Loading…
Loading…
Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
3 Jul 2026, 5:00 pmClosed
Ex Engineer
Flood Restoration and Reconstruction of Indoor Hall at Samba and Billawar...2ND TIME
Flood Restoration and Reconstruction of Indoor Hall at Samba and Billawar...2ND TIME
2026_SPORT_313431_1
E NIT NO 14 OF 2026-27 DATED 23.06.2026
Open Tender
Civil Works
Percentage
180 days
SAMBA BILLAWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
EX ENGINEER CDJ
₹4.9 L
EX ENGINEER OFFICE AT SPORTS HOUSE MA STADIUM
31 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and thelike not exceeding 10sqm on plan, depth upto 1.5mtr.including disposal of excavated earth upto 1 mtr fromcutting edge, disposed earth is to be levelled and neatly dressed in All kinds of soil complete job. | 58.5 | cum | 256.85 | ₹15,025.73 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 3,400 | cum | 187.3 | ₹6,36,820 |
| 3 | Slip Clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. | 65 | cum | 154.15 | ₹10,019.75 |
| 4 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead | 1,047 | kg | 4.3 | ₹4,502.1 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering . All works upto plinth level 1:4:8 mix (1 cement: 4 coarse sand:8 graded stone aggregates) 40 mm nominal size (crushed) | - | cum | 5,202.9 | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed | 98.5 | cum | 5,733.6 | ₹5,64,759.6 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level using 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.5 | cum | 7,788.4 | ₹89,566.6 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 690 | kg | 123.2 | ₹85,008 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns complete job. | - | sqm | 286.35 | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Lintel, beams, plinth beams, girders, bressumers and cantilevers | 76.5 | sqm | 577.55 | ₹44,182.58 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.20 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_1014471.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .