| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance 1 21 B8 KHADAR MEERAN NAGAR THERMAL NAGAR TUTICORIN | ₹8.5 L | L1 | Accepted-Finance BOQ Accepted |
| 2 | L2₹14.8 LAccepted-Finance | ₹14.8 L | L2 | Accepted-Finance BOQ Accepted |
| 3 | Rejected-Technical | - | - | Rejected-Technical BQR No.1 not accepted |
| Sl No | Description | Qty | Unit | LAKSHMI ERECTORS L2 | A.K.B RAJA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for Inspection and clearance given to Coal Handling control room operator to start the Primary crusher, Reject conveyor, belt feeder, shuttle feeders and Dust extraction system and allied equipments one by one whenever required, after starting the system, inspection of all the running equipments and condition of system informed to CHS -5 operator to start coal feeding, checking the out put size of segregated of lump coal, stone and foreign material above 180 mm size delivered in reject yard through the reject conveyor 2A, 2B & 2C by visual inspection, If any breakdown occur in rotary breaker of primary crusher, to change the discharge of coal to conveyor 48A1 / B1 through the reversible operation of belt feeder via bypass discharge chute as per the instruction of site incharge and coal handling control room operator, checking the bearings housing of drive & driven pulley, feeder pulley bearings temperature of all the running equipments to be recorded in shift log book, checking the oil level in all gearboxes, checking the all drive fluid coupling, gear box and connecting multidisc assembly bolts and inspect any oil spray found in the system, if any abnormalities found in the system, inform to the maintenance engineer of PCH-II, during coal receiving / feeding any abnormality found in system immediately stop the crusher and alternate stand by system put in to service position, checking of ‘V’ belts in DE system, belt feeder/ shuttle feeder belt adjusting and the belt tension if necessary, supervision of all mechanical maintenance works in Primary crusher house-II, arranging to attend the defect then and there in Primary crusher running equipments in coordination with maintenance incharge of PCH-II, inform the condition of all the running equipments position informed to the field maintenance engineer incharge, inspection and Monitoring all the running equipments bearing temperature by hand touch, the vibration of running equipments by hand touch, the oil level in gear box, fluid coupling, cleaning the air breather in all gear box, all bolts and nuts of all running equipments bed frame structure, all bearing housing assembly and tightness checking, any abnormality of running equipments, all the belt scrapper, return belt scrappers, tracking the conveyor belt and also checking the belt joints, adjusting the skirt board rubber to minimize the spillage coal, positioning the Shuttle feeder, when every changing of crusher, inspection of all coal transfer chutes and deflector plate, apply of Grease/ Oil in the chain / chain sprocket and inspection and Monitoring the free rotation of idler etc... | 480 | Operation | 14,78,880 ₹17,45,078.4 | 8,47,200 ₹9,99,696 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,700
Closing Date
17 Aug 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-II-Inspection, Checking and monitoring of the mechanical equipments with allied works in PCH-II such as 2 Nos Primary Crushers-2A 2B, 4 Nos. Belt Feeders -2A,2B,3A 3B, 2 Nos. Shuttle Feeder-1A 1B, 3 Nos. Reject conveyor 2A,2B 2C
2026_EB_690158_1
CE/TTPS/SE/MI/84/2026-2027
Open Tender
Miscellaneous Works
Works
228 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,700
Yes
20 Aug 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Inspection and clearance given to Coal Handling control room operator to start the Primary crusher, Reject conveyor, belt feeder, shuttle feeders and Dust extraction system and allied equipments one by one whenever required, after starting the system, inspection of all the running equipments and condition of system informed to CHS -5 operator to start coal feeding, checking the out put size of segregated of lump coal, stone and foreign material above 180 mm size delivered in reject yard through the reject conveyor 2A, 2B & 2C by visual inspection, If any breakdown occur in rotary breaker of primary crusher, to change the discharge of coal to conveyor 48A1 / B1 through the reversible operation of belt feeder via bypass discharge chute as per the instruction of site incharge and coal handling control room operator, checking the bearings housing of drive & driven pulley, feeder pulley bearings temperature of all the running equipments to be recorded in shift log book, checking the oil level in all gearboxes, checking the all drive fluid coupling, gear box and connecting multidisc assembly bolts and inspect any oil spray found in the system, if any abnormalities found in the system, inform to the maintenance engineer of PCH-II, during coal receiving / feeding any abnormality found in system immediately stop the crusher and alternate stand by system put in to service position, checking of ‘V’ belts in DE system, belt feeder/ shuttle feeder belt adjusting and the belt tension if necessary, supervision of all mechanical maintenance works in Primary crusher house-II, arranging to attend the defect then and there in Primary crusher running equipments in coordination with maintenance incharge of PCH-II, inform the condition of all the running equipments position informed to the field maintenance engineer incharge, inspection and Monitoring all the running equipments bearing temperature by hand touch, the vibration of running equipments by hand touch, the oil level in gear box, fluid coupling, cleaning the air breather in all gear box, all bolts and nuts of all running equipments bed frame structure, all bearing housing assembly and tightness checking, any abnormality of running equipments, all the belt scrapper, return belt scrappers, tracking the conveyor belt and also checking the belt joints, adjusting the skirt board rubber to minimize the spillage coal, positioning the Shuttle feeder, when every changing of crusher, inspection of all coal transfer chutes and deflector plate, apply of Grease/ Oil in the chain / chain sprocket and inspection and Monitoring the free rotation of idler etc... | 480 | Operation | 55 | ₹26,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_829630.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].