Tender Value
₹11.3 L
EMD Value
₹11,350
Closing Date
27 Nov 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFIICER KUTHALAM
BLOCK DEVELOPMENT OFIICER KUTHALAM
CONSTRUCTION OF EMAKIRIKIYAI MANDABAM AND MAYANA SHED IN THIRUNALKONDACHERY VAZHUVUR PANCHAYAT KUTHALAM BLOCK MAYILADUTHURAI DISTRICT
2023_RDTN_391570_1
425/2023/A2
Open Tender
Civil Works
Item Rate
120 days
kUTHALAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹11,350
BLOCK DEVELOPMENT OFIICE KUTHALAM
28 Nov 2023
22 Nov 2023
27 Nov 2023
22 Nov 2023
27 Nov 2023
22 Nov 2023
22 Nov 2023 - 24 Nov 2023
22 Nov 2023
Amount
Earth work excavation in classes all clasess of soils and depositing on bank with initial lead and lift soils such as, sand, or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, block cotton soil, red earth, earth mixed width 50% fair sized boulders etc., except hard rock which requires blasting as per SS20B, including all labour for balling out water if necessary and all labour and other incidental charges etc. complete for FOUNDATION.
Filling with river sand into foundation and basement including cost and conveyance of sand to worksite including labour for filling, watering within 200m lead for good water, including tamping if necessary, and all labour and all other incidental charges etc., complete for FOUNDATION / BASEMENT.
Cement Concrete 1: 4 : 8 mix using 40mm ISS Size HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including labour for mixing, laying the concrete the concrete watering within 200m lead for good water, and compacting the concrete including labour and all other incidental charges etc., complete for FOUNDATION / BASEMENT.
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement
Paving the floor with scratch proof ceramic tiles of approved colour and size in CM 1:3, 20mm thick and pointing with white cement using 0.4 Kg/Sqm mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with standard specification etc., complete.
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges etc., complete. For basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges etc., complete. For super structure
Celing Plastering with Cement Mortar 1:3, 10mm thick including cost and conveyance of all materials to worksite, and all labour for watering, curing and all leads for good water including cost of form work, and all labour and all other incidental charges etc. complete.
Plastering in CM 1:5 - 12mm thick including cost and conveyance of all materials and all labour charges etc., complete
Weathering coarse with Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio m3
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Supplying & Erecting shuttering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets etc., complete complying with standard specifications and as directed by the departmental officers. for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). For Shuttering.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets etc., complete complying with standard specifications and as directed by the departmental officers. for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). For Centering.
Painting the plastered wall surfaces with two coats oil bound distemper (inside the building) of approved quality and colour over one coat of wall primer including clearing surface in all floors etc complete with standard specification
painting two coat with emulsion paint over the coat of over the primer coat
Provision for Grial Gate alround
Fixing of Grill and Grill Gate incuding all labour Charges Labour charge for fixing Windows & Ventilators along with frames in position etc., complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
provision for Electrification
Construction of Cremation Shed (Sub Estimate)
Saravanan Contractor
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .