| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | ₹17.8 L | L1 | Accepted-AOC Bid accepted L1 bidder |
| 2 | L2₹18.2 LRejected-AOC | ₹18.2 L | L2 | Rejected-AOC Bid rejected L2 bidder |
| Sl No | Description | Qty | Unit | kavinithi L1 | SABAREE CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of 30000 Litres Capacity OHT Tank - 12.00 M Staging @ Kamatchipuram H/O Keeranur | 1 | nos | - | - |
| 2.00 | Earth work excavation below G.L. and depositing on bank | 1 | nos | - | - |
| 3.00 | First depth of 0 to 2 m | 1 | nos | - | - |
| 4.00 | Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B | 47.07 | cum | 263 ₹12,379.41 | 280 ₹13,179.60 |
| 5.00 | Sand filling for foundation with clear M sand. | 2.3 | cum | 1,678 ₹3,859.40 | 1,700 ₹3,910 |
| 6.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m & upto 4.50 m depth BGL. | 3.46 | cum | 5,280 ₹18,268.80 | 5,300 ₹18,338 |
| 7.00 | R.Cement concrete 1:11/2:3 mix (M30) using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 1 | nos | - | - |
| 8.00 | A.Below 1.5m & upto 4.50 m BGL | 5.33 | cum | 8,469.5 ₹45,142.43 | 8,480 ₹45,198.40 |
| 9.00 | B. 0m to 1.50m below GL | 1.75 | cum | 8,831 ₹15,454.25 | 8,850 ₹15,487.50 |
| 10.00 | C. 0m to 4.50m above GL | 2.83 | cum | 8,972 ₹25,390.76 | 9,000 ₹25,470 |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
4 Dec 2025, 3:00 pmClosed
Block development office (VP), Kangayam
Block development office (VP), Kangayam
Construction of 30000 Litres Capacity OHT Tank - 12.00 M Staging Kamatchipuram H/O Keeranur
2025_RDTN_624217_1
ROC NO.2836/2024/A2 dt 17.11.2025
Open Tender
Civil Works - Water Works
Block development office (VP), Kangayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
Yes
Block development office (VP), Kangayam
10 Feb 2026
18 Nov 2025
4 Dec 2025
18 Nov 2025
4 Dec 2025
18 Nov 2025
19 Nov 2025
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Sand filling for foundation with clear M sand.
PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m & upto 4.50 m depth BGL.
A.Below 1.5m & upto 4.50 m BGL
B. 0m to 1.50m below GL
C. 0m to 4.50m above GL
D.4.50 m to 7.32 m above GL
E. 7.32 m to 10.98 m above GL
F. 10.98 m to 14.64 m above GL
G. 14.64 m to 18.30 m above GL
A.Below GL
B.From GL to 3.30m
C.From 5.30m to 6.30m above GL
D.From 8.30m to 9.30m above GL
E.From 11.30m to 12.30m
A.Square Column Below GL and upto 3.30m above GL
3.31m to 4.30m ht
4.31m to 5.30m ht
5.31m to 6.30m ht
6.31m to 7.30m ht
7.31m to 8.30m ht
8.31m to 9.30m ht
9.31m to 10.30m ht
10.31m to 11.30m ht
11.31m to 12.30m ht
B.Curved Surface - upto 3.30m ht.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement .
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat ,inculding through scrapping, clean removal of dirt etc. complete and inculding necessary plasterof paris , putty whereever required .
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed
Supply and delivery of 63mm PVC pipe 4kg including all charges
Laying Charges for labour 63mm PVC Pipes including all charges etc
Refilling Chagres for Earth Work for 63mm PVC Pipes
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_746564.xls
BOQ • 0.28 MB
TB.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid