| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.2 LAccepted-AOC | ₹15.2 L | 1 | Accepted-AOC Lowest Tenderer |
| 2 | 2₹15.3 L+₹6,353 (0.42%)Rejected-AOC | ₹15.3 L+₹6,353 (0.42%) | 2 | Rejected-AOC . |
Tender Value
₹15.4 L
EMD Value
₹15,500
Closing Date
10 Feb 2021, 3:00 pmClosed
Project Director
DRDA, Theni
1. Strengthening of road from Ayanadevan patti to Vegavathi Asiraman km 0/0-0/450 2. Strengthening of road from T.Perumalpatti vilaku to T.Perumalpatti km 0/0-0/2
2021_RDTN_193688_1
2990/2019/D5 Dated 02.02.2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹15,500
21 Jun 2021
4 Feb 2021
10 Feb 2021
4 Feb 2021
10 Feb 2021
4 Feb 2021
Amount
Strengthening the road from Ayyanathevanpatty to Vegavathi Ashiramam Km 0/0-450(R53)
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per MORT & H 301-305
Providing and laying U / S Gravel solling and compacted thickness including cost and conveyance of all gravel from appd . Sources to work site including labour for spreading , watering and compaction by power roller to achive to required proctore dencity and 100 % compaction and optimum moisture contant and higher charges for power roller and water spreinglers and other incidental charges and traffic Barricading and providing danger light etc complete.,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges.No.509&513 of MOST.
Provision for HM stone
Provision for name board
Strengthening of BT road from Pullimancombai road to T.Perumalpatty road Km0/0-2/0 (R216)
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per MORT & H 301-305
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying U / S Gravel solling and compacted thickness including cost and conveyance of all gravel from appd . Sources to work site including labour for spreading , watering and compaction by power roller to achive to required proctore dencity and 100 % compaction and optimum moisture contant and higher charges for power roller and water spreinglers and other incidental charges and traffic Barricading and providing danger light etc complete.,
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges.No.509&513 of MOST.
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
AMR CCONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .