Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC | ₹8.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹9.3 L+₹77,950 (9.19%)Rejected-AOC 4 BY 8 BLOCK H NEAR VIJAY CHOWK EAST DELHI DELHI 110051 | EAST DELHI | DELHI | 110051 | ₹9.3 L+₹77,950 (9.19%) | 2 | Rejected-AOC L2 |
| 3 | 3₹15.8 L+₹7.3 L (86.0%)Rejected-AOC NOT FOUND | ₹15.8 L+₹7.3 L (86.0%) | 3 | Rejected-AOC L3 |
| 4 | 4₹17.6 L+₹9.1 L (107.6%)Rejected-AOC | ₹17.6 L+₹9.1 L (107.6%) | 4 | Rejected-AOC L4 |
| 5 | 5₹18.5 L+₹10.1 L (118.7%)Rejected-AOC | ₹18.5 L+₹10.1 L (118.7%) | 5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
28 May 2022, 6:00 pmClosed
GE (AF) SIRSA
GE (AF) SIRSA
REPAIR/MAINTENANCE OF RUNWAY PTT SHOULDERS AREA WITH GRASS CUTTING SHOULDER LEVELLING SGA PLOUGHING AT AF STN SIRSA
2022_MES_522397_1
GE/SRA/T-05 OF 2022-2023
Open Tender
Miscellaneous Works
Item Rate
273 days
GE (AF) Sirsa
As per Tender and NIT
3 documents required · 3 mandatory
₹500
GE (AF) SIRSA
₹50,000
Yes
5 Jul 2022
7 May 2022
31 May 2022
7 May 2022
28 May 2022
21 May 2022
7 May 2022 - 17 May 2022
Amount
Cutting of Grass Shurbs, Weeds, Bushes, Vegetations, etc. with the help of Bush Cutting Machine including small trees girth up to 30cm and stacking into Heaps and Removal of Outside the AIR FORCE PREMISES along the Sides of Runway, PTT , Links, etc. carefully all as required, complete all as directed by Engineer in Charge. NOTE: (a) The height of grass shrubs, weeds, bushes vegetation etc should not exceed 200mm after cutting and it shall measured in Pocket wise which includes cutting of edges in drain/PTT/ any area other than grass surfaces in Pocket and removal of stacked heaps.(b) Measurement for payment shall made be after execution of above mentioned requirement in pocket wise.(c) Pocket/Task area shall be decided and directed by Engineer in Charge. (c)Quoted rate are included for grass cutting anytime during of the period of completion.(d)Date of grass cutting areawise to be shown in Measurement Book.
Cutting of Grass Shurbs, Weeds, Bushes, Vegetations, etc. with the help of Jungle Jim Tractor (Except area as mentioned in Item No 01 above) including small trees girth up to 30cm and stacking into Heaps and Removal of Outside the AIR FORCE PREMISES along the Sides of Runway, PTT , Links, etc. carefully all as required, complete all as specified and as directed. NOTE: (a) The height of grass shrubs, weeds, bushes vegetation etc should not exceed 200mm after cutting and it shall measured in Pocket wise which includes cutting of edges in drain/PTT/ any area other than grass surfaces in Pocket and removal of stacked heaps. (b) Measurement for payment shall made be after execution of above mentioned requirement in pocket wise. (c) Pocket/Task area shall be decided and directed by Engineer in Charge. (h)Date of grass cutting areawise to be shown in Measurement Book.
Scraping of grass shurbs, weeds, bushes, vegetation etc manually at ground level including removal of small irregularities in natural ground, stacking of spoil into heaps and removal of spoil exc 250 mtrs and not exc 500 mtrs and depositing where directed by the Engineer-in-Charge. Note : Measurement for scrapping of grass shall be measured only one time upto period of completion, required scraping of grass during the period of completion. No payment shall be made and separated which is already included in quoted rate.
Ploughing of SGA not less than 30 cm in depth using plant & its connecting tools required for ploughing complete all as directed by Engineer in Charge.
M&L for Forming embankment for lowering portion on earth, spreading in layers n.exc 30 cms thick watering, ramming rolling with 5 to 10 tonne power roller and finishing to required level camber and gradient, shape etc n.exc 1.50 mtr high from base complete and all as per directed by Engineer-in-Charge. Note :-The earth required embankment shall be brought from outside the defence land of approved quality and source to be approved by GE before incorporation in the work and quoted rate deemed to be included as under :- (i) Earth work i.e excavation removing the soil loading and unloading and temporary profiles etc). (ii) Density required upto the statisfaction level of GE/Engineer-in-Charge for forming embankment.
AGGARWAL CONSTRUCTION CO.
shiv shanker enterprises
VIVEK CONSTRUCTION CO
KARAM CHAND KRISHAN LAL
BHATIA ENTERPRISES
NAIRA CONSTRUCTIONS AND MANAGEMENT SERVICES
M/s MANN CONSTRUCTIONS
M/S GODARA CONSTRUCTION CO.
STAR CONSTRUCTIONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .