| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
26 May 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP)SEDAPATTI
PANCHAYAT UNION OFFICE SEDAPATTI
Madurai District Construction of 2 Nos of New Community Hall at Sedapatti Block under MPLAD
2022_RDTN_233603_1
Sedapatti/MPLADS/p01
Open Tender
Civil Works
Item Rate
120 days
sedapatti
Refer Tender document
3 documents required · 3 mandatory
₹0
₹40,000
30 May 2022
24 May 2022
26 May 2022
24 May 2022
26 May 2022
24 May 2022
Amount
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulder SS 20 A HGS for foundation.
Basement filling for Conveyanced Earth filling complying with standard specification for filling in foundation and basement.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs as dir
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Brick work in CM 1:5 mix using country bricks including all cost and conveyance of all materials and all labour charges etc., complete
Supplying and laying interlocking Paver Block of 80 mm thick of required shape in C.M.1:1:2 mix using 10-12 mm size HGB stone jelly including cost and conveyance and shuttering , laying vibrating (with machanical vibrating) finishing curing land the cost including transporting charges etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat ,inculding through scrapping, clean removal of dirt etc. complete and inculding necessary plasterof paris , putty whereever required .
Supply and fixing of steel grill gate of size 6.00 x 2.10 m
Towards Name Bord charges
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulder SS 20 A HGS for foundation.
Basement filling for Conveyanced Earth filling complying with standard specification for filling in foundation and basement.
Supply and filling good river sand complying with standard specification for filling in basement.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs as dir
Brick work in CM 1:5 mix using country bricks including all cost and conveyance of all materials and all labour charges etc., complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings etc., complete complying with standard specifications and as directed by the department
Supply of steel door of size 1.50x2.10m including cost and conveyance of all materials to site of work and all labour charges etc complete.
Supply of steel door of size 1.2x2.10m including cost and conveyance of all materials to site of work and all labour charges etc complete.
Supply steel window of size1.20x1.30m including cost and conveyance of all materials to site of work and all labour charges etc complete.
Supply steel Ventilator of size 0.90 x 0.45m including cost and conveyance of all materials to site of work and all labour charges etc complete.
Towards the labour charges for fixing of steel door , windows and RCC Jolly including all materials and labours charges etc. complete.
Towards the cost and supply of MANHOLE COVER of size 0.75 x 0.75 m including cost and conveyance of all materials to site of work and all labour charges etc complete.
Plastering the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface etc
plastering 12mm thick with CM 1:5 mix including all cost and conveyance of all material to siteand labour charges etc. complete.
Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required density.
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk and laid straight alignment and pointed neatly with colour cement at the rate of 0.40 kg/m2 laid without any air gap in the tiles neatly and fixing in position as per the colour & quality of tiles should be got approved.
Exterior Emulsion ( Plastic Emulsion ) two coats over a coat of primer including preparation of surface by removing loose particles and other materials including cost and conveyance of all material and labour charges etc. complete.
Painting with ready mixed synthatic enamel paint two coats including prepration of surfaces by removing loose particles and other materials and applying steel lip wherever required to make the surface level and smooth including cost and conveyance of all
Wiring with light point SD No. 20
Supply & Fixing of Tube Light Fitting
Wiring with Plug point SD No. 36
Wiring with Fan point SD No.22
Supplying and Fixing of Fan SD No.107
Supply & Fixing of Main with Board SD No 125
Supply & Fixing of Meter board with fuse carrier SD No 128
Supply & run of Service wire SD No. 64
Provision for Rainwater Strucrure
Provision for Toilet arrangements (Sub estimate)
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulder SS 20 A HGS for foundation.
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site for foundation and flooring.
Filling in Foundation and basement in excavated earh layers of not more than 15 cm thick
R.C.C. 1:1.5 :3 using 20mm HBG metal including cost and conveyance of all materials to site for Plinth Beam.
Brick work in CM 1:5 mix using country bricks including all cost and conveyance of all materials and all labour charges etc., complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings etc., complete complying with standard specifications and as directed by the department
plastering 10 mm thick with CM 1:3 mix including all cost and conveyance of all material to siteand labour charges etc. complete.
Supply and Fixing of New Steel Door of Size (0.75 x 1.80 )
Supply and Fixing of RCC Jolly of Size ( 0.60 x 0.30 )
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadoing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface
Plastering with cm 1:5 12 mm thick including cost and conveyance and all labour charges etc complete
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
White washing two coats with best shell lime including cost and conveyance and all labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Painting with enamel synthetic paint in new iron works including cost and conveyance and all labour charges etc complete
Supplying & Fixing in position of Indian type Water closet(colur) 580x440mm of approved quality
Supplying & Fixing in position of Hand wash basin of approved quality without pedestal
Supplying & Fixing of 500 ltr capacity HDPE syntex tank
Provision for Name Board(Granight Stone) and Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SATHEESH R
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .