| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC ACCEPTED BEING THE LOWEST TENDERER |
| 2 | L2₹1.5 Cr+₹24.6 L (19.8%)Rejected-Finance AT ROAD MES TINALI PO CHABUA DISTT DIBRUGARH ASSAM 84 | CHABUA | DIBRUGARH | ASSAM | 786102 | ₹1.5 Cr+₹24.6 L (19.8%) | L2 | Rejected-Finance REJECTED NOT BEING THE LOWEST |
| 3 | L3₹1.7 Cr+₹41.7 L (33.6%)Rejected-Finance | ₹1.7 Cr+₹41.7 L (33.6%) | L3 | Rejected-Finance REJECTED NOT BEING THE LOWEST |
| 4 | L4₹1.8 Cr+₹54.1 L (43.5%)Rejected-Finance A T ROAD CHABUA DIBRUGARH ASSAM 786184 | DIBRUGARH | ASSAM | 786184 | ₹1.8 Cr+₹54.1 L (43.5%) | L4 | Rejected-Finance REJECTED NOT BEING THE LOWEST |
| Sl No | Description | Qty | Unit | M/S R G Construction L2 | kabitaconstruction L4 | M/s Dhruv Enterprises L3 | M/s RILO TRADING AGENCY L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | SCHEDULE 'A' PART-I : BUILDING WORKS
Lump Sum Priced worked out by the Contractor for BUILDING WORKS as Listed in SCHEDULE 'A' PART-I of Rs. 24,81,000.00 inserted by MES at SERIAL PAGE No._17(R)_. | 1 | LUMP SUM | 73,96,400 ₹73,96,400 | 84,00,000 ₹84,00,000 | 85,96,400 ₹85,96,400 | 45,00,000 ₹45,00,000 Lowest |
| 2.00 | SCHEDULE 'A' PART-II : EARTH WORKS
Lump Sum Priced worked out by the Contractor for EARTH WORKS as Listed in SCHEDULE 'A' PART-II of Rs. 3,91,852.33 inserted by MES at SERIAL PAGE No._18_. | 1 | LUMP SUM | 2,60,827 ₹2,60,827 Lowest | 3,91,852 ₹3,91,852 | 3,91,852.33 ₹3,91,852.33 | 5,00,000 ₹5,00,000 |
| 3.00 | SCHEDULE 'A' PART-III : INTERNAL WATER SUPPLY
Lump Sum Priced worked out by the Contractor for INTERNAL WATER SUPPLY as Listed in SCHEDULE 'A' PART-III of Rs. 6,122.75 inserted by MES at SERIAL PAGE No._19_. | 1 | LUMP SUM | 11,200 ₹11,200 | 6,122 ₹6,122 Lowest | 12,245.5 ₹12,245.5 | 7,653.43 ₹7,653.43 |
| 4.00 | SCHEDULE 'A' PART-IV : INTERNAL ELECTRIFICATIONS
Lump Sum Priced worked out by the Contractor for INTERNAL ELECTRIFICA-TIONS as Listed in SCHEDULE 'A' PART-IV of Rs. 6,21,407.19 inserted by MES at SERIAL PAGE No._24_. | 1 | LUMP SUM | 7,14,618 ₹7,14,618 Lowest | 9,50,000 ₹9,50,000 | 7,76,758.9 ₹7,76,758.9 | 9,50,000 ₹9,50,000 |
| 5.00 | SCHEDULE 'A' PART-V : AIR CONDITIONING & UPS
Lump Sum Priced worked out by the Contractor for AIR CONDITIONING & UPS as Listed in SCHEDULE 'A' PART-V of Rs. 2,97,449.60 inserted by MES at SERIAL PAGE No._25_. | 1 | LUMP SUM | 2,54,000 ₹2,54,000 Lowest | 2,97,449.6 ₹2,97,449.6 | 2,65,000 ₹2,65,000 | 5,00,000 ₹5,00,000 |
| 6.00 | SCHEDULE 'A' PART-VI : ROADS, PATHS & CULVERTS
Lump Sum Priced worked out by the Contractor for ROADS, PATHS & CULVERTS as Listed in SCHEDULE 'A' PART-VI of Rs. 4,94,319.90 inserted by MES at SERIAL PAGE No._26(R)_. | 1 | LUMP SUM | 5,93,624 ₹5,93,624 Lowest | 9,14,300 ₹9,14,300 | 6,17,899.8 ₹6,17,899.8 | 9,00,000 ₹9,00,000 |
| 7.00 | SCHEDULE 'A' PART-VII : SEWAGE DISPOSAL
Lump Sum Priced worked out by the Contractor for SEWAGE DISPOSAL a,s Listed in SCHEDULE 'A' PART-VII of Rs. 76,757.57 inserted by MES at SERIAL PAGE No._27(R)_. | 1 | LUMP SUM | 95,946.96 ₹95,946.96 Lowest | 1,35,000 ₹1,35,000 | 98,950 ₹98,950 | 1,20,000 ₹1,20,000 |
| 8.00 | SCHEDULE 'A' PART-VIII : EXTERNAL WATER SUPPLY
Lump Sum Priced worked out by the Contractor for EXTERNAL WATER SUPPLY as Listed in SCHEDULE 'A' PART-VIII of Rs. 1,23,415.28 inserted by MES at SERIAL PAGE No._28_. | 1 | LUMP SUM | 1,78,952 ₹1,78,952 Lowest | 2,50,000 ₹2,50,000 | 1,81,952 ₹1,81,952 | 2,00,000 ₹2,00,000 |
| 9.00 | SCHEDULE 'A' PART-IX : EXTERNAL ELECTRIFICATIONS
Lump Sum Priced worked out by the Contractor for EXTERNAL ELECTRIFICA -TIONS as Listed in SCHEDULE 'A' PART-IX of Rs. 11,69,405.90 inserted by MES at SERIAL PAGE No._29_. | 1 | LUMP SUM | 18,64,840 ₹18,64,840 Lowest | 22,94,088 ₹22,94,088 | 18,75,850 ₹18,75,850 | 20,00,000 ₹20,00,000 |
| 10.00 | SCHEDULE 'A' PART-X : LIGHTING ARRESTOR & CHEMICAL EARTHING
Lump Sum Priced worked out by the Contractor for LIGHTING ARRESTOR & CHEMICAL EARTHING as Listed in SCHEDULE 'A' PART-X of Rs. 5,517.60 inserted by MES at SERIAL PAGE No._30_. | 1 | LUMP SUM | 8,000 ₹8,000 | 5,000 ₹5,000 Lowest | 8,500 ₹8,500 | 9,000 ₹9,000 |
Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
18 Mar 2026, 6:00 pmClosed
CWE (AF) JORHAT
HQ CWE (AF) JORHAT ROWRIAH 785004
84142/E8 PROVN OF OTM ACCN WITH ALLIED WORK SERVICES AT PASSIGHAT UNDER GE (AF) CHABUA
2026_MES_751264_1
84142/E8
Open Tender
Civil Works
Lump-sum
365 days
GE (AF) CHABUA
AS PER NIT
8 documents required · 8 mandatory
₹1,000
GE (AF) CHABUA
₹2.1 L
Yes
3 Sept 2026
4 Feb 2026
25 Mar 2026
4 Feb 2026
18 Mar 2026
11 Mar 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TENDER84142.pdf
Tender Documents • 3.43 MB
PREPRICED84142.pdf
Additional Documents • 0.38 MB
BOQ_841414.xls
BOQ • 0.39 MB
da5.pdf
PDF • 0.20 MB
FINALAMENDMENT84142.pdf
PDF • 1.29 MB
DA.pdf
PDF • 0.62 MB
AMDT3.pdf
PDF • 0.27 MB
finalAmdt2_84142.pdf
PDF • 3.27 MB
finalAmdt2_84142.pdf
PDF • 3.27 MB
AMDT1.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .