| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.8 L+₹98,105 (3.95%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹26.2 L+₹1.4 L (5.71%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹27.0 L+₹2.2 L (8.70%)Rejected-Finance 01 ENTERPRISES | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹28.3 L+₹3.5 L (14.0%)Rejected-Finance SIDDHARTH ENCLAVE NEAR JINDAL FACTORY RAMNAGAR ROORKEE 247667 | HARIDWAR | UTTARAKHAND | 247667 | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | M/s Luxmi Constructions L7 | Singla Enterprises L4 | RAMA AUTOS L2 | GARG INFRA PROJECTS L8 | Rasvinderpalandco L6 | KAY VEE CONSTRUCTIONS L1 | REYANSH GARG AND COMPANY L3 | ANANT ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for opening the existing manhole cover and removing/extracting liquid, sludge, silt, solid waste and other obstructions from manhole chambers (in foul condition or as directed) of any shape and size, having depth not exceeding 1.50 m, including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted hydro-jet sewer cleaning machine equipped with sewage/sludge collection tank, wash-down system, suction derrick arm, hydraulically operated spring-loaded rotary sliding vane compressor, V-hose, end-section nozzle, strainer and all other necessary accessories. The item shall include jetting, suction, cleaning and flushing of the manhole chamber and connected sewer line, temporary stopping/diversion of sewage flow by means of sand bags, gunny bags or other approved methods wherever required during cleaning operations, removal of such temporary obstructions after completion of cleaning to restore normal sewage flow, collection, transportation and disposal of extracted sludge/waste in closed containers outside MD land premises, and reinstatement of the manhole cover in its original position after completion of the work, complete in all respects as specified and directed by the Engineer-in-Charge. | 660 | Each Job | 126 ₹83,160 | 120 ₹79,200 | 200 ₹1,32,000 | 100 ₹66,000 Lowest | 250 ₹1,65,000 | 235 ₹1,55,100 | 190 ₹1,25,400 | 220 ₹1,45,200 |
| 2.00 | Material and labour for opening the existing manhole cover and removing/extracting liquid, sludge, silt, solid waste and other obstructions from manhole chambers (in foul condition or as directed) of any shape and size, having depth exceeding 1.50 m but not exceeding 3 m, including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted hydro-jet sewer cleaning machine equipped with sewage/sludge collection tank, wash-down system, suction derrick arm, hydraulically operated spring-loaded rotary sliding vane compressor, V-hose, end-section nozzle, strainer and all other necessary accessories. The item shall include jetting, suction, cleaning and flushing of the manhole chamber and connected sewer line, temporary stopping/diversion of sewage flow by means of sand bags, gunny bags or other approved methods wherever required during cleaning operations, removal of such temporary obstructions after completion of cleaning to restore normal sewage flow, collection, transportation and disposal of extracted sludge/waste in closed containers outside MD land premises, and reinstatement of the manhole cover in its original position after completion of the work, complete in all respects as specified and directed by the Engineer-in-Charge. | 250 | Each Job | 180 ₹45,000 | 120 ₹30,000 | 220 ₹55,000 | 100 ₹25,000 Lowest | 250 ₹62,500 | 255 ₹63,750 | 200 ₹50,000 | 220 ₹55,000 |
| 3.00 | Material and labour for opening the existing manhole cover and removing/extracting liquid, sludge, silt, solid waste and other obstructions from manhole chambers (in foul condition or as directed) of any shape and size, having depth exceeding 3 m but not exceeding 4.5 m, including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted hydro-jet sewer cleaning machine equipped with sewage/sludge collection tank, wash-down system, suction derrick arm, hydraulically operated spring-loaded rotary sliding vane compressor, V-hose, end-section nozzle, strainer and all other necessary accessories. The item shall include jetting, suction, cleaning and flushing of the manhole chamber and connected sewer line, temporary stopping/diversion of sewage flow by means of sand bags, gunny bags or other approved methods wherever required during cleaning operations, removal of such temporary obstructions after completion of cleaning to restore normal sewage flow, collection, transportation and disposal of extracted sludge/waste in closed containers outside MD land premises, and reinstatement of the manhole cover in its original position after completion of the work, complete in all respects as specified and directed by the Engineer-in-Charge. | 15 | Each Job | 225 ₹3,375 | 120 ₹1,800 | 295 ₹4,425 | 100 ₹1,500 Lowest | 250 ₹3,750 | 280 ₹4,200 | 320 ₹4,800 | 220 ₹3,300 |
| 4.00Note for above srl item 1 to 3 of BOQ : (i) The unit of measurement shall be Each Job. The rate quoted shall be deemed to include cleaning of the manhole chamber as well as the connected sewer line from the preceding manhole to the subject manhole. No separate measurement or additional payment shall be admissible for cleaning, jetting, flushing or de-silting of the connected sewer line. | |||||||||||
| 5.00 | Material and labour for cleaning and removal of blockages in sewage lines of any diameter, length and depth from gully trap (GT)/grating to the first manhole, including cleaning of the gully trap and first manhole up to the cleaning eye of the down-take pipe, by using mechanical equipment, rodding devices, choke removers, pressure jetting techniques or any other approved method. The item shall include locating and clearing the blockage, flushing the entire line with water to ensure free flow, cleaning and removal of silt, sludge and other obstructions, and reinstatement of oval access door covers, GT covers and manhole covers in their original positions after completion of the work. The work shall be carried out to the entire satisfaction of the Engineer-in-Charge and shall be complete in all respects as specified and directed.
Note:
(i) The unit of measurement shall be Each Job. The rate quoted shall be deemed to include complete cleaning of the gully trap (GT)/grating, first manhole, cleaning eye of the down-take pipe and the connected sewer line between them, including removal of all blockages, flushing and restoration of free flow. No separate measurement or additional payment shall be admissible for cleaning of the GT/grating, first manhole, cleaning eye, connected sewer line, flushing operations or any other incidental work required for satisfactory completion of the job. | 2,400 | Each Job | 90 ₹2,16,000 | 120 ₹2,88,000 | 80 ₹1,92,000 Lowest | 300 ₹7,20,000 | 125 ₹3,00,000 | 100 ₹2,40,000 | 120 ₹2,88,000 | 220 ₹5,28,000 |
| 6.00 | Material and labour for opening the existing access cover and removing/extracting liquid, grease, oil, fat deposits, kitchen waste, sludge, silt and other obstructions from grease trap (German Technology) of any size, capacity and shape, whether in foul condition or otherwise as per direction, by using a mechanically operated truck/tractor-mounted sewage suction machine/pump, hydro-jet sewer cleaning machine, sludge tanker fitted with sewage/sludge collection tank, and all other necessary machinery, accessories and equipment. The item shall include complete dewatering, suction, cleaning, desludging and flushing of the grease trap, removal of accumulated grease deposits from all chambers and internal surfaces, collection of all extracted liquid and waste material, transportation in leak-proof closed containers/tankers and disposal thereof outside MD land. The work shall also include refilling the grease trap with fresh water up to the required operating level after completion of cleaning operations, reinstatement of the access cover in its original position, and ensuring proper functioning of the grease trap system including cleaning and removal of shrubs, bushes, grass, weeds and other vegetation found within a distance of 2.00 metres all around the external perimeter of the grease trap, completed in all respects as specified and directed by the Engineer-in-Charge. | 50 | Each Job | 90 ₹4,500 Lowest | 100 ₹5,000 | 635 ₹31,750 | 100 ₹5,000 | 650 ₹32,500 | 700 ₹35,000 | 630 ₹31,500 | 200 ₹10,000 |
| 7.00 | Material and labour for opening existing access covers and removing/extracting all liquid, dewatering, sludge, silt, solid waste, scum, sewage deposits and other obstructions from septic tanks or sewage wells or manhole above 4.5m depth of any type (rectangular, circular or otherwise), of any size, depth and capacity, whether in foul condition or otherwise including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject septic tanks / sewage wells / manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted sewage suction machine/ pump, hydro-jet sewer cleaning machine, sludge tanker fitted with sewage/sludge collection tank, and all other necessary accessories and equipment. The item shall include complete dewatering, suction, cleaning and desludging, breaking and loosening of compacted sludge wherever required, collection of all extracted liquid, sludge and waste material, transportation in leak-proof closed containers/tankers and disposal thereof outside MD land premises, and reinstatement of the access cover in its original position after completion of the work, including cleaning off shrubs/bushes, vegetarian found 2 m all-around from external edge of septic tank or sewage well, complete in all respects as specified and directed by the Engineer-in-Charge.
Note : (i) The unit of measurement shall be per thousand Litre (1000 Ltr) of sewage/sludge/waste actually removed and transported, measured on the basis of the certified volumetric capacity of the closed collection tank/container/tanker utilized for the work. | 2,500 | Per 1000 Ltr | 522 ₹13,05,000 | 300 ₹7,50,000 | 237 ₹5,92,500 | 200 ₹5,00,000 Lowest | 315 ₹7,87,500 | 200 ₹5,00,000 Lowest | 320 ₹8,00,000 | 200 ₹5,00,000 Lowest |
| 8.00Note for above srl item 1 to 3 and for 5 to 7 of BOQ : (i) The quoted rate shall be deemed to include the cost of all labour, tools and plants, machinery, fuel, transportation, rods, bamboos, sewage suction pumps, hydro-jetting equipment, tankers, closed containers, gum boots, shovels, hand gloves, personal protective equipment (PPE), safety measures, statutory requirements, disposal charges and all other incidental expenses necessary for carrying out the work and for its satisfactory completion in accordance with the specifications and directions of the Engineer-in-Charge. (ii) No extra payment shall be admissible for repeated filling and emptying of collection tanks, multiple trips for disposal, difficult site conditions, foul conditions, dewatering operations, breaking of compacted sludge or any other operation incidental to the completion of the work. (iii) For the purpose of measurement and payment under BOQ Serial Item No. 7, mixing of any liquid, sludge, silt, grease, sewage or other waste material obtained from any other source, including works executed under BOQ Serial Item Nos. 1, 2, 3, 5 and 6, shall not be permitted. Only the sludge/waste actually extracted from the septic tank(s) or sewage well(s) covered under BOQ Serial Item No. 7 shall be considered for measurement and payment. Any quantity found to have been mixed, supplemented or combined with material obtained from other sources shall not be measured for payment and shall be liable to rejection by the Engineer-in-Charge. The decision of the Engineer-in-Charge in this regard shall be final and binding. | |||||||||||
| 9.00 | Demolition of brickwork or stone / boulder masonry, built in cement mortar or cement lime mortar in manholes, septic tank, soakage wells etc or any description including removing rubbish from the site complete all as specified and as directed. | 27 | Cum | 594 ₹16,038 | 500 ₹13,500 | 245 ₹6,615 | 500 ₹13,500 | 200 ₹5,400 Lowest | 200 ₹5,400 Lowest | 280 ₹7,560 | 1,500 ₹40,500 |
| 10.00 | Material and labour for brick work with sub class ‘B’ old size burnt clay bricks, straight or curved on plan exc. 6 metre mean radius built in cement mortar (1:6) in foul conditions to making good manhole/septic tank etc, complete all as specified and as directed. | 27 | Cum | 5,850 ₹1,57,950 | 5,000 ₹1,35,000 | 5,500 ₹1,48,500 | 5,000 ₹1,35,000 | 4,800 ₹1,29,600 | 4,700 ₹1,26,900 Lowest | 6,325 ₹1,70,775 | 8,000 ₹2,16,000 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
15 Jul 2026, 6:00 pmClosed
GE (AF) BHISIANA
GE (AF) BHISIANA PIN - 151201
REPAIR MAINTENENCE AND CLEANING OF SEWERAGE SYSTEM IN DOMESTIC AREA (ZONE-I) AND NANDANI COMPLEX AT AF STN BHISIANA
2026_MES_774302_1
GE/BHI/TOKEN-08/2026-27
Open Tender
Civil Works
Item Rate
335 days
GE (AF) BHISIANA
As per NIT
7 documents required · 7 mandatory
₹500
GE (AF) BHISIANA
₹50,000
Yes
GE (AF) BHISIANA
11 Aug 2026
23 Jun 2026
17 Jul 2026
23 Jun 2026
15 Jul 2026
8 Jul 2026
23 Jun 2026 - 6 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for opening the existing manhole cover and removing/extracting liquid, sludge, silt, solid waste and other obstructions from manhole chambers (in foul condition or as directed) of any shape and size, having depth not exceeding 1.50 m, including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted hydro-jet sewer cleaning machine equipped with sewage/sludge collection tank, wash-down system, suction derrick arm, hydraulically operated spring-loaded rotary sliding vane compressor, V-hose, end-section nozzle, strainer and all other necessary accessories. The item shall include jetting, suction, cleaning and flushing of the manhole chamber and connected sewer line, temporary stopping/diversion of sewage flow by means of sand bags, gunny bags or other approved methods wherever required during cleaning operations, removal of such temporary obstructions after completion of cleaning to restore normal sewage flow, collection, transportation and disposal of extracted sludge/waste in closed containers outside MD land premises, and reinstatement of the manhole cover in its original position after completion of the work, complete in all respects as specified and directed by the Engineer-in-Charge. | 660 | Each Job | - | - |
| 2 | Material and labour for opening the existing manhole cover and removing/extracting liquid, sludge, silt, solid waste and other obstructions from manhole chambers (in foul condition or as directed) of any shape and size, having depth exceeding 1.50 m but not exceeding 3 m, including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted hydro-jet sewer cleaning machine equipped with sewage/sludge collection tank, wash-down system, suction derrick arm, hydraulically operated spring-loaded rotary sliding vane compressor, V-hose, end-section nozzle, strainer and all other necessary accessories. The item shall include jetting, suction, cleaning and flushing of the manhole chamber and connected sewer line, temporary stopping/diversion of sewage flow by means of sand bags, gunny bags or other approved methods wherever required during cleaning operations, removal of such temporary obstructions after completion of cleaning to restore normal sewage flow, collection, transportation and disposal of extracted sludge/waste in closed containers outside MD land premises, and reinstatement of the manhole cover in its original position after completion of the work, complete in all respects as specified and directed by the Engineer-in-Charge. | 250 | Each Job | - | - |
| 3 | Material and labour for opening the existing manhole cover and removing/extracting liquid, sludge, silt, solid waste and other obstructions from manhole chambers (in foul condition or as directed) of any shape and size, having depth exceeding 3 m but not exceeding 4.5 m, including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted hydro-jet sewer cleaning machine equipped with sewage/sludge collection tank, wash-down system, suction derrick arm, hydraulically operated spring-loaded rotary sliding vane compressor, V-hose, end-section nozzle, strainer and all other necessary accessories. The item shall include jetting, suction, cleaning and flushing of the manhole chamber and connected sewer line, temporary stopping/diversion of sewage flow by means of sand bags, gunny bags or other approved methods wherever required during cleaning operations, removal of such temporary obstructions after completion of cleaning to restore normal sewage flow, collection, transportation and disposal of extracted sludge/waste in closed containers outside MD land premises, and reinstatement of the manhole cover in its original position after completion of the work, complete in all respects as specified and directed by the Engineer-in-Charge. | 15 | Each Job | - | - |
| 5 | Material and labour for cleaning and removal of blockages in sewage lines of any diameter, length and depth from gully trap (GT)/grating to the first manhole, including cleaning of the gully trap and first manhole up to the cleaning eye of the down-take pipe, by using mechanical equipment, rodding devices, choke removers, pressure jetting techniques or any other approved method. The item shall include locating and clearing the blockage, flushing the entire line with water to ensure free flow, cleaning and removal of silt, sludge and other obstructions, and reinstatement of oval access door covers, GT covers and manhole covers in their original positions after completion of the work. The work shall be carried out to the entire satisfaction of the Engineer-in-Charge and shall be complete in all respects as specified and directed.
Note:
(i) The unit of measurement shall be Each Job. The rate quoted shall be deemed to include complete cleaning of the gully trap (GT)/grating, first manhole, cleaning eye of the down-take pipe and the connected sewer line between them, including removal of all blockages, flushing and restoration of free flow. No separate measurement or additional payment shall be admissible for cleaning of the GT/grating, first manhole, cleaning eye, connected sewer line, flushing operations or any other incidental work required for satisfactory completion of the job. | 2,400 | Each Job | - | - |
| 6 | Material and labour for opening the existing access cover and removing/extracting liquid, grease, oil, fat deposits, kitchen waste, sludge, silt and other obstructions from grease trap (German Technology) of any size, capacity and shape, whether in foul condition or otherwise as per direction, by using a mechanically operated truck/tractor-mounted sewage suction machine/pump, hydro-jet sewer cleaning machine, sludge tanker fitted with sewage/sludge collection tank, and all other necessary machinery, accessories and equipment. The item shall include complete dewatering, suction, cleaning, desludging and flushing of the grease trap, removal of accumulated grease deposits from all chambers and internal surfaces, collection of all extracted liquid and waste material, transportation in leak-proof closed containers/tankers and disposal thereof outside MD land. The work shall also include refilling the grease trap with fresh water up to the required operating level after completion of cleaning operations, reinstatement of the access cover in its original position, and ensuring proper functioning of the grease trap system including cleaning and removal of shrubs, bushes, grass, weeds and other vegetation found within a distance of 2.00 metres all around the external perimeter of the grease trap, completed in all respects as specified and directed by the Engineer-in-Charge. | 50 | Each Job | - | - |
| 7 | Material and labour for opening existing access covers and removing/extracting all liquid, dewatering, sludge, silt, solid waste, scum, sewage deposits and other obstructions from septic tanks or sewage wells or manhole above 4.5m depth of any type (rectangular, circular or otherwise), of any size, depth and capacity, whether in foul condition or otherwise including cleaning and removal of blockages from the connected sewer line of any diameter up to 300 mm from the preceding manhole up to the subject septic tanks / sewage wells / manhole, irrespective of length, by using a mechanically operated truck/tractor-mounted sewage suction machine/ pump, hydro-jet sewer cleaning machine, sludge tanker fitted with sewage/sludge collection tank, and all other necessary accessories and equipment. The item shall include complete dewatering, suction, cleaning and desludging, breaking and loosening of compacted sludge wherever required, collection of all extracted liquid, sludge and waste material, transportation in leak-proof closed containers/tankers and disposal thereof outside MD land premises, and reinstatement of the access cover in its original position after completion of the work, including cleaning off shrubs/bushes, vegetarian found 2 m all-around from external edge of septic tank or sewage well, complete in all respects as specified and directed by the Engineer-in-Charge.
Note : (i) The unit of measurement shall be per thousand Litre (1000 Ltr) of sewage/sludge/waste actually removed and transported, measured on the basis of the certified volumetric capacity of the closed collection tank/container/tanker utilized for the work. | 2,500 | Per 1000 Ltr | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_867025.xls
BOQ • 0.28 MB
TenderDocToken08of2627.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .