| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC QADIAN DISTT GURDASPUR 143516 | QADIAN | GURDASPUR | PUNJAB | 143516 | ₹15.2 L | L1 | Accepted-AOC ok |
| 2 | L2₹16.5 LRejected-Finance VILLAGE DHAROCHACK DISTRICT GURDASPUR | GURDASPUR | PUNJAB | ₹16.5 L | L2 | Rejected-Finance Reject |
| 3 | L3₹16.6 LRejected-Finance VILLAGE CHATHA BHAVDHANA SIRCH TEHSIL BATALA DISTRICT GURDASPUR PUNJAB | BATALA | GURDASPUR | PUNJAB | ₹16.6 L | L3 | Rejected-Finance Reject |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
12 Mar 2026, 5:00 pmClosed
Er. Jaspreet Singh Vermi
Executive Engineer Provincial Division Gurdaspur
Various Works Under MPLAD Scheme in MC Gurdaspur and MC Kalanaur Distt Gurdaspur for the year 2024 25
2026_CEPW_162768_1
Bid No 10 Dated 05.03.2026 MPLAD
Open Tender
Civil Works - Roads
90 days
Gurdaspur
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹35,000
Yes
17 Apr 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
Excavation in Soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lift and combined lead up to 60 mtr.
Compaction of earth work & Preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 300-2 as per Technical clause 305 of MORT&H specifications. CSR 24.4c
Kassi work undressed involving an average horizontal throw up to 2 metres and average vertical lift up to 0.5 metres as per CSR 6.1 a
Construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORD technical specifications
Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M-35 grade machine made rubber moulded smooth finish with strong vibratory process or with vibro hydraulic compaction machine and of approved size and design / shape laid in Ordinary Grey and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-in-Charge
Providing and fixing in position singel socket SWR UPVC soil waste or antisyphonage pipes as per IS 13592 of E.D.C manufacture or of any other reputed firm including cutting, jointing, wastage, but excluding cost of jointing. a) 160mm o/d single socket SWR UPVC pipe lines laid complete
Construction of TOE WALL
Earthwork in excavation in foundation in ordinary soil
Cement concrete 1:4:8 using stone ballast 40mm gauge in foundation
First class brick work laid in cement sand mortar 1:5 in foundation and plinth
Cement concrete 1:2:4 for coping on top of wall
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_329878.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
BOQ_329878.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid