| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance Lowest |
| 2 | L2₹1.0 Cr+₹39,755 (0.39%)Rejected-Finance GANGTA NIWAS KUFTADHAR TEHSIL DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171002 | ₹1.0 Cr+₹39,755 (0.39%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹1.0 Cr+₹49,452 (0.49%)Rejected-Finance | ₹1.0 Cr+₹49,452 (0.49%) | L3 | Rejected-Finance 3rd Lowest |
| 4 | L4₹1.0 Cr+₹78,541 (0.78%)Rejected-Finance | ₹1.0 Cr+₹78,541 (0.78%) | L4 | Rejected-Finance 4th Lowest |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
1 Apr 2026, 10:00 amClosed
Executive Engineer Division Kasumpti HPPWD Shimla
Executive Engineer Division Kasumpti HPPWD Shimla-3
Repair and Maintenance of Civil works including water supply and sanitary Installation (Block-A)
2026_PWD_132583_1
SD-I-CTR-Tender-2025-26- 27794-813 dt 25-3-26
Open Tender
Civil Works
Percentage
180 days
Shimla
AS per SBD
15 documents required · 15 mandatory
₹2,000
₹1.9 L
10 Jun 2026
27 Mar 2026
1 Apr 2026
27 Mar 2026
1 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavating trenches of required width for pipes, cables, etcetra including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m (One point five metre), including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm (Twenty centimetres) in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m (Fifty metre) Pipes, cables etc. exceeding 80 mm (Eighty milimetres) dia. but not exceeding 300 mm (Three hundred milimetres) dia complete in all respect including carriage of material within all leads, lifts and other. incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 2Demolishing cement concrete 1:4:8 (one cement isto four sand isto eight graded / crushedd stone aggregate) or leaner mix (including equivalent design mix) manually/ by mechanical means including disposal of material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 3Demolishing brick work manually/ by mechanical means in cement mortar including stacking of serviceable material and disposal of material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 4Taking out doors, windows and clerestory window shutters (steel or wood) 3 (three) square metres and below including stacking of serviceable material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 5Taking out doors, windows and clerestory window shutters (steel or wood) area beyond 3 (three) square metres including stacking of serviceable material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 6Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 7Dismantling tile work For thickness of tiles upto any thickness in floors and roofs laid in cement mortar including stacking the material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 8Dismantling roofing including ridges, hips, valleys and gutters etcwtra and stacking the material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 9Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable of material as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
| 10Providing and laying in position cement concrete 1:4:8 (One cement isto four sand isto eight graded broken/crushed stone aggregate 40mm (Forty millimetres) nominal size mechanically mixed and vibrated curing complete excluding the cost of centering and shuttering in foundation and plinth including carriage of material within all leads, lifts and other incidentals as per approved drawing, design, specifications and as directed by the Engineer-In-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.50 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.71 MB
SBD9696381correct.pdf
Tender Documents • 10.79 MB
additinalconadition.pdf
Additional Documents • 0.57 MB
BOQ_196066.xls
BOQ • 0.51 MB
Corrigundam28009.pdf
PDF • 1.01 MB
SEapproval25008.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .