| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC | ₹39.0 L Quoted ₹39.9 L | L1 | Accepted-AOC Accepted L1 |
| 2 | L2₹41.7 LRejected-AOC | ₹41.7 L | L2 | Rejected-AOC Other than L1 |
| 3 | L3₹46.1 LRejected-AOC | ₹46.1 L | L3 | Rejected-AOC Other than L1 |
| 4 | L4₹51.8 LRejected-AOC | ₹51.8 L | L4 | Rejected-AOC Other than L1 |
| Sl No | Description | Qty | Unit | JR CONSTRSTRUCTION CO. L3 | M/s Rajesh Kumar Contractor L4 | M/S Mahajan Construction Co. L1 | M/S KARAN SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition / taking down of existing old tarfelt , water proofing membrane, water proofing plaster of any description and of any type over RCC roof including roof tiles, cement mortar screed of any thickness including making good the surface to receive new screed and removal of debris outside the MoD land complete all as specified and as directed. | 385 | Sqm | 2 ₹770 Lowest | 50 ₹19,250 | 10 ₹3,850 | 10 ₹3,850 |
| 2.00 | 15mm thick plaster on roof / concrete surfaces incl parapet etc in cement mortar 1:3 and finished even and smooth without using extra cement and mixed with waterproofing compound as per manufacturers instructions.
(Note. WPC shall be measured and paid separately). | 385 | Sqm | 90 ₹34,650 Lowest | 160 ₹61,600 | 150 ₹57,750 | 100 ₹38,500 |
| 3.00 | Supply only liquid water proofing admixture conforming to IS 2645-1975 of approved make complete all as specified and directed.(Dosage- @ 200ml per 50Kgs of Bags of cement) | 15 | Ltr | 40 ₹600 Lowest | 50 ₹750 | 101 ₹1,515 | 50 ₹750 |
| 4.00 | Roof treatment :- Water proofing treatment to RCC roof slab including parapet as under :- (a) Ist Course : Apply a coat of bituminous primer conforming to IS-3384@ 0.40 Kg /Sqm on prepared surface of plaster and after drying of primer, apply a coat of hot blown 85/25 grade bitumen conforming to IS-702 @ 1.2 Kg/sqm on plastered surfaces.
(b) 2nd Course : APP (Atactic Polypropylene) modified polymeric membrane, 5 layered, 3 mm thick weight not less than 3.0 Kg/Sqm with 150 Grams/Sqm non woven polyester made at centre core reinforced laid with 75 mm side overlap and 150 mm end overlap, membrane has to be laid with LPG torch and overlap sealed and finished neat, all joints.
(c) 3rd Course : Apply a coat of hot blown 85/25 grade bitumen confirming to IS-702 @ 1.2 Kg/sqm over membrane and dusted with dry sand @ 0.50 to 1 Kg/sqm.
(i) On Non-accesible roof : After providing (a) to (c) provide aluminium paint as per manufacturer instructions. (ii) Coved fillet in PCC 1:2:4 type B0 (using 12.5 mm graded crushed stone aggregate) of required radius 75mm shall be provided at the junction of roof and vertical surface such as parapet wall/mumty after all laid 250mmx250mmx25mm thick PCC tile over 15mm screed complete all as directed
Note : (i) Roof treatment work shall be carried out through approved manufacturers only or through their authorised personal only. | 385 | Sqm | 370 ₹1,42,450 Lowest | 800 ₹3,08,000 | 400 ₹1,54,000 | 550 ₹2,11,750 |
| 5.00 | PCC 1:2:4 type B-1 (using 20mm graded crushed stone aggregate) as in roof kerb, padding , finished surface even and fair, complete all as specified and directed. | 10 | Cum | 3,000 ₹30,000 Lowest | 4,000 ₹40,000 | 4,000 ₹40,000 | 4,500 ₹45,000 |
| 6.00 | Sunken Floor treatment :-
Providing and laying of water proofing treatment to sunken portion including vertical portion by applying cement slurry mixed with acrylic based polymer modified cementitious composite compound of make as specified and approved including demolition and filling of sunken floor with & including PCC 1:5:10 type E-2 (using 40mm brick aggregate).
(a) First layer of slurry of cement @0.488 Kg/Sqm mixed with acrylic based polymer modified cementitious composite compound @ 0.253 Kg/Sqm. This layer allowed to air cure for 4 Hours.
(b) Second layer of slurry of cement @0.242 kg/Sqm mixed with acrylic based polymer modified cementitious composite compound @ 0.125 Kg/Sqm. This layer allowed to air cure for 4 Hours.
(c) 15mm thick plaster in CM 1:3 mixed with WP compound to be provided while concrete is still green.
(d) Joint of/Trap/WC/Soil pipes shall be properly sealed with sealing compound.
Note:(a) Concrete for sunken slabs shall be mixed with WP compounds as per manufacturer's instructions. Before carrying out water proofing treatment the sunken slab shall be tested with water for 48 hours for any leakage /dampness is seen in ceiling below, then treatment is again carried out to RCC slab and it is again tested before passing for next stage. (The rate quoted includes water proofing compound as per manufacturers instructions).
(b) Please note that only floor area shall be measured for payment purpose. | 30 | Sqm | 800 ₹24,000 | 1,000 ₹30,000 | 500 ₹15,000 Lowest | 650 ₹19,500 |
| 7.00 | Demolition of brick work or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc but excluding ashlar facings, dressed stonework, precast concrete articles, complete all as specified and as directed. | 8 | Cum | 50 ₹400 Lowest | 100 ₹800 | 100 ₹800 | 50 ₹400 Lowest |
| 8.00 | Brick work with sub class ‘B’ bricks straight or curved on plan exceeding 6m mean radius built in cement mortar 1:6, complete all as specified and directed. | 6 | Cum | 3,500 ₹21,000 Lowest | 4,500 ₹27,000 | 5,000 ₹30,000 | 4,500 ₹27,000 |
| 9.00 | Brick work with sub class B brick straight or curved on plan to any radius in half brick thick built in CM 1:4 complete all as specified and directed. | 2 | Sqm | 700 ₹1,400 | 500 ₹1,000 Lowest | 1,000 ₹2,000 | 800 ₹1,600 |
| 10.00 | Taking down cement plaster from brick or stone walls etc incl racking out joints hacking for key, scrubbing down with water etc receive new plaster etc all as specified and directed. | 1,250 | Sqm | 10 ₹12,500 | 15 ₹18,750 | 2 ₹2,500 Lowest | 2 ₹2,500 Lowest |
Tender Value
₹49.2 L
EMD Value
₹98,500
Closing Date
14 Apr 2026, 6:00 pmClosed
GE (N) Akhnoor
GE (N) Akhnoor co 56 APO PIN 181201
SPL REPAIR TO BLDG NO P-72 AT RLT VIHAR AND PROVN OF HOT AND COLD WATER COOLER FOR MH UNDER GE (N) AKHNOOR
2026_MES_757444_1
GE(N)/Akh-85/2025-26
Open Tender
Civil Works
Item Rate
180 days
Akhnoor
Class D cat a i
8 documents required · 8 mandatory
₹500
GE (N) Akhnoor
₹98,500
Yes
16 Jun 2026
24 Mar 2026
21 Apr 2026
24 Mar 2026
14 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolition / taking down of existing old tarfelt , water proofing membrane, water proofing plaster of any description and of any type over RCC roof including roof tiles, cement mortar screed of any thickness including making good the surface to receive new screed and removal of debris outside the MoD land complete all as specified and as directed. | |||||
| 2 | 15mm thick plaster on roof / concrete surfaces incl parapet etc in cement mortar 1:3 and finished even and smooth without using extra cement and mixed with waterproofing compound as per manufacturers instructions.
(Note. WPC shall be measured and paid separately). | 385 | Sqm | - | - |
| 3Supply only liquid water proofing admixture conforming to IS 2645-1975 of approved make complete all as specified and directed.(Dosage- @ 200ml per 50Kgs of Bags of cement) | |||||
| 4Roof treatment :- Water proofing treatment to RCC roof slab including parapet as under :- (a) Ist Course : Apply a coat of bituminous primer conforming to IS-3384@ 0.40 Kg /Sqm on prepared surface of plaster and after drying of primer, apply a coat of hot blown 85/25 grade bitumen conforming to IS-702 @ 1.2 Kg/sqm on plastered surfaces. (b) 2nd Course : APP (Atactic Polypropylene) modified polymeric membrane, 5 layered, 3 mm thick weight not less than 3.0 Kg/Sqm with 150 Grams/Sqm non woven polyester made at centre core reinforced laid with 75 mm side overlap and 150 mm end overlap, membrane has to be laid with LPG torch and overlap sealed and finished neat, all joints. (c) 3rd Course : Apply a coat of hot blown 85/25 grade bitumen conforming to IS-702 @ 1.2 Kg/sqm over membrane and dusted with dry sand @ 0.50 to 1 Kg/sqm. (i) On Non-accesible roof : After providing (a) to (c) provide aluminium paint as per manufacturer instructions. (ii) Coved fillet in PCC 1:2:4 type B0 (using 12.5 mm graded crushed stone aggregate) of required radius 75mm shall be provided at the junction of roof and vertical surface such as parapet wall/mumty around opening and treatment mentioned above shall be applied followed by a cement plaster 20mm thick in cement mortar(1:6). Note : (i) Roof treatment work shall be carried out through approved manufacturers only or through their authorised personal only. | |||||
| 5PCC 1:2:4 type B-1 (using 20mm graded crushed stone aggregate) as in roof kerb, padding , finished surface even and fair, complete all as specified and directed. | |||||
| 6Sunken Floor treatment :- Providing and laying of water proofing treatment to sunken portion including vertical portion by applying cement slurry mixed with acrylic based polymer modified cementitious composite compound of make as specified and approved including demolition and filling of sunken floor with & including PCC 1:5:10 type E-2 (using 40mm brick aggregate). (a) First layer of slurry of cement @0.488 Kg/Sqm mixed with acrylic based polymer modified cementitious composite compound @ 0.253 Kg/Sqm. This layer allowed to air cure for 4 Hours. (b) Second layer of slurry of cement @0.242 kg/Sqm mixed with acrylic based polymer modified cementitious composite compound @ 0.125 Kg/Sqm. This layer allowed to air cure for 4 Hours. (c) 15mm thick plaster in CM 1:3 mixed with WP compound to be provided while concrete is still green. (d) Joint of/Trap/WC/Soil pipes shall be properly sealed with sealing compound. Note:(a) Concrete for sunken slabs shall be mixed with WP compounds as per manufacturer's instructions. Before carrying out water proofing treatment the sunken slab shall be tested with water for 48 hours for any leakage /dampness is seen in ceiling below, then treatment is again carried out to RCC slab and it is again tested before passing for next stage. (The rate quoted includes water proofing compound as per manufacturers instructions). (b) Please note that only floor area shall be measured for payment purpose. | |||||
| 7Demolition of brick work or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc but excluding ashlar facings, dressed stonework, complete all as specified and as directed. | |||||
| 8Brick work with sub class ‘B’ bricks straight or curved on plan exceeding 6m mean radius built in cement mortar 1:6, complete all as specified and directed. | |||||
| 9Brick work with sub class B brick straight or curved on plan to any radius in half brick thick built in CM 1:4 complete all as specified and directed. | |||||
| 10Taking down cement plaster from brick or stone walls incl racking out joints hacking for key, scrubbing down with water etc all as specified and directed. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_848441.xls
BOQ • 1.41 MB
tender85.pdf
Tender Documents • 1.12 MB
Corrigendum85.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].