Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹12.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹12.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹12.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹12.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹12.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹12.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹12.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.7 L
EMD Value
₹12,685
Closing Date
30 Apr 2026, 5:00 pmClosed
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of Road and Drain at Malipda from Raja Pradhan house to Chintu Samal house road in Ward No.09.
2026_ORULB_128191_4
4/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹12,685
Yes
6 May 2026
21 Apr 2026
1 May 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismantling and removing cement concrete grade M-15 & M-20including T & P and scaffolding whereever necessary, sorting the dismantled material, disposal of unservicable material & stacking servicable material with all lifts & lead of 1000 metres. | 117 | cum | 618.35 | ₹72,346.95 |
| - | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | 54 | cum | 276.9 | ₹14,952.6 |
| - | Conveyance of excavated earth, cement concrete etc. upto 5Km. distance from worksite by mechanical means. | 165 | cum | 276.01 | ₹45,541.65 |
| - | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 65.21 | cum | 815.5 | ₹53,178.76 |
| - | C.C ( 1:3:6 ) using 4cm size b.h.g. (C.B.) metal including cost, conveyance & royalty of all materials, cost of all labour, labour cess, T & P, watering, curing etc. complete. | 65.21 | cum | 5,805.4 | ₹3,78,570.13 |
| - | C.C. (1:2:4) using 12mm size c.b.b.h.g.chips including cost, conveyance & royalty of all materials, cost of all labour , labour cess,T & P, watering, curing etc. complete. | 5.11 | cum | 7,458.5 | ₹38,112.94 |
| - | R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete | 32.38 | cum | 5,689.1 | ₹1,84,213.06 |
| - | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete | 274.06 | Sqm | 248.7 | ₹68,158.72 |
| - | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | 11.89 | qntl | 8,309.9 | ₹98,804.71 |
| - | Providing and laying 80 mm thick factory made cement concrete interlocking paver block of M.40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 517.1 | SQM | 608.4 | ₹3,14,603.64 |
stage.html
html • 0.02 MB
finance_588209.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_588209.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .