Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,419
Closing Date
17 Feb 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O L ROAD FROM MAIN ROAD TO HO MOHD AMIN AND OTHERS AT DARDPORA CHITTERGUL BLOCK CHETERGULL
2026_RDPR_302842_3
ENIT218of2025-26
Open Tender
Civil Works
Percentage
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹4,419
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | - | Cum | - | - |
| 0.0 | Removal of Boulders existing on Road site and shifting to out side of Road site by using Mechanical Equipment JCB | - | Cum | - | - |
| 0.0 | Supply and Placing of Stone Soling hand packed tightly in bed carriages by MT 20 KM | 1 | Cum | - | - |
| 0.0 | P/L in position C.C of specified grade walls,abuts,return walls excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | - | Cum | - | - |
| 0.0 | P/L of Plums | - | Cum | - | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job Abuts | - | Sqm | - | - |
| 0.0 | P/L Of GSB/Nallah Muck For Road | 1 | Cum | - | - |
| 0.0 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm | - | Cum | - | - |
| 0.0 | Laying, spreading and compacting stone aggregate of specified sizes to
WBM specifications in uniform thickness, hand picking, rolling with 3
wheeled road / vibratory roller 8-10 tonne capacity in stages to proper
grade and camber, applying and brooming requisite type of screening
/binding material to fill up interstices of coarse aggregate, watering and
compacting to the required density. | - | Cum | 1 | - |
| 0.0 | Supplying and stacking at site Stone screening of size 11.2 mm nominal size (Type B) | 1 | Cum | - | - |
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_982926.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .