| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | L1 | Accepted-AOC AS PER APPROVED TCR | |
| 2 | Rejected-Technical 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | - | Rejected-Technical As per approved TCR | |
| 3 | Rejected-Technical | - | Rejected-Technical As per approved TCR |
| Sl No | Description | Qty | Unit | META ELECTRIC L1 |
|---|---|---|---|---|
| 1.00Item description | ||||
| 1.01 | Dismantling the coil from core for weighment | 1 | LS | 3,300 ₹3,300 Lowest |
| 1.02 | Charges for detanking and assembling of transformer | 1 | LS | 4,400 ₹4,400 Lowest |
| 1.03 | Cleaning of cooling tubes ans tanks | 1 | LS | 1,900 ₹1,900 Lowest |
| 1.04 | Wooden forma for coil making (Both primary & secondary) | 1 | LS | 4,000 ₹4,000 Lowest |
| 1.05 | All cooling pipe dismentaling and refitting the pipe again | 1 | LS | 4,400 ₹4,400 Lowest |
| 1.06 | Cooling pipe welding according requirment with selfos rod | 1 | LS | 6,050 ₹6,050 Lowest |
| 1.07 | MS channel fitted at tank both side as per requirment | 1 | LS | 6,100 ₹6,100 Lowest |
| 1.08 | Fitting of reformed coils in the limbs with required insulation and necessary coil connection. | 1 | LS | 1,620 ₹1,620 Lowest |
| 1.09 | Gaskets, nut bolts and other hardware items | 1 | LS | 4,750 ₹4,750 Lowest |
Tender Value
₹3.6 L
EMD Value
₹4,500
Closing Date
2 Sept 2025, 10:00 amClosed
General Manager,SSA
Office of the General Manager,SSA
Complete repairing/rewinding of 667 KVA, 11KV/3.3KV Transformer installed at Amkola substation of Nimcha Colliery under Satgram-Sripur Area
2025_ECL_341975_1
ECL/SSA/GM/E M/E-NIT/2025-26/67 Date 19.08.2025
Open Tender
Electrical and Maintenance Works
Fixed-rate
20 days
Nimcha Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,500
12 Dec 2025
23 Aug 2025
3 Sept 2025
23 Aug 2025
2 Sept 2025
23 Aug 2025
23 Aug 2025 - 27 Aug 2025
Amount
Item description
Dismantling the coil from core for weighment
Charges for detanking and assembling of transformer
Cleaning of cooling tubes ans tanks
Wooden forma for coil making (Both primary & secondary)
All cooling pipe dismentaling and refitting the pipe again
Cooling pipe welding according requirment with selfos rod
MS channel fitted at tank both side as per requirment
Fitting of reformed coils in the limbs with required insulation and necessary coil connection.
Gaskets, nut bolts and other hardware items
Copper Jumper
Drying of transformer at recommended temperature
Studs with insulators
Supply and fitting of tape changer
Supply of oil temperture indicator
Heater packets for winding temperture
Spary painting
Cleaning & de-carbonization of old secondary conductors
Replacement of primary damaged conductor
Re-insulation of primary conductor (DPC)
Repalcement of secondary damaged conductor
Re-insulation of old secondary conductor
Re-formation of primary coils as per old
Re-formation of secondary coils as per old
Thinner and varnish including baking, drying out at recommended temperature
Oil Filtration
Less scrap value
Transporting charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .