Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹5.8 Cr |
Tender Value
₹7.6 Cr
EMD Value
₹15.1 L
Closing Date
2 Apr 2026, 3:00 pmClosed
RAJIV KUMAR CHAUDHARY
EXECUTIVE ENGINEER
FLOOD CONTROL DIVISION BEGUSARAI
Nawal Kishore Bharti
CE, Samastipur
A.E work near village Jafarnagar in front of Sanha Gorgama Embankment between Km 16.50 to 17.50 (Agenda No. 244/12/2026)
128037
SHORT TERM NIT 13/2025-26/FCD/BEGUSARAI/GR01
Open Tender
CIVIL
Khagaria
• Registration
• Legal Status of Bidder, Place of Registration, Principal place of Business & Power of attorney of signatory Bid
• EMD/TENDER FEE/TENDER PROCESSING FEE
• Annual Financial Turn Over of Last Five Years ( usually not less than half times the estimated cost of work for which bid has been invited ) (Rs in Lakhs)(UDIN MENTIONED) As per clause 4.3(f) of ITB of SBD.
• Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (Rs in Lakhs)
• Maximum Quantities of work done as prime contractor in any one year during last five years(As mentioned in Technical Bid Sheet/Tender Document)
• Bid Capacity,Existing Commitments and ongoing works,Work for which bid already submitted
• Availability of key items of Contractor's Equipment(As Per requirement mentioned in Technical Sheet) including Affidavit and Certificate
• List of Key Personnel /Affidavit and Certificate
• Evidence of accesses to Financial Resources
• Proposed methodology and programme of construction.
• Litigation History
• Affidavit(As per NIT/SBD/Tender Conditions)
• Bid Validity
• Undertaking regarding Non Association with Officials
• Undertaking(Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract.(IN LAKH))
• IT PAN and GST Registration
• Character Certificate
• NOC for Debar (If required)
• Any other documents as per NIT and SBD Tender Conditions
CIVIL
PERCENTAGE
L1
1
20 documents required · 20 mandatory
₹10,000
Processing Fee: 5900
₹15.1 L
O/o Chief Engineer,Flood Control & Drainage,WRD,Samastipur
4 May 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
28 Mar 2026
Technical Sheet
Name of Work Anti Erosion Work near village Jafar Nagar in front of Sanha Gorgama Embankment between Km 16.50 to Km 17.50. (AGENDA NO-244/12/2026) Cost of Work as per BOQ(Rs ) 75557559 Time of Completion in months 15.05.2026 (1.5 Months) ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sactioned Amount Date of Sanction Date of Tender 17.03.2026
Sl No. Items Requirement Requirement Cl. No. Name of the contractor
Address of the contractor
1 Bid Validity Bids shall remain valid for a period not less than 120 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 120 Days 15.1 Page/15 Bid validity periods In days
2 Bid Security Online Payment as per NIT 16.1 Page-16 Amount To be entered (Rs in Lakhs)
Unconditional bank guarantee from any scheduled /nationalized Indian bank issued in the format given in SBD Amount To be entered (Rs in Lakhs)
Amount To be entered (Rs in Lakhs)
Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. ) 1511200 Bid Security Amount - Rs.
3 (i) Legal Status of Bidder. 4.3(a) Page-9
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-9
4 Total value of civil engineering construction work performed in last five years. 1. Annual Financial Turn Over usually not less than half times the estimated cost of work for which bid has been invited (Rs in Lakhs) Attach ATO such as profit and loss statements and auditor's reports for the past five years; As per clause 4.3(f) of ITB of SBD 4.5(A) (a) Page-10 Page- 23, 28
2020-21 Amount To be entered (Rs in Lakhs)
2021-22 Amount To be entered (Rs in Lakhs)
2022-23 Amount To be entered (Rs in Lakhs)
2023-24 Amount To be entered (Rs in Lakhs)
2024-25 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.1
5 Work Experience of Similar nature Satisfactory completed atleast one similar work of value not less than 10% of estimated value of contract (Rs in Lakhs) Amount To be entered (Rs in Lakhs)
6 Maximum Quantities of work done as prime contractor in any one year during last five years. Items Unit Quantity 4.5A( c) Page-10 , Page - 23, 29
Earth work ( Cutting/Excavation / Fillng etc, cum 6106 Value to be entered in unit cum
Protection Work(Pitching/Crating/Soling with Boulder/Brick/Geo Bag/E.C Bag/Nylon Crates/Gabians etc) cum 9582
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of year for completion of works. B=Value of existing commitments & ongoing works to be completed in period(In Lakh) 755.58 4.7 Page- 11 Amount To be entered (Rs in Lakhs)
(a) Existing commitments and ongoing works Page - 29 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 30 Amount To be entered (Rs in Lakhs)
8 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required (Up to Rs. 10 Crore) Nos. Max. Age 4.5(B) (a) Page-10, 25, 30
POCKLAIN/EXCAVATOR/FRONT END LOADER 2
TRACTOR/TIPPER/DUMPER 16/4/4 5/6/6
9 Key Personnel Personnel/Qualification/Contract Package Size (Upto Rs. 10 Crore) 4.5(B) (b) Page-11, 26, 31
Site Engineer / B.E. Civil + 7 Years Experience (3 years in Irrigation Work or retired A.E. 1
Site Supervisor / Fress graduate in Civil or Diploma Civil + 3 Years Exp or Retired I.T.I. Holder 1
10 Evidence of accesses to Financial Resources Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). 4.2(i) Page-8 & 33 Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) 4.3(l) Page-9
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) 4.3(j) Page-9, P32
13 Affidavit Regarding statements made in the required attachments are true and correct and as stated in NIT. Page-34
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 4.2(ii) Page-9, Page - 35
15 Registration No. To be entered
16 Undertaking regarding Non Association with Officials as per clause 38 of SBD
17 I.T. & G.S.T. Registration
18 Character Certificate as per NIT and SBD
19 NOC for Debar (If required)
20 Any other documents as per NIT and SBD Tender Conditions
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. LAC) or as per RCD Letter no 2863(E) dt 7.06.2017
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In LAC) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further
Year Name of the work Name of the Employer* Quantity of work performed (cum) @ Remarks
Protection Work(Pitching/Crating/Soling with Boulder/Brick/Geo Bag/E.C Bag/Nylon Crates/Gabians etc) Masonry Earth works WBM WMM Bituminous Work Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs LAC) Stipulated Period of Completion Value of works* remaining to be completed (Rs LAC) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
Earth mover (Poclaine) Excavator/Front end loader As Per Technical Bid Sheet
Tractor/Tipper/Dumper As Per Technical Bid Sheet
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.11Information on litigation history in which the Bidder is involved.
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 BIDSECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK (E/W, GSB, WMM, BITUMINOUS WORK, PCC,PROTECTION WORK etc)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 LABOUR LICENSE
18 IT & GST REGISTRATION and CLEARANCE CERTIFICATE
19 NOC FOR DEBAR
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
BOQ For A.E work near village Jafarnagar in front of Sanha Gorgama Embankment between Km 16.50 to 17.50 (Agenda No. 244/12/2026)
Date of Tender :- 17.03.2026
Estimated Cost :- 75557559.00
Earnest Money :- 1511200.00
Time of Completion :- 15.05.2026
Cost of BOQ :- 10000.00
Bid Processing fee :- 5900.00
Sl. No. ITEMS OF WORK QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 Earth work in cutting and making slope in all kinds of soil with all leads and lifts as per specifications and direction of E/I 9860.00 M3 Per M3 123.90 1221654.00
2 Supply of New bag and N.C with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing in Nylon crate of size (1mx1mx1m) with a lead of 150m including do....do......specification and direction of E/I. lead 1km(K) 19210.00 Nos. Each 1403.60 26963156.00
3 Supply of New bag with labour for filling New E.C bag with local sand (volume of filled bag 1.2 cft and weight 50kg),stiching on two lines by approved nylon thread with stiching machine & generator,Stacking the bags and placing with a lead of 150m including supply of nylon threads etc ,all complete as per approved design,specification and direction of E/I. lead 1km(K) 4803 Nos. Each 53.50 256960.50
4 Providing , laying and filling Geo bags of size 1mx0.7m (Type A 300 GSM nonwoven) weight of bag 420 gm,volume of filled bag 0.07 cum, weight of filled Geo bag 126 kg with local sand including stiching in four lines by approved nylon thred with stiching machine and generator, stacking and placing in gabion of size 1.8mx1.8mx0.5m (18nos. Geo bags per gabion) after loading,unloading and carriage with the help of trolley within 150m lead all complete as per specification and direction of E/I
(A) With Royality Without Carriage 2670 Nos. Each 5985.00 15979950.00
(B) With Royality With Carriage lead 1km (k) 1794 Nos. Each 6317.70 11333953.80
5 Providing,laying & filling Geo bags of size 1mX0.7m (Type A 300GSM nonwoven) Weight 420gm,volume of filled bag 0.07 cum,weight of filled Geo bag 126kg with local sand including stiching in four lines by approved Nylon thread with stiching machine and generator,stacking and placing after loading,unloading and carriage with the help of Trolly within 150m lead , all complete as per specification and direction of E/I.
(A) With Royality Without Carriage 3630 Nos. Each 203.50 738705.00
(B) With Royality With Carriage lead 1km (k) 26608 Nos. Each 222.00 5906976.00
6 Earth work in filling in foundation trenches and backfilling of structure in layers not exceeding 150 mm thick well watered, rammed and fully compacted and finaly dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile within a lead of 30m and lift of 1.5m complete job as per specification and direction of E/I 5404.02 M3 Per M3 151.10 816547.42
Add 1 % Cess 632179.03
Executive Engineer, Flood Control Division, Begusarai
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBD 244122026.docx
NIT • 0.37 MB
ALL LETTER OF SBD TENDER.pdf
NIT • 12.26 MB
letter_1015_m Urgent.pdf
NIT • 0.82 MB
Circular Letter No 4732 dt 29.08.2023.pdf
NIT • 0.25 MB
CIRCULAR UDIN.pdf
NIT • 0.09 MB
SHORT TERM NIT 13 2025-26.pdf
NIT • 5.19 MB
SBD 244122026.docx
NIT • 0.37 MB
TECHNICAL BID SHEET 244122026.xls
NIT • 0.12 MB
BOQ 244122026.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .