| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.3 LAdmitted-Finance 197 KRISHNA NAGAR JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | L1 | Admitted-Finance | ||
| 2 | L2₹44.9 L+₹2.6 L (6.16%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹45.2 L+₹2.9 L (6.96%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹61.0 L+₹18.8 L (44.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-The bidder is not accepted as per SBD conditions (Old GST) |
Tender Value
₹71.7 L
EMD Value
₹1.4 L
Closing Date
22 Sept 2026, 6:00 pmClosed
Executive Engineer PWD(RandB) Div Khour
Executive Engineer PWD(RandB) Div Khour
Construction of Veterinary Dispensary at Milan-Di-Khui under UT Capex Budget 2026-27. (2nd Call)
2026_PWDJK_324794_1
Fresh Short e-NIT No. 39 of 2026-2027/Khour Dated 15-09-2026
Open Tender
Civil Works
Percentage
150 days
KHOUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
Convener, purchase committee, Directorate of ISM
₹1.4 L
Yes
Executive Engineer PWD(RandB) Div Khour
26 Sept 2026
15 Sept 2026
24 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 230 | cum. | 256.85 | ₹59,075.5 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 20 mm nominal size) | 90 | cum. | 4,826.5 | ₹4,34,385 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 88.5 | cum | 5,733.6 | ₹5,07,423.6 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level MIX1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 50 | cum. | 7,788.4 | ₹3,89,420 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 36 | cum. | 9,821.85 | ₹3,53,586.6 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:1.5:3. (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11 | cum. | 9,395.7 | ₹1,03,352.7 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at all levels:- Thermo-Mechanically Treated bars of grade Fe-500D or more. | 10,534 | Kg | 123.2 | ₹12,97,788.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases of columns etc. for mass concrete. | 524.34 | sqm | 286.35 | ₹1,50,144.76 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, pedestrals, pillars, piers, abutments, posts and struts | 101.3 | sqm | 742.55 | ₹75,220.31 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Lintel, beams, plinth beams, girders, bressumers and cantilevers | 118.68 | sqm | 577.55 | ₹68,543.63 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1095903.xls
BOQ • 0.30 MB
corrigendum.pdf
PDF • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .