| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.9 LAccepted-AOC NO 9 1ST FLOOR C J N HERITAGE PWD MAIN ROAD AKASH NAGAR B NARAYANAPURA DOORAVANI NAGAR BANGALORE 560016 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560016 | ₹44.9 L | L1 | Accepted-AOC being L1 |
| 2 | L2₹45.8 L+₹86,949 (1.94%)Rejected-Finance BUILDING NO FLAT NO 19 6TH CROSS ROAD SANJEEVINI NAGAR MUDALAPALYA BANGALORE 560072 | BANGALORE | BANGALORE | KARNATAKA | 560072 | ₹45.8 L+₹86,949 (1.94%) | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹47.4 L+₹2.5 L (5.50%)Rejected-Finance | ₹47.4 L+₹2.5 L (5.50%) | L3 | Rejected-Finance Rejected being L3 |
| 4 | L4₹49.5 L+₹4.6 L (10.3%)Rejected-Finance NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹49.5 L+₹4.6 L (10.3%) | L4 | Rejected-Finance Rejected being L4 |
| 5 | Not Admitted-Fee/PreQual/Technical 8 6TH CROSS MATHRU SHREE NILAYA OPP MAHARISHI RESIDENCE KAGGADASAPURA CV RAMAN NAGAR BANGALORE 560 093 | BENGALURU URBAN | KARNATAKA | 560093 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
12 May 2022, 6:00 pmClosed
GE RD East Bangalore
GE I RD East Bangalore 93
REPAIR MAINTENANCE OF CENTRAL AC PLANTS AND PACKAGE TYPE AC PLANT AT CABS STIR DARE BANGALORE
2022_MES_516394_1
8213
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE RD East Bangalore
D c (i)
9 documents required · 9 mandatory
₹500
Yes
GE I R AND D East Bangalore
₹92,000
Yes
3 Oct 2022
4 Apr 2022
14 May 2022
4 Apr 2022
12 May 2022
30 Apr 2022
5 Apr 2022 - 15 Apr 2022
Amount
Materail and labour for Preventive maintenance of 14 nos AHU cooling coil by taking out pre filter frame, cleaning of cooling coil and cleaning of AHU and cleaning of dampers refixing all removed parts, checking the operations of all safety devices, cleaning of electrical contacts, checking the electric circuits, testing, commissioning etc installed at DARE system, all as directed by Engineer - in - Charge.
Materail and labour for cleaning of 11 nos AHU cooling coil by taking out pre filter frame, cleaning of cooling coil and cleaning of AHU, cleaning of dampers refixing all removed parts, checking the operations of all safety devices, cleaning of electrical contacts, checking the electric circuits, testing, commissioning etc installed at STIR campus all as directed by Engineer - in - Charge.
Dismantling 1 nos of screw compressor from 250 TR capacity chiller carefully with using hydraulic jack & chain pulley, putting dummy plates to suction & discharge line & transporting to authorized workshop for repair, etc and refixing the same in the original place all as directed at DARE.
Dismantling 1 nos of screw compressor from 150 TR capacity chiller carefully with using hydraulic jack & chain pulley, putting dummy plates to suction & discharge line & transporting to authorized workshop for repair, etc and refixing the same in the original place all as directed. At STIR
Dismantling of burnt out stator from screw compressor body, cutting, opening of burnt-out winding, rewinding with the same gauge of copper conductor of F class oil proof insulation applying one coat of varnish and kept at the electric oven and heated for 48 hours and refixing the same in the original place all as directed. at DARE & STIR.
Pressure Testing each circuit of carrier make 30GX & 30XA model chiller for refrigerant leak by evacuating refrigerant gas from the circuit into the empty cylinder, leak testing of the circuit with nitrogen (N2) pressure by separating the entire system like low side, high side compressor condensers and rectifying the leakage vacuuming re-charging of evacuated refrigerant gas and testing complete all as directed. Note: Topping up of gas will be measured separately for DARE & STIR.
M & L for Complete Overhauling of one 06NA Compressor in 250 TR chiller unit by opening the compressor end plate, removing the gear assembly with gear puller, removing the hydraulic chamber, removing the twin screws using puller, removing the bearing sets, O rings, rotor, terminal bolts and stator. Clean the entire mechanical parts with approved cleaning agent and oil the parts. Checks all the mechanical parts for wear & tear and replace if required. Reassemble the dismantled parts carefully by using required tools and tackles. Refix the twin screws and checks the alignment of screws for smooth operation. Refix the stator along with terminals, fix the gear assembly and hydraulic chamber. Checks the alignment of screws and gear assembly for smooth rotation. Refix the endplates and tightened the bolts and complete the overhauling all as per standard procedure.
Complete Overhauling of one 06T Compressor in 150 TR chiller unit by opening the compressor endplate, removing the gear assembly with gear puller, removing the hydraulic chamber, removing the twin screws using puller, removing the bearing sets, O rings, rotor, terminal bolts and stator. Clean the entire mechanical parts with approved cleaning agent and oil the parts. Checks all the mechanical parts for wear & tear and replace if required. Reassemble the dismantled parts carefully by using required tools and tackles. Refix the twin screws and checks the alignment of screws for smooth operation. Refix the stator along with terminals, fix the gear assembly and hydraulic chamber. Checks the alignment of screws and gear assembly for smooth rotation. Refix the endplates and tightened the bolts and complete the overhauling all as per standard procedure. at STIR
Dismantling of winding from defective condenser fan motor and rewinding, with the same gauge of copper conductor and kept at electrical oven and heated for 48 hours and refixing the same in original place and all as directed. at DARE.
M & L for General servicing and preventive maintenance of the 250 TR chiller unit. Pressure cleaning of the condenser coil, leak testing of the entire refrigeration circuit, checking the operations of all safety devices, cleaning of electrical contacts, checking the electric circuits all as directed at DARE
M & L for General servicing and preventive maintenance of the 150 TR chiller unit. Pressure cleaning of condenser coil, leak testing of the entire refrigeration circuit, checking the operations of all safety devices, cleaning of electrical contacts, checking the electric circuits all as directed at STIR
M & L for Painting with one coat of enamel paint for complete package type AC plant of capacity 250TR completely to all connected items of the plant with different tent colour including motor of blowers/pipes lines with different colour all as directed by Engr-in-Charge.
M & L for Painting with one coat of enamel paint for complete package type AC plant of capacity 150TR completely to all connected items of the plant with different tent colour including motor of blowers/pipes lines with different colour as existing colour yard at stir complex all as directed by Engr-in-Charge.
Supply and Fixing of dual core internal oil filter suitable for 250 TR capacity chiller unit of carrier at DARE Make. Filtration Level - 3 µ, No. 06NA660028S
Supply and Fixing of external oil filter suitable for 250 TR capacity chiller unit of carrier at DARE Make. Filtration Level - 10 µ. No. 30GX417132E
Supply and Fixing of external oil filter suitable for 150TR capacity chiller unit of carrier at STIR Make. Filtration Level - 10 µ. No. 30GX417132E
Supply and Fixing of drier suitable for 250 capacity chiller liquid line. No. XW12EA003 at DARE
Supply and Fixing of drier suitable for 150 TR capacity chiller liquid line. No. XW12EA003 at STIR
Supply and Fixing of Oil level switch suitable for 250 capacity chiller at DARE
Supply and Fixing of Oil level switch suitable for 150 capacity chiller at STIR
Supply & Replacement of Carrier make HP transducer. No. OP12DA039EE
Supply & Replacement of Carrier make LP transducer. No. OP12DA040EE
Supply & Replacement of Carrier make Oil pressure transducer. No. OP12DA040EE
Supply & Replacement of Carrier make Temperature Sensor. No. 30RB 660 036
Supply and replacement of internal bearings suitable for carrier 6 NA screw compressor by opening the compressor endplate, removing the gear assembly with a gear puller, removing the hydraulic chamber, removing the twin screws using a puller, removing the bearing sets, O rings, rotor, terminal bolts, and stator. Clean the entire mechanical parts with an approved cleaning agent. Replace the bearing sets as per the standard procedure. Reassemble the dismantled parts carefully by using the required tools and tackles. Refix the twin screws and checks the alignment of screws for smooth operation. Refix the stator along with terminals to fix the gear assembly and hydraulic chamber. Checks the alignment of screws and gear assembly for smooth rotation. Refix the endplates and tightened the bolts all as per the standard procedure for DARE .
Supply and replacement of internal bearings suitable for carrier 6T screw compressor by opening the compressor endplate, removing the gear assembly with a gear puller, removing the hydraulic chamber, removing the twin screws using a puller, removing the bearing sets, O rings, rotor, terminal bolts, and stator. Clean the entire mechanical parts with an approved cleaning agent. Replace the bearing sets as per the standard procedure. Reassemble the dismantled parts carefully by using the required tools and tackles. Refix the twin screws and checks the alignment of screws for smooth operation. Refix the stator along with terminals to fix the gear assembly and hydraulic chamber. Checks the alignment of screws and gear assembly for smooth rotation. Refix the endplates and tightened the bolts all as per the standard procedure for STIR
Supply and topping up of compressor oil suitable for carrier make screw Compressor oil (SW 220 grade Synthetic Screw Compressor Oil) for DARE
Supply and charging of 134a refrigerant gas for carrier screw chiller at DARE
Supply & Replacement of defective contactor for the condenser fan motor. (Siemens make 3RT1016 Contactor, 3pole, 10 Amps) for Carrier GX model Chillers at DARE
Supply & Replacement of defective bearings of the condenser fan motor. No. 6204, 6205 at DARE
Supply & Replacement of defective contactor with new contactor 160 A, 3 Pole . (Make: Siemens 3TF51)
Supply & Replacement of defective contactor with new contactor 100 A, 3 Pole . (Make: Siemens 3TF48)
Supply & Replacement of defective contactor up to 50A, with new contactor. (Make: L&T,Siemens, ABB)
Supply & Replacement of defective EXV board of 30GX model Carrier make screw chiller by Isolation the power to the Chiller unit, Remove the connections to the EXV board carefully, remove the EXV board from the chiller control panel, Fix the new EXV board carefully and reconnect the connections to the EXV board complete all as per the standard procedure. at DARE .
M & L for Replacement of defective EXV board of 30 XA model Carrier make screw chiller by Isolation the power to the Chiller unit, Remove the connections to the EXV board carefully, remove the EXV board from the chiller control panel, Fix the new EXV board carefully and reconnect the connections to the EXV board complete all as per the standard procedure. at STIR
Supply & Replacement of defective Flow Sensor of 30GX model Carrier make screw chiller by Isolating the Butterfly valve, Remove the electrical conection carefully, remove the Flow sensor from the chilled water pipe line, Fix the new flow sensor carefully and reconnect the electrical connections to the flow sensor complete all as per standard procedure at DARE.
Supply & Replacement of defective Electronic Expansion valve of 30GX modle carrier make chiller by isolation the power to the chiller unit, Removing the connections of Electronic expansion valve carefully, isolate the refrigerant by closing the services valve, de-braze and removing the valve from ckt, fixing of new valve in the ckt with brazing,pressure testing the ckt, reconnecting the connections to the valve complete all as per standard procedure at DARE
Supply & Replacing of defective 22kw VFD of chiller water pump by isolation the power to pump panel removing the connections to VDF carefully, fix with new VDF reconnect the connections and re-commission the VDF al as per standard procedure, Make:- SEIMENS, Modle SED222/32B ,or equalent at DARE
Supply and replacement of removable type factory made metallic pre-filter of 20 microns of standard size with GI frame both side including removing of unserviceable metallic pre-filters all as directed. Make: AEROSOL/MAF/DYNA/JOHNFLOWER
Supply and replacement of factory made High Performance Bag Filters of 95% down to 5 micron of standard size with multiple-pockets & self supporting filter bags with MS/ GI/Anodised Aluminium Frame suitable for central air conditioning plant including replacement of bolt nuts and taking out unserviceable Bag filters complete all as directed by Engineer-in-charge.Make: Aerosol/ John Flower/ Dyna/ Sri Sai
Disconnecting and removing of the induction motor from the existing position of the following capacity of any make checking of the motor for its serviceability and transporting to workshop, opening up, cutting and removing of the burnt out winding, rewinding with same gauge of copper conductor insulating, varnishing, greasing etc., complete, reassemble, testing at work shop bring back to site re-fixing back in the original position reconnecting, testing and commissioning complete all as directed.
All as per item No 41 above, but size 7.5HP to 10 HP capacity induction motor
All as per item No 41 above, but size 5 HP to7.5 HP capacity induction motor
All as per item No 41 above, but size 10 HP to 20 HP capacity induction motor
Disconnecting and removing of the Pump 20 HP to 30 HP capacity from the existing position of the following capacity of any make checking of the motor for its serviceability and transporting to workshop, opening up, cutting and removing of the burnt out winding, rewinding with same gauge of copper conductor insulating, varnishing, greasing etc., complete, reassemble, testing at work shop bring back to site re-fixing back in the original position reconnecting, testing and commissioning complete all as directed.
Supply and fixing of bearing of the following capacity induction motor including removing of unserviceable bearing all as specified and as directed.
All as per item No 46 above, but size 7.5HP to 10 HP capacity induction motor
All as per item No 46 above, but size 5 HP to7.5 HP capacity induction motor
All as per item No 46 above, but size 10 HP to 20HP capacity induction motor
Supply and fixing of bearing of the following capacity Pump including removing of unserviceable bearing all as specified and as directed.
All as per item No 50 above, but size 20HP to 30 HP capacity Pump
Supply and fix overload relay for following capacity including taking down unserviceable overload relay etc all as directed
All as per item No 52 above, but size Up to 32 amps
All as per item No 52 above, but size 63 amps to 100 amps
Supply and fix water pressure gauges of 4 or 2” dia of the following range with necessary flare nuts, adopter including removing of the unserviceable all as directed. Make: KI/FEIBIG/H GURU. 0-150 PSI or equivalent in Kg/cm2
Supply and fix V-belts of the following sizes (in inches) all as directed including removing unserviceable belt. Make : FENNER/DUNLOP/ VITTON/PIX
Up to B-120
Up to C-120
Up to A-36
Supply and fix syphon connection 15 mm dia made out of SS pipe suitable for fixing of pressure gauge including ½ an inches dia stop valve and taking down unserviceable syphon connection etc all as directed.
Supply and fix water pressure cut out 0-8 kg pressures 15 mm dia including taking out unserviceable water pressure gauge etc all as directed.
Supply and Replacing of defective VFD up to 15 Kw of AHU panel removing the connections to VFD carefully, fix with new VFD reconnect the connections and re-commission the VFD all as per standard procedure, Make:- SEIMENS or equalent at DARE
15 Kw VFD
11 Kw VFD
7.5 Kw VFD
Supply and replacing of defective mixing valves of AHU, pumps, removing carefully, fix with new mixing valves all as per standard procedure.
2 way mixing valve with Actuator Make: Siemens/Johnson Controlls
3 way mixing valve with Actuator Make: Siemens/Johnson Controlls
Outsourcing of services for maintenance and operation (including repairs) of 3 x 250 + 3 x 15 and 7 x 7.5 TR capacity air cooled chilled water air conditioning plant complete with 250TR capacity scroll compressor, pump sets, air handling units complete operating with fully computerized building management system (BMS) including all other connected air conditioning system and equipment in two shifts all as directed by Engineer-in-Charge Shift timings :- General shift from 0800 hours to 1700 hrs on all days except Sundays and General Holidays ( Lunch break one hour) Minimum operating staff to be employed :- 1. Ref Mech - 01 No 2. Helper - 01 Nos
Items to be maintained and operated are as under :- (a) Maintenance for 3 x 15TR package AC and 7 x 7.5TR capacity duct able units consists of daily inspection and checking of all electrical control panels, supply and return diffusers, refrigerant gas, leak testing and weekly inspection and checking of distribution duct systems, checking and cleaning of all electrical motors, belt and fan blades, alignment checking , refrigerant pipe line insulation checking etc. including rectification of any faults as occured /replacement of parts as required by authorised service agent of installed system to keep the system function properly according to the manufactures parameters as set, complete all as directed.
(b) Maintenance for Air Handling Units connected to 750TR capacity chillers package units installed at DARE with different capacities (14 units) by daily checking of electrical cable panel, VFD switches, checking of AHU propellers and weekly inspection and necessary repairs of all system/ replacement of parts as required connected to AHU including cleaning of pre -micro filters, AHU shaft bearing alignment, checking of cooling coil etc. to keep the system function properly according to the manufacturers parameters as set by authorised service agent to installed system complete all as directed .
(c) Maintenance of computerised building management systems connected to 750TR capacity chiller package units installed at DARE consists of weekly inspection and checking of all electronic devices, VFDs, pneumatic actuator, including rectification of any faults as occured/ replacement of parts as required by authorised service agent of installed system to keep the system function properly according to the manufacture's parameters as set, complete all as directed.
Supply & Replacement of door beeding for Carrier Chiller control panel all as directed.
RAHUL ENTERPRISES
Sahara Engineers
UNIVERSAL ENGINEERING
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .