| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.7 L+₹82,031 (4.60%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | STAR INFRAA L2 | K KANNAN L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling the existing damaged Reinforced cement concrete including removal of demolish materials and all labour charges and conveyance charges etc.complete.., | 4 | M3 | 4,497.9 ₹17,998.35 | 4,300.1 ₹17,206.85 Lowest |
| 2.01 | Dismantling the existing damaged brick masonry wall under 3m hight including removal of demolish materials and all labour charges and conveyance charges etc.complete.., | 13 | M3 | 241.1 ₹3,133.97 | 230.5 ₹2,996.19 Lowest |
| 3.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 47 | M3 | 220.5 ₹10,362.49 | 210.8 ₹9,906.63 Lowest |
| 4.01 | Supplying and filling in foundation and basement with Quarry Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. | 47 | M3 | 1,993.5 ₹93,685.33 | 1,905.8 ₹89,563.83 Lowest |
| 5.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 10 | M3 | 5,924.8 ₹59,222.88 | 5,664.2 ₹56,617.98 Lowest |
| 6.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement. | 6 | M3 | 7,021 ₹42,108.59 | 6,712.2 ₹40,256.55 Lowest |
| 7.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete complying with standard specification For Super Structure in GF. | 27.32 | M3 | 7,108.4 ₹1,94,170.14 | 6,795.8 ₹1,85,631.29 Lowest |
| 8.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) | 19 | M2 | 1,173.5 ₹22,291.81 | 1,121.9 ₹21,311.61 Lowest |
| 9.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. | 108 | M2 | 1,408.1 ₹1,52,077.62 | 1,346.2 ₹1,45,392.29 Lowest |
| 10.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. | 102 | M2 | 1,173.5 ₹1,19,691.84 | 1,121.9 ₹1,14,428.86 Lowest |
Tender Value
₹17.9 L
EMD Value
₹17,878
Closing Date
8 Oct 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Demolishing the Existing kitchen building and construction of Lab Building at Masathiyar Girls Higher Secondary School in ward no 47 zone 4
2025_MAWS_608508_1
E7 / EST 285 (SFC SIG) /25-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹17,878
1 Dec 2025
26 Sept 2025
8 Oct 2025
26 Sept 2025
8 Oct 2025
26 Sept 2025
Amount
Dismantling the existing damaged Reinforced cement concrete including removal of demolish materials and all labour charges and conveyance charges etc.complete..,
Dismantling the existing damaged brick masonry wall under 3m hight including removal of demolish materials and all labour charges and conveyance charges etc.complete..,
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with Quarry Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement.
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete complying with standard specification For Super Structure in GF.
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2.
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2.
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm
Plastering with CM1:5(one cement and five sand) 12mm thick10m2.
Supply and Delivery Fabrication of MS doors and windows with outer frame and shutter frame in MS angle of size 40mm x 40mm x 6 mm with MS flat 25mm x 25mm x 6mm and MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locking arrangements including two coats of approved enamel paint over coat of red oxide including cost of angles, plates, sheets, fabrication charges, cost of hold fast and transportation charges etc., complete. Class Room Door 1.00m x2.10 m
Supply and Delivery Fabrication of MS doors and windows with outer frame and shutter frame in MS angle of size 40mm x 40mm x 6 mm with MS flat 25mm x 25mm x 6mm and MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locking arrangements including two coats of approved enamel paint over coat of red oxide including cost of angles, plates, sheets, fabrication charges, cost of hold fast and transportation charges etc., complete.
Class Room window 1.20 x 0.90
Wiring with 2x1.50 sq.mm PVC unheated SC Aluminium cable of 1100 V grade in suitable PVC rigid pipes in wall or ceiling with PVC accessories with TW switch box in flush with wall covered by hylum sheet3mm thick and painting with suitable colour of 14 SWG TC wire for light point.
Supplying and fixing of 48” AC ceiling fan with 300mm down rod on the existing clamp with regulator with complete set TWAD-DATA-P- 56" Ceiling Fan High Speed (Without regulator) Higher End Each
Supply and Fixing for 20W 4 Feet LED fitting with LED including labour Charges Etc Complete
White washing two coats with freshly burnt shell lime white in colour in all floors including cost of lime and other materials brushes scaffolding charges etc.complete complying with standard specification and as directed. -100sq.m S.I.333
Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc ,complete as per standard specification. - 10 sq.m
Supply and delivery and fixing of HDPE tank as per IS 12701/1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc.,
Supply and delivery and fixing of Pipes and specials as per IS Specification. 110mm PVC. Pipe
32 mm PVC. Pipe
32 mm GI. Pipe
25 mm PVC. Pipe
110mm PVC Coupler
110mm PVC Elbow
32mm PVC Coupler
32mm PVC Elbow
32mm PVC Tee
32mm x 25mm Reducer
25mm PVC Coupler
25mm PVC Elbow
25mm x 20mm Tee
Waste Not Tap 20mm
Add GST 18%
STAR INFRAA (BID ID -1481195)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .