Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance GAT NO 304 AT POST KONDHAPURI PUNE NAGAR ROAD SHIRUR PUNE MAHARASHTRA 412209 | PUNE | MAHARASHTRA | 412209 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
19 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (CONTRACTS)
OFFICE OF DGM CONTRACTS MATHURA REFINERY
Design, Engineering, Procurement, Manufacturing, Testing, Supply, Site Installation, commissioning assistance and PGTR of CDU and VDU column Modifications at Mathura Refinery
2024_MR_175993_1
MRCC23P070
Single
Consultancy Works
Works
730 days
MATHURA REFINERY
3 documents required · 3 mandatory
Exempted
20 Mar 2024
12 Mar 2024
20 Mar 2024
12 Mar 2024
19 Mar 2024
12 Mar 2024
Amount
SP-1:Materials cost
S. no. (1) Supply of all imported/indigenous materials required for permanent incorporation to set up the unit/facility/works complete in all respects including commissioning and mandatory spares (if required) made up as follows:
S. no. (1.1) Materials: Material supply cost of CDU & VDU columns proposed modifications as per licensor recommendation
SP-2:Service cost
S. no. (1.1) DESIGN & ENGINEERING Cost of CDU & VDU column modification: Designing and carrying out basic and detail engineering for CDU & VDU column proposed modifications and getting approval of the same from IOCL as per the requirements indicated in the tender documents
S. no. (1.2) ERECTION, INSTALLATION & COMMISSIONING SERVICES ETC COST : Providing services for all jobs, pre–fabrication, fabrication, mock up assembly of supplied materials, erection, construction, installation during shutdown, testing , pre–commissioning, mechanical completion, commissioning required for completing and establishing the plant/facilities as a fully functional and operative Unit, including (but not limited to) providing all labours and manpower, resources, heavy equipment like crane, hydra, tractor & trolley etc irrespective of size, capacity, type and quantity as per tender requirement, transportation , store management , construction equipment, lifting tools & tackles and aids, special tools and tackles, safety devices, testing devices, facilities , utilities, communication systems, material and other reconciliations, handing over of final drawings/ documents/manuals, obtaining and satisfying all statutory licenses, clearances, consents, no objections, approvals and certificates and complying with all statutory approvals/formalities etc. and all other services whatsoever required for completing the works in all respects in accordance with the contract documents of the plant as per direction of E-I-C.
S. no. (1.2.1) Site execution cost for CDU & VDU columns proposed modifications as per licensor recommendations including supervision charges
S. no. (1.3) Charges for conducting and completing CDU & VDU columns PGTR successfully as per tender scope, terms and conditions.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .