, cooking food for Track Machine staff or bringing food from outside (cost of food shall be borne by the staff concerned).; (4) Guarding & watching machines, spare parts, oils, grease etc. during day and night time at all locations, wherever necessary, as instructed by the machine in-charge;(5) In case, contractor provides less no. of Labour/Mate, payment will be deducted for each such person @ 75% of the accepted item rate. | Shift | 60.00 | 1,568.06 | 94,083.6 |
| 57 | CSM / DUO / 3X with or without DGS (7.5 KVA generator and 8x500 W) | Night | 60.00 | 5,431.83 | 3,25,909.8 |
| 58 | 52 Kg - 90 UTS - Outside Track | Each | 100.00 | 300.22 | 30,022 |
| 59 | 52 Kg - 90 UTS- On Running Line | Each | 100.00 | 334.53 | 33,453 |
| 60 | Outside Track | Each | 200.00 | 63.07 | 12,614 |
| 61 | On Running Line | Each | 200.00 | 81.15 | 16,230 |
| 62 | Sleeper Spacing, Re-spacing / Squaring of sleeper by Hydraulic Sleeper Spacer with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Hydraulic Sleeper Spacer shall be as per RDSO's Specification No. TM/SM/17, dated 31.03.1992. | Each | 2000.00 | 83.2 | 1,66,400 |
| 63 | Measuring of Toe Load of ERC during service i n field by Electronic Toe Load Measuring Device with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Electronic Toe Load Measuring Device will be as per RDSO's Specification No.TM/SM/ETLMD/218 dated 13.9.2012. | Each | 500.00 | 6.03 | 3,015 |
| 64 | Extraction of jammed ERC by Heavy Duty Hydraulic Extractor with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Heavy Duty Hydraulic Extractor for jammed ERCs (10 Ton capacity) shall be used as per RDSO's Specification No. TM/SM/6, dated 8.05.1991. | Each | 500.00 | 46.64 | 23,320 |
| 65 | Tamping of track for picking up slacks in concrete sleeper track by Hand Held Off Track Tamper (Power Pack Version) with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Off-track tamper (Power Pack Version) will be as per RDSO Specification No. TM/SM/OTT/320, dated 28.01.2009. | Each | 1000.00 | 92.99 | 92,990 |
| 66 | Lead beyond 30 Km and up to 50 km | MT | 20.00 | 471.16 | 9,423.2 |
| 67 | Lead beyond 50 Km and up to 100 Km | MT | 50.00 | 697.45 | 34,872.5 |
| 68 | Lead beyond 100 Km and up to 150 Km | MT | 100.00 | 1,036.09 | 1,03,609 |
| 69 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 50000.00 | 3.46 | 1,73,000 |
| 70 | Fabrication including cutting, bending/machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway's approved drawings & specifications for level crossings / trolley paths/inspection lines in yards duly cutting rail flanges, wherever required to correct alignment and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores. | TRM | 60.00 | 1,239.83 | 74,389.8 |
| 71 | Cutting foot of rail by gas or any other approved method for check rails and grinding sharp edges into smooth profile. Payment shall be made for length of cutting of foot. | RM | 100.00 | 183.83 | 18,383 |
| 72 | Fixing check rails to running rails on level crossings with MS brackets, MS packing plates, bolts & nuts, spring washers etc. including lubrication as per approved drawing & specifications, as directed. Rails, MS brackets, packing plates, bolts & nuts, spring washers will be supplied by Railways. Note: One set consists two check Rails. | Set | 10.00 | 5,638.07 | 56,380.7 |
| 73 | Painting of running rails and check rails of any rail section of level crossing with anti- corrosive paint on both sides of web, foot etc. including liner contact area (excluding bottom of foot) and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including painting of liners, ERC surface preparation, i.e. cleaning with wire brush / sand paper as a complete job as per Para No 613 (2)(b)(iii) of Indian Railways Permanent Way Manual, as directed by Engineer in-Charge. | RM | 750.00 | 63.38 | 47,535 |
| 74 | With enamel paint (two coats) | Sqm | 500.00 | 141.73 | 70,865 |
| 75 | Renewal of existing running rail and guard rails of all sections on bridge portion over Steel Channel sleepers/PSC sleepers under traffic block including leading of new rails, fittings, refixing all the fastenings as per approved drawings including cutting of rails, drilling of holes to running and guard rails as required as per drawing and leading back the released rails and fittings and stacking at nominated place clear of infringements with all leads & lifts tools and consumables complete and as directed. | TRM | 100.00 | 850.82 | 85,082 |
| 76 | Involving Rubber Pad | Each | 100.00 | 65.65 | 6,565 |
| 77 | Manufacture & supply of 10mm thick Grooved Rubber Pads as per drg. No. RDSO/T-5199 & RDSO's Spec. no. IRS-T-47-2006 (Prov.) from RDSO approved sources with all contractor's lead, lift, labour, tools, plant and transportation etc. complete as instructed by Engineer in-charge. Note: One set constitutes two nos. | Set | 50.00 | 408.35 | 20,417.5 |
| 78 | Manufacture & supply of Elastomeric Pads 25mm / 30mm thick as per RDSO drawing No. B/1636/I/R2 to suit Insulated steel channel sleepers from RDSO approved sources with all contractor's material, lead, lift, labour, tools, plant and transportation etc. complete and as instructed by Engineer in-charge. Note: One set constitutes two nos. | Set | 40.00 | 2,242.12 | 89,684.8 |
| 79 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 100.00 | 827.84 | 82,784 |
| 80 | Tractor with Trolley for local transportation or other misc. works. | Hour | 100.00 | 365.64 | 36,564 |
| 81 | Supplying and filling 50 kg size empty cement polythene bags with Rly. Ballast/moorum/earth/Sand/quarry dust etc. placing the filled bags on the high banks /bridge approaches/nominated place etc. dumping and spreading at the nominated locations to profile under block period with all contractor's labour, tools, plants, loading, unloading, filling, spreading including all lead/lift etc. complete and as directed by the Engineer in charge at site including crossing of track where necessary. | Each | 2000.00 | 17.83 | 35,660 |
| Schedule total | ₹2,40,06,275.62 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TENDER DOCUMENT
ATTACHMENT
UPDATED GCC
ATTACHMENT
ACS11GCCWorks2026March1_compressed.pdf ACS 11
ATTACHMENT
TD-72-20260910_compressed_compressed.pdf
ATTACHMENT
GCC-2022-updated1512_compressed1-compressed.pdf
ATTACHMENT
ACS11GCCWorks2026March1_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .