Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Admitted |
| 2 | Accepted-Technical | Accepted-Technical Admitted |
| 3 | Accepted-Technical R O CHUCHOT LEH LADAKH UT | Accepted-Technical Admitted |
| 4 | Accepted-Technical | Accepted-Technical Admitted |
| 5 | Accepted-Technical | Accepted-Technical Admitted |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
10 Apr 2026, 4:00 pmClosed
Executive Engineer Igoo Phey Division Leh
Executive Engineer Igoo Phey Division Leh
Construction of Culverts /Minor Bridges over Igo phey canal
2026_PWD_18581_2
E-Tender 30 of IPD Leh of 2025-26
Open Tender
Civil Works - Others
90 days
leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Executive Engineer Igoo Phey Division Leh
₹2.4 L
16 Apr 2026
3 Apr 2026
11 Apr 2026
3 Apr 2026
10 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5min width or 10 sqm on plan), including dressing of sides and ramming of bottoms, liftupto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m. All kinds of soil. | 322.4 | Cum | - | - | item 01 |
| 2 | Providing and laying soling stone hand packed, including carriage complete job. | 10.2 | Cum | - | - | 4 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.2 | Cum | - | - | 5 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level,excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | 263 | Cum | - | - | 6 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size). | 107.4 | Cum | - | - | - |
| 6 | Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more.. | 44,448 | Kg | - | - | - |
| 7 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete1:6:12(1cement :6coarse sand:12graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) | 38.4 | Cum | - | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for :Columns, piers, abutments, pillars, posts and struts. | 301.2 | Sqm | - | - | - |
| 9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 86.16 | Sqm | - | - | - |
| 10 | Suspended floors, roofs, landings, balconies and access platform | 90 | Sqm | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_44800.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid