Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.7 LAccepted-Finance | ₹28.7 L | 1 | Accepted-Finance 1 |
| 2 | 2₹31.3 LAccepted-Finance | ₹31.3 L | 2 | Accepted-Finance 2 |
| 3 | 3₹32.7 LAccepted-Finance | ₹32.7 L | 3 | Accepted-Finance 3 |
| 4 | 4₹33.8 LAccepted-Finance | ₹33.8 L | 4 | Accepted-Finance 4 |
| 5 | 5₹35.7 LAccepted-Finance | ₹35.7 L | 5 | Accepted-Finance 5 |
Tender Value
₹53.2 L
EMD Value
₹1.6 L
Closing Date
3 Jun 2026, 2:00 pmClosed
Executive Engineer Jal Shakti PHE Div. Bijbehara
Executive Engineer Jal Shakti PHE Div. Bijbehara
Construction of 3No. storage tanks of capacity 50000Lts Each for fire safety arrangements at sheshnag base camp during SANJAY 2026-2 (under Tourism Capex).
2026_PHE_311136_1
14/PHE/BIJ OF 2026-27
Open Tender
Civil Works - Water Works
pahalgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
Executive Engineer Jal Shakti PHE Div. Bijbehara
₹1.6 L
Yes
15 Jun 2026
29 May 2026
3 Jun 2026
29 May 2026
3 Jun 2026
29 May 2026
29 May 2026 - 3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | - | - | - | - | 1 |
| 2 | All Kinds of Soil | 182.76 | Cum | 652.19 | ₹1,19,194.24 | 2 |
| 3 | Ordinary Rock | 78.33 | Cum | 1,034.33 | ₹81,019.07 | 3 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth ..and disposal of surplus excavated earth as | - | - | - | - | 4 |
| 5 | All Kinds of Soil | 297.69 | Cum | 527.23 | ₹1,56,951.1 | 5 |
| 6 | Ordinary Rock | 127.59 | Cum | 1,017.28 | ₹1,29,794.76 | 6 |
| 7 | Laying and fitting of HDPE pipes (all classes) complete excluding cost of pipes, and Earth work. 63 mm hdpe | 2,100 | mtr | 27.5 | ₹57,750 | 7 |
| 8 | Making Connections of G.I branch with G.I main including providing & Fixing Tees etc Complete. | - | - | - | - | 8 |
| 9 | Above 40 mm | 9 | no. | 1,525.98 | ₹13,733.78 | 9 |
| 10 | Below 40 mm | 6 | no. | 803.28 | ₹4,819.65 | 10 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1007477.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
BOQ_1007477.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid