Loading…
Loading…
Tender Value
₹7.5 L
EMD Value
₹63,287
Closing Date
1 Sept 2026, 4:00 pm
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD NO 02 SIKARAUL ANTARGAT MO BHIMNAGAR ME DR BHIMRAO MURTI STHAL PAR CHAT AAVAM BOUNDRYWALL NIRMAN KARYA
2026_NNVAR_1177916_7
63_226_27
Open Tender
Civil Works
Percentage
90 days
NAGAR NIGAM VARANASI
AS PER TENDER DETAILS
3 documents required · 3 mandatory
₹750
TENDER COAST AC NO.50100642535388
₹63,287
22 Aug 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1okMZ la0& 02 fldjkSy ds vUrxZr eksgYyk Hkheuxj es Mk0 Hkhejko ewrhZ LFky ij Nr ,oe ckmaMªhoky dk fuekZ.k dk;ZA | |||||
| 1.01 | Excavation in foundation in ordinary soil (loam clay or sand) including lift up to 1.5m and lead up to 30m. And including filing watering and ramming of excavated earth etc all complete as per the direction of engineer in charge. (UP S.O.R-2020 Ref No.: 251 | 84.1 | m3 | 130 | ₹10,933 |
| 1.02 | Earth work in Filling cartage earth 8 km.etc all complete work. | 11 | m3 | 310 | ₹3,410 |
| 1.03 | P.C.C. work in 1:4:8 with cement, F/sand & 40 mm stone ballast with all complete. (Under hume pipe) SOR SI NO.- 281 | 7 | m3 | 4,400 | ₹30,800 |
| 1.04 | Ist class 150 brick work in 1:4 cement & coarse sand of 1:25 finess modulous mortor in foundation & plinth, including supply of all materials, labour and tools & plant etc. required for proper completion of the work | 13.88 | m3 | 5,500 | ₹76,340 |
| 1.05 | 12 mm thick plaster in sub- structure with 1:3 ratio of cement mortor (1 cement,3 C/sand)etc | 31.63 | m2 | 185 | ₹5,851.55 |
| 1.06 | R.C.C Work 1:2:4(1cement,2 c/sand,4 stone gritts 20mm gauge) | 3.89 | m3 | 9,300 | ₹36,177 |
| 1.07 | M.S. or iron in plain work such as rienforced concrete or reinforced B/W etc (S.I. No. 504) | 3.05 | qtl | 6,350 | ₹19,367.5 |
| 1.08 | Ist class 150 brick work for super structure in 1:4 cement & coarse sand of 1:25 finess modulous mortor in 9 foundation & plinth, including supply of all materials, labour and tools & plant etc. required for proper completion of the workete | 18.4 | m3 | 5,820 | ₹1,07,088 |
| 1.09 | R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in foundation and footing, plinth beams, lintel beam, slab beam and column excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24 BWG binding wire and including neccessary centering and shuttering etc. and also including S/o all materials, labour and T&P etc. required for proper completion of the work. Total for column | 7.57 | m3 | 9,600 | ₹72,672 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
63td.pdf
Tender Documents • 7.94 MB
BOQ_2213400.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].