| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 CrAdmitted-Finance 130A 18TH FLOOR INFINITY BUSINESS CENTRE PLOT GI BLOCK GP SALTLAKE SEC V KOLKATA 700091 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹20.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWACH ENVIRONMENT PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Section A: SUPPLY, INSTALLATION AND COMMISSIONING OF WATER TREATMENT SYSTEM AT HALDIA TOWNSHIP, HALDIA, HDC | ||||
| 1.10 | Supply, installation and commissioning of water treatment process and associated installations all complete and as directed. | 3 | Units | 1,67,55,552 ₹5,02,66,656 Lowest |
| 1.20 | Necessary civil works for installation and successful commissioning of the Water treatment process and associated installations viz. including design and constructions of foundations, drains, drain sumps, structures, sheds, supports of all types, platforms, drain channels, plants buildings, office buildings, In-house laboratories for testing, toilets, mass concreting of units, necessary plumbing, sewerage systems, boundary wall with fencing, gate, etc. (as required), all complete and as directed. | 3 | Units | 2,09,44,440 ₹6,28,33,320 Lowest |
| 1.30 | Necessary electro-mechanical works for installation and successful commissioning of Water treatment process and associated installations viz. all cabling, earthing, illumination, supply of cables, cable trays, local push buttons, MCC, control panel, etc. (as required), all complete and as directed. | 3 | Units | 41,88,888 ₹1,25,66,664 Lowest |
| 2.00SECTION B: OPERATION AND MAINTENANCE (O&M) CONTRACT OF WATER TREATMENT SYSTEM AT HALDIA TOWNSHIP, HALDIA, HDC FOR A PERIOD OF 06 (SIX) YEARS. | ||||
| 2.10 | Operation and maintenance of water treatment process and associated installations (as mentioned above) during one (01) year defect liability period including required manpower, consumables, spares, etc. for uninterrupted treated water supply etc., all complete and as directed. 01 year defect liability period will commence after successful commissioning of the above system. | 3 | Units | 45,11,328 ₹1,35,33,984 Lowest |
| 2.20Operation and maintenance of water treatment process and associated installations (as mentioned above) for 05 years (after completion of 01 year defect liability period) including required manpower, consumables, spares, etc. for uninterrupted treated water supply etc., all complete and as directed. | ||||
| 2.21 | 1st Year after completion of Defect Liability Period (including spares, consumables, manpower, etc., as required). | 3 | Units | 45,11,328 ₹1,35,33,984 Lowest |
| 2.22 | 2nd Year after completion of Defect Liability Period (including spares, consumables, manpower, etc., as required). | 3 | Units | 45,11,328 ₹1,35,33,984 Lowest |
| 2.23 | 3rd Year after completion of Defect Liability Period (including spares, consumables, manpower, etc., as required). | 3 | Units | 45,11,328 ₹1,35,33,984 Lowest |
Tender Value
₹12.9 Cr
EMD Value
₹22.9 L
Closing Date
22 Sept 2025, 3:00 pmClosed
General Manager (Engineering)
Haldia Dock Complex
DC, STC OF WATER TREATMENT SYSTEM WITH BACK WASH WATER RECYCLING SYSTEM FOR IMPROVEMENT OF THE QUALITY OF WATER SUPPLIED TO RESIDENTIAL ZONE AT HALDIA TOWNSHIP UNDER HDC INCLUDING OPERATION AND MAINTENANCE FOR A PERIOD OF 06 YEARS ON EPC MODE
2025_KoPT_870785_1
I and CF/SDM/RZ/ET/140
Open Tender
Job Works
Works
Haldia
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Syama Prasad Mookerjee Port, Kolkata, HDC
₹22.9 L
Office of General Manager (Engineering)
19 Jun 2026
7 Aug 2025
23 Sept 2025
7 Aug 2025
22 Sept 2025
7 Aug 2025
19 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Section A: SUPPLY, INSTALLATION AND COMMISSIONING OF WATER TREATMENT SYSTEM AT HALDIA TOWNSHIP, HALDIA, HDC | |||||
| 1.1 | Supply, installation and commissioning of water treatment process and associated installations all complete and as directed. | - | Units | - | - |
| 1.2 | Necessary civil works for installation and successful commissioning of the Water treatment process and associated installations viz. including design and constructions of foundations, drains, drain sumps, structures, sheds, supports of all types, platforms, drain channels, plants buildings, office buildings, In-house laboratories for testing, toilets, mass concreting of units, necessary plumbing, sewerage systems, boundary wall with fencing, gate, etc. (as required), all complete and as directed. | - | Units | - | - |
| 1.3 | Necessary electro-mechanical works for installation and successful commissioning of Water treatment process and associated installations viz. all cabling, earthing, illumination, supply of cables, cable trays, local push buttons, MCC, control panel, etc. (as required), all complete and as directed. | - | Units | - | - |
| 2SECTION B: OPERATION AND MAINTENANCE (O&M) CONTRACT OF WATER TREATMENT SYSTEM AT HALDIA TOWNSHIP, HALDIA, HDC FOR A PERIOD OF 06 (SIX) YEARS. | |||||
| 2.1 | Operation and maintenance of water treatment process and associated installations (as mentioned above) during one (01) year defect liability period including required manpower, consumables, spares, etc. for uninterrupted treated water supply etc., all complete and as directed. 01 year defect liability period will commence after successful commissioning of the above system. | - | Units | - | - |
| 2.2 | Operation and maintenance of water treatment process and associated installations (as mentioned above) for 05 years (after completion of 01 year defect liability period) including required manpower, consumables, spares, etc. for uninterrupted treated water supply etc., all complete and as directed. | - | - | - | - |
| 2.21 | 1st Year after completion of Defect Liability Period (including spares, consumables, manpower, etc., as required). | - | Units | - | - |
| 2.22 | 2nd Year after completion of Defect Liability Period (including spares, consumables, manpower, etc., as required). | - | Units | - | - |
| 2.23 | 3rd Year after completion of Defect Liability Period (including spares, consumables, manpower, etc., as required). | - | Units | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_917030.xls
BOQ • 0.28 MB
Tender_Document-140.pdf
PDF • 2.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].