Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance Due To First Lowest |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance Due To Second Lowest |
| 3 | L3₹1.3 CrRejected-Finance | ₹1.3 Cr | L3 | Rejected-Finance Due To Third Lowest |
| 4 | L4₹1.3 CrRejected-Finance | ₹1.3 Cr | L4 | Rejected-Finance Due To Fourth Lowest |
| 5 | L5₹1.4 CrRejected-Finance | ₹1.4 Cr | L5 | Rejected-Finance Due To Fifth Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
20 May 2026, 6:00 pmClosed
CEO ZP PALGHAR
CEO OFFICE ZP PALGHAR
Water Supply Scheme for Sutrakar Government Ashramschool, Taluka - Talasari Dist - Palghar.
2026_PALGH_1302226_1
PZP/RWSD/SGAS/03/2026-27
Open Tender
Civil Works - Water Works
300 days
Sutrakar
Please Refer Tender Documents.
3 documents required · 3 mandatory
₹23,600
₹1.3 L
25 Jun 2026
13 May 2026
21 May 2026
13 May 2026
20 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | R.C.C. Jack Well (6.00m X 10.0m)
Item No.1
Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling, the middle portion with B. C. soil (in gunny bags if requried). Providing impervious / semipervious materials on both side of B.C. soil (in gunny bags if required) including ramming, compacting to the satisfaction of Engineer-in-charge, till the complction of work including dismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge.
Lift 0.00 M to 1.50 m | 82.13 | Cum | 899.8 | ₹73,901 | BI01010001010000000000000515BI0100001115 |
| 2 | Item No.2
Excavation in general in soft material comprising of soft soil, soft murrum, sand, hard murum with boulders in wet or dry condition for Head Works I.e. intake well, connecting pipe Jack well, pump House, supply well etc. for lift'0 to 1.5 M & lead 'of 1.50M including barricading, guarding, depositing oft surplus excavated stuff within a radius of 0.5km as directed by Engineer-in-charge-,etc 'complete excluding refilling.
Lift 0.00 M to 1.50 m | 183.98 | Cum | 561 | ₹1,03,213 | - |
| 3 | Lift 1.50 M to 3.00 m | 155.72 | Cum | 594 | ₹92,498 | - |
| 4 | Lift 3.00 M to 4.50 m | 129.82 | Cum | 627 | ₹81,397 | - |
| 5 | Item No.3
Excavation in general in hard material comprising of soft rocks, hard rock, manjara rock etc. by blasting / controlled blasting ,chiseling as re-quirked in wet or dry condition for head works I. e. 'intake well connecting pipe, jack well ,pump 'house supply well, etc. for lift 0 to1.5M and lead of 1.50M including barricading, guarding depositing off surplus excavated stuff within a radius 'of 0.5 km as directed by Engineer -in-charge excluding refilling.
Lift 4.50 M to 6.00 m | 106.27 | Cum | 1,332.1 | ₹1,41,562 | - |
| 6 | Lift 6.00 M to 7.50 m | 106.27 | Cum | 1,366.2 | ₹1,45,186 | - |
| 7 | Lift 7.50 M to 9.00 m | 23.84 | Cum | 1,400.3 | ₹33,383 | - |
| 8 | Lift 9.00 M to 10.50 m | 23.84 | Cum | 1,434.4 | ₹34,196 | - |
| 9 | Item No.4
Providing and laying in situ Cement concrete in proporation .... of trap metal for foundation and bedding, including balling out water manually, formwork, compacting and curing etc. complete. | 2.93 | Cum | 6,469.1 | ₹18,954 | - |
| 10 | Item No.5
Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-200grade.
1) R.C.C. M-250 for Beam | 6.19 | Cum. | 10,164 | ₹62,915 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_2235888.xls
BOQ • 0.43 MB
SutrakarTC.pdf
Tender Documents • 2.40 MB
SutrakarB1.pdf
Other Document • 1.67 MB
Download all tender documents and submit your bid