Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
28 Sept 2026, 12:00 pmDue tomorrow
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
Above/Below/Par
WORKS
13 conditions · 2 needing a document upload
Only M/s Autometers Alliance Ltd., C-63, Sector-57, Noida-201307 i.e. OEM of 180 KVA static converter of their own make is eligible to participate in this tender.
Only M/s Autometers Alliance Ltd., C-63, Sector-57, Noida-201307 i.e. OEM of 180 KVA static converter of their own make is eligible to participate in this tender.
26 conditions · 4 needing a document upload
Please submit your bank details i.e. Name of Bank along with Bank Branch Code, Accounts Number as appearing in the cheque book, IFSC Code and PAN Number, to facilitate payment through ECS/NEFT/RTGS. In lieu of the bank certificate, photocopy/scanned copy of a cancelled cheque may be attached for verification of the above particulars.
Tenderer should submit documents related to registrationdetails, GSTIN along with other details required underCGST/IGST/UTGST/SGST Act, registered address, email id etc.
Sole Proprietorship Partnership Deeds Powerof Attorneys etc should be uploaded as perGCC April 2022 Part-I Clause 14.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For any calculation rounding-off will be done up-to two digit afterdecimal as per provision of IS-2. This will also applicable for ratequoted by tenderer.
Tenderers are requested to kindly carefully go through therelevant instructions/conditions/requirements contained intender documents/general conditions of contract, as the casemay be before submitting the offer. Variousconditions/constructions will be taken as read & agreed if notspecifically indicated to be disagreed/deviated.
It will be responsibility of tenderers downloading the tenderdocuments to check time to time for corrigendum to the tenderif any and submit their offer accordingly. Railway reserves theright to make any additions/alterations to the tender uploadedand issue corrigendum to the same effect. In case the tendererfails to take note of the above corrigendum, the additions andalterations entered/effected in the corrigendum shall be bindingupon the tenderer and no claim what so ever will be entertainedby Railway.
The quantity shown in the schedule is approximate and liable tobe varied depending upon the actual requirement/arising.
If the tenderer / tenderers deliberately give/gives wronginformation in his/their tender or creates/create circumstancesfor the acceptance of his/their tender, the Railway reserves theright to reject such tender at any stage.
No post tender correspondence shall be entertained afterclosing of tender even suo moto post tender letters of thetenderers shall be treated as null/void.
The Standard IR General Conditions of Contract(GCC)April- 2022for works contract with all correction slips upto latest asamended from time to time will be applicable for this contract.Tenderer participating in this tender will be considered wellfamiliar with the clauses available in the IRGCC April- 2022.Incase any clarifications/query the tenderer may read the IRGCCApril-2022 available on website(www.indianrailway.gov.in). Ifany typing error found in some important clauses are beingmentioned above of GCC April 2022 in this Bid the Original asmentioned in IRGCC April2022 will hold good. GCC April 2022and correction slip No. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 & 12 attached.
Until a formal agreement is prepared and executed, acceptanceof this tender document shall constitute a binding contractbetween Railway and tenderer subject to modification as may bemutually agreed and indicated in the letter of acceptance forthis work.
Schedule of rate and quantity as per annexure-IV of TenderDocument.
Omissions and Discrepancies:- The tenderer(s)shall not take anyadvantage of any misinterpretation of the conditions due totyping or any other error. Should a tenderer find discrepancies inor omissions from the specification or any of the Tender Formsor should he be in doubt as to their meaning, he should at oncenotify the authority inviting tenders who may send a writteninstruction to all tenderers. It shall be understood that everyendeavour has been made to avoid any error which canmaterially effect the basis of the tender and the successfultenderer shall take upon himself and provide for the risk of anyerror which may subsequently be recovered and shall make nosubsequent claim on account thereof.
Annual Maintenance Contract (AMC) of M/s AAL make Static Inverters (SIV) provided in electric Locomotives of DLS/NKJ for Three years
NKJ-DLS-AMC-AAL-SIV-T-26~WCR
NKJ-DLS-AMC-AAL-SIV-T-26
Single
Works - General
36 Months
Katni, Madhya Pradesh
₹0
₹4.3 L
4 Sept 2026
4 Sept 2026
14 Sept 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,17,02,872.28 | ||
| — | 828.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (AMC) of M/s AAL make 180 KVA Static Inverters (SIV) provided in electric Locomotives of DLS/NKJ for Three years. (Total 23 Loco for 36 Months = 23*36=828 Loco months) | — | — | — | 1,83,92,264.64 | |
| — | — | — | 33,10,607.64 | ||
| @ | GST | 18% | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BankDetailformat.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
GCC April 2022 Correction Slip no 1
ATTACHMENT
GCC April 2022 Correction Slip no 2
ATTACHMENT
GCC April 2022 Correction Slip no 3
ATTACHMENT
GCC April 2022 Correction Slip no 4
ATTACHMENT
GCC April 2022 Correction Slip no 5
ATTACHMENT
GCC April 2022 Correction Slip no 6
ATTACHMENT
GCC April 2022 Correction Slip no 7
ATTACHMENT
GCC April 2022 Correction Slip no 8
ATTACHMENT
GCC April 2022 Correction Slip no 9
ATTACHMENT
GCC April 2022 Correction Slip no10
ATTACHMENT
GCC April 2022 Correction Slip no11
ATTACHMENT
GCC April 2022 Correction Slip no12
ATTACHMENT
TENDERDOCUMENT.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno1.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno2.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipNo3.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipNo4.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipNo5.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno6.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno7.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno8.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno9.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno10.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno11.pdf
ATTACHMENT
GCC_April-2022_CorrectionSlipno12.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .