| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 CrAccepted-AOC 142 | ₹15.2 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | Not Admitted-Finance CHANDAULI | UTTAR PRADESH | 221009 | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical 0 272 273 1 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹39.7 L
Closing Date
14 Nov 2024, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
RESTORATION OF DAMAGED LINING OF MAIN WESTERN GANDAK CANAL FROM KM. 37.680 TO KM 39.800 IN DISTRICT KUSHINAGAR
2024_UPIDC_970483_1
08/SE/2024-25
Open Tender
Civil Works
605 days
KHADDA, KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹39.7 L
Yes
6 Dec 2024
1 Nov 2024
14 Nov 2024
1 Nov 2024
14 Nov 2024
1 Nov 2024
Amount
Dismantling of existing Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete in 1:4:8 in base of toe wall with Coarse Sand having F.M. Not less than 2.5, old dismantled brick ballast of nominal size of 20 mm to 40 mm, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete M15 grade in Toe Wall, Sleepers and Top/Cut-off Wall with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete 125 mm thick M20 Grade in Lining with Coarse Sand having F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing.
Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Supplying and laying Stone Grit below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Providing & Laying LDPE Sheet on slope below lining including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Centering and shuttering for CC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work in filling for making bank with dressing & manual compaction including all lead and lift, carriage labour T&P etc complete in all respect.
Brick on edge soling with old dismantled lining brick/tile including preparation of sub-grade to prescribed camber, filling joint with Local sand/earth including cost of material, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge and as per I.D. specification.
Supplying and fixing Pressure Relief Valve including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specification.
Supplying and laying of Water stopper for water resistance at transverse sleepers including cost of all materials, labour and T&P etc proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Providing and fixing sealing compound in between panel joints including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by engineer -in-charge as per drawing and I.D. Specification
Supplying and laying 25 mm dia CPVC Pipe in Sleepers including material, labour,T&P etc. complete work directed by Engineer-in-charge.