| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | -0.36% | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 L+₹4,534.61 (1.36%)Admitted-Finance | +1.00% | ₹3.4 L+₹4,534.61 (1.36%) | L2 | Admitted-Finance |
| 3 | L2₹3.4 L+₹4,534.61 (1.36%)Admitted-Finance | +1.00% | ₹3.4 L+₹4,534.61 (1.36%) | L2 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,700
Closing Date
19 May 2026, 2:00 pmClosed
EE
S/O
Laying of 450 mm dia Sewar line 9 Meter with construction of 1 M.H. 15 feet Deep Reparing of 1 M.H. From H.No. 51 C Block Tatya Tope Nagar Ward No.09
2026_DOLBU_1147265_1
JalKal / 427 / EE Zone 5 /
Open Tender
Miscellaneous Works
Percentage
30 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Jal Kal Vibhag
₹6,700
22 Aug 2026
11 May 2026
19 May 2026
11 May 2026
19 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of C.C. Road & its stracking old Material including Supply of lab, T&P etc all complete.(As Vibgagly rate Sacntioned in 2025-26 for Sewar Line 300 mm dia For M.H. | 22.5 | sqm | 210 | ₹4,725 |
| 2 | Dismentling of C.C. Road & its stracking old Material including Supply of lab, T&P etc all complete.(As Vibgagly rate Sacntioned in 2025-26 for Sewar Line 300 mm dia For M.H. | 22.5 | sqm | 404.6 | ₹9,103.5 |
| 3 | Excavation of Foundation in Ordinary Soil including Lift Upto 1.5 Mtr. Wirh supply of labour 'T&P all complete.(As per Unit rate 2025-26) for Sewar Line 300 mm dia Upto 1.50 mtr. For M.H. | 33.75 | CUM | 291.89 | ₹9,851.29 |
| 4 | for Sewar Line 450 mm dia 1.5 to 03 | 33.75 | hrs | 366.1 | ₹12,355.88 |
| 5 | for Sewar Line 450 mm dia 3.0 to 4.5 | 33.75 | mtr | 458.83 | ₹15,485.51 |
| 6 | Providing Close timbering in trenches including supply of labour 'T&P all complete.(As per Unit rate 2025-26) | 45 | Rmt | 1,373.92 | ₹61,826.4 |
| 7 | Concrete work with 20 Guage Bricks Blast, Sand & Cement in Foundatin under floor s in Pro. Of 10:5:1 including Supply lab, mat, T&P all complete (As per Unit rate 2025-26) for Sewar Line 450 mm dia 0.0 to 1.5 | 22.5 | CUM | 1,741.29 | ₹39,179.03 |
| 8 | Making Barricating Arrangment with sal, Ballies, lab, t7p etc all comp(As per Unit rate 2025-26) | 1.8 | job | 4,747.35 | ₹8,545.23 |
| 9 | 1st Class Brick Work With 1:4 Cement sand motor including Supply of lab, Mat, T&P etc all comp..(As per Unit rate 2025-26) | 34 | job | 200 | ₹6,800 |
| 10 | 12 mm thick plaster with 1:4 cement sand mortor including supply of lab. ,Mat, etc all comp.(As per Unit rate 2025-26) | 11.02 | nos | 7,200 | ₹79,344 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
1.pdf
Tender Documents • 1.34 MB
BOQ_2146204.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .