| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.1 LAccepted-AOC SHOP NO 4 NIRMAL VIHAR SECTOR 7 KARNAL HARYANA 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹22.1 L Quoted ₹15.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.7 LRejected-AOC NOT AVAILABLE | ₹17.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹19.1 LRejected-AOC | ₹19.1 L | L3 | Rejected-AOC L3 |
| 4 | L4₹19.6 LRejected-AOC SHOP NO 1 GALI NO 1 OPPO NEW BUS STAND CHANDAN MARKET BHIWANI HARYANA | BHIWANI | BHIWANI | HARYANA | ₹19.6 L | L4 | Rejected-AOC L4 |
| 5 | L5₹22.2 LRejected-AOC C O SH YASHU GUPTA SCF 51 HARMILAP NAGAR BALTANA MOHALLI | ₹22.2 L | L5 | Rejected-AOC L5 |
Tender Value
₹22.1 L
EMD Value
₹44,200
Closing Date
26 Feb 2026, 12:00 pmClosed
Narender Kumar Payal
DIV 2 Panchkula
Construction of brick manhole and providing and laying 9f sewerline from Ashiana Sector 26 near HBC to Sector 26/25 dividing rotary Panchkula Extension complete in all respect as per satisfaction of Engineer-in-charge (A/mtc of PH services in Sector
2026_HBC_503103_1
2026CCB84F69 E165 4098 90BA 0F174ECB5917270HSV
Open Tender
Civil Works
120 days
Panchkula
2 documents required · 2 mandatory
₹1,000
₹44,200
Yes
14 Apr 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
17 Feb 2026 - 19 Feb 2026
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth.
[11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand)
[11.52]Cement rendering on plaster 1 mm thick
[21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge
[21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening
[21.98.3]`Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipes of PE-100 grade and PN- 8 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE `Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment.` 3. 250 mm Outside Dia.
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
[4.31.1]Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1. All kinds of soil
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.30.16.1]Centering and shuttering including strutting, propping etc. and removal of form for 16.1. Edges of slabs and breaks in floors and walls Under 20 cm wide
[6.30.4]Centering and shuttering including strutting, propping etc. and removal of form for 4. Shelves (Cast in situ)
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_581788.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_581788.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid