Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.1 LAdmitted-Fee/PreQual/Technical/Finance | -18.99% | ₹30.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹37.0 LAdmitted-Fee/PreQual/Technical/Finance | -0.50% | ₹37.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹37.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹37.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹37.2 L
EMD Value
₹74,500
Closing Date
20 Aug 2026, 5:00 pmClosed
ZILA ABHIYNTA LATEHAR
ZILA ABHIYNATA OFFICE LATEHAR
Construction of PCC Road from Bichala Tola Main Road to Nanho Singh Kherwar via Haldi Tanr Dhani Sing at Sevdhara GP Rankikala Block- Manika District- Latehar.
2026_ZPLAT_117360_1
ZP/LATEHAR/12/2026-27/ Gr_24 (2nd Call)
Open Tender
Civil Works - Roads
Percentage
135 days
MANIKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹74,500
22 Aug 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 meters outside the periohery of the area as per Technical Specification clause 201 . S.O.R item no. 2.02 | 0.12 | Hac | 19,760.3 | ₹2,371.24 |
| 2 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m S.O.R item no. 3.06 | 246.75 | M3 | 62.4 | ₹15,397.2 |
| 3 | Compacting Original ground Supporting Subgrade(Loosening of the ground a level of 500 mm below the sub-grade level , watered, graded and compacted in layers to meet requirement of Table 300-2 for subgrade construction) S.O.R item no. 3.20 Case- I | 246.75 | M3 | 52.6 | ₹12,979.05 |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. S.O.R Item no. 3.18 (II) | 148.05 | M3 | 131.3 | ₹19,438.97 |
| 5 | Construction of Granular Sub- base ( for grading -I Material) by providing close graded material, spreading in uniform layers with motor graded on prepared surface , mixing in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density . complete as per Technical Specicification . S.O.R 4.01 B (I) | 246.75 | M3 | 1,952.97 | ₹4,81,895.35 |
| 6 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing . SOR item no. 6.02 | 282 | M3 | 6,029 | ₹17,00,178 |
| 7 | E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material anddisposal utpa leadof 50m, dressingof sidesand bottom backfilling in trenches with excavated suitable material. S.O.R. Item No. 3.13 I A | 126 | M3 | 316.2 | ₹39,841.2 |
| 8 | Plain/Reinforcedcementconcreteinopenfoundationcompleteas per drawing and Technical Specifications (P.C.C. Grade M-15) S.O.R. Item No. 12.8 A | 18 | M3 | 4,366.42 | ₹78,595.56 |
| 9 | Stonemasonrywork incementmortar in foundationcompleteas perdrawingandtechnicalspecificationsClauses702,704,1202& 1203 SquareRubbleCoursedRubbleMasonry (1st sort) inC.M. (1:3) S.O.R. Item No. 12.7 (b) | 86.4 | M3 | 4,486.55 | ₹3,87,637.92 |
| 10 | Stonemasonryworkincementmortar insub-structurecompleteas perdrawingandtechnicalspecificationsClauses702,704,1202& 1203 Random Rubble Masonry Work in Cement Mortar 1:3 in S/S S.O.R. Item No. 13.4 A | 58.5 | M3 | 4,457.95 | ₹2,60,790.07 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_158606.xls
BOQ • 0.25 MB
Group_24.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].