| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹67.9 L+₹2.0 L (2.98%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.0 Cr+₹35.4 L (53.7%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical Technically not Qualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified. |
| Sl No | Description | Qty | Unit | MOHD SAJID L2 | M/s Khan Contractor L3 | M/S.SHREEJEE PAINTS L1 |
|---|---|---|---|---|---|---|
| 0.00Note: The Bidder should note following points in connection to this tender: (1) The scope of work includes both technical and colony area at RRCAT, Indore. (2) The Work of repainting includes both residential and public buildings. In case of residential quarters the painting work will be carried out in vacated quarters during the vacation period as decided by the Enigneer-In Charge. (3) The water proofing treatment shall be carried out based on complaints/requirement from users/as decided by the Engineer-in-charge. The area to be taken up for water proofing may include part or Whole of the buildings as decided by the Engineer-in-Charge. The material required for water proofing shall be stocked according to the requirement. (4) The Total quantity of materials, tools and plants, scaffolding required as per the scehdule quantities to be procured as per the instructions of the Engineer-in-charge and stocked well in advance at the site.(5) The Store/Godown for storing materials, tools & plants for the work will be resposibility of the contractor at RRCAT premises and at the location as decided by the Engineer-in Charge.(6) Safety requirement to be followed as per tender conditions.(7) The bidder must possess valid EPF & ESIC registration. The bidders need to deposit EPF & ESIC with appropriate authority. The reimbursement for EPF & ESIC deposit shall not be made. (8) The payment of wages to labourers should be made through bank. (9) The bidder must posses sufficient manpower & other resources (As deatiled in SGF) required for timely completion of work. | ||||||
| 1.00 | Dismantling the mosaic tiles/white glazed tile/kotah stone/Mangalore tiles including Ridges etc. in flooring/skirting/dado etc. including dismanteling of bedding mortor/overdeck insulation etc. stacking of materials within 50 meters lead and disposing of debris within 50 mtr. lead etc. complete as directed by the Engineer-in-Charge. | 500 | Sqm | 30 ₹15,000 Lowest | 86 ₹43,000 | 30 ₹15,000 Lowest |
| 2.00 | Dismantling old plaster or skirting, racking out joints and cleaning the surfaces for plaster including scaffolding, disposal of debris to the dumping ground within 50 mtr. lead etc. complete as per drawings, specifications and as directed by the Engineer-in-Charge. | 250 | Sqm | 20 ₹5,000 Lowest | 56 ₹14,000 | 30 ₹7,500 |
| 3.00 | Water proof cement plaster 20 mm thick at all levels in cement mortar 1:3, finished smooth with neat cement punning and addition of water proofing compound @ 2% by weight of cement or as per recommendation of manufacturers, over treated / untreated R. C. C. roof slab (after applying cement slurry) including double scaffolding, curing, hacking of concrete surfaces, reaparing visible holes/honeycomb if any etc. complete as per drawings, specifications and as directed by the Engineer-in-charge. | 1,500 | Sqm | 400 ₹6,00,000 | 666 ₹9,99,000 | 380 ₹5,70,000 Lowest |
| 4.00 | Applying at all levels two coats of Cement Slurry duly modified with acrylic polymer hydrocrete of preffered make polymers in one or two part system including removing fungal growth if any, surface preparation , instant plugging of visible source of ingress using approved equivelent polymers of preffered make, penetrable grouting of surface using mixing of cement and approved acrylic polymer @ 50 % by weight of cement for application in each coat (base coat with ordinary cement and top coat with white cement of approved brand), glass fibre matt of min. 45 gsm, curing each coat for at last three days , scaffolding , cost of all materials like cement, colour pigment mixed with acrylic polymer, water proofing compound, approved equivalent grouts , cleaning items, requisite labourers, tools and tackles, testing by ponding etc. complete as per drawing, generally as per Manufacturer's specifications/recommendation and as directed by Engineer- in- Charge. Note:- 1) The waterproofing treatment is to be guaranteed for bone dry condition for a period of 05 years. 2) The measurement for payment shall be the actual superficial area covered by the treatment. Edges shall be treated but shall not be measured seperately. 3) An amount @ 10% of the gross value of the item shall be with held by the department for the period of 05 years from the date of completion.(as per service guarantee) | 1,500 | Sqm | 400 ₹6,00,000 | 486 ₹7,29,000 | 200 ₹3,00,000 Lowest |
| 5.00 | Repairing the cracks in wall/ceilling by making groove of size 6mm X 6mm, cleaning the grooved surface, remove loose material if any, fill the crack with elastomeric polymer based crack filling compound of preffered make polymers in one or two part system including removing fungal growth if any, surface preparation , scaffolding , cost of all materials, requisite labourers, tools and tackles etc. complete generally as per Manufacturer's specifications/ recommendation and as directed by Engineer- in- Charge. | 500 | Rm | 30 ₹15,000 | 186 ₹93,000 | 20 ₹10,000 Lowest |
| 6.00 | Providing & applying breathable, non reactive, transperent,antifungal, non blackening-wettable, water repellent coat of seal coat of preffered make, silicon in solvent base of preffered make with two coats as per manufacturers specifications (after treating the surfaces for cracks, cleaning the surface, all wax, oil or grease should be removed by swabbing with a suitable solvent, followed by a thorough scrubbuing with a mild detergent ) at all levels on old horizental & /or vertical cemented surfaces to give water tight surface of uniform finish without causing any scratch or damage etc.complete generally as per manufacturers specifications and as directed by the Engineer-in-Charge. Note:- 1) The waterproofing treatment is to be guaranteed for bone dry condition for a period of 03 years. 2) An amount @ 10% of the gross value of the item shall be with held by the department for the period of 03 years from the date of completion.(as per service guarantee) | 1,500 | Sqm | 250 ₹3,75,000 | 386 ₹5,79,000 | 150 ₹2,25,000 Lowest |
| 7.00 | Removing bitumin based water proofing treatment from terrace, chajjas etc. & disposal of all materials within 50 meter lead including cost of all materials, labour, tools & tackles, scraping the surface to make it clean, scaffolding etc. complete as per specification and as directed by the Engineer-in-charge. | 500 | Sqm | 20 ₹10,000 Lowest | 66 ₹33,000 | 30 ₹15,000 |
| 8.00 | Disposing by mechanical transport; the garbage consisting of debris, rubbish, cartons as packing boxes, iron scraps, bitumasic sheets etc. from domestic houses/office to the predetermined locations in RRCAT campus including loading, unloading, levelling, carrying by mechanical transport as required to maintain cleanliness around houses & buildings in RRCAT campus including cost of tools & tackles, covering to avoid pilferage etc. complete as per specifications and as directed by Engineer-in-Charge. | 20 | Trip | 2,000 ₹40,000 | 786 ₹15,720 Lowest | 1,000 ₹20,000 |
| 9.00 | Providing and laying 3mm thick and weight 4kg/m². APP Polymer Modified bituminous membrane (non-woven polyester reinforced) of preffered make, weighing not less than 160 grams/m² and having specified properties by torch welding over a layer of the bituminous primer @ 0.3kg/m² (minimum) and confirming to IS-3384, 1965 on prepared surfaces, side and end laps between adjacent rolls shall be kept 10 cms and 15 cms respectively and torch bonded by hot round nosed trowel to ensure water tightness. Providing and applying on top of the membrane two coats of reflective Aluminum paint all as per manufacturer's specification & as directed by Engineer-in-charge. & as directed by Engineer-in-charge. Note: 1. The waterproofing treatment shall be guaranteed for absolute water tightness for a period of 5 years. The measurement for payment shall be the entire area of slab/walls covered by the treatment in m². and no extra shall be paid for laps. 2. An amount @ 10% of the value of the item shall be withheld by the department for a period of 5 years from the date of completion. | 500 | Sqm | 450 ₹2,25,000 Lowest | 886 ₹4,43,000 | 500 ₹2,50,000 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
7 Aug 2026, 3:00 pmClosed
CHIEF ENGINEER, RRCAT, INDORE
CSD OFFICE RRCAT INDORE
Internal and External painting and Water proofing treatment to various buildings at RRCAT,Indore.
2026_RRCAT_916860_1
RRCAT/CSD/W-4414/2026/148
Open Tender
Civil Works
Item Rate
365 days
RRCAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.2 L
15 Oct 2026
10 Jul 2026
10 Aug 2026
13 Jul 2026
7 Aug 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the mosaic tiles/white glazed tile/kotah stone/Mangalore tiles including Ridges etc. in flooring/skirting/dado etc. including dismanteling of bedding mortor/overdeck insulation etc. stacking of materials within 50 meters lead and disposing of debris within 50 mtr. lead etc. complete as directed by the Engineer-in-Charge. | 500 | Sqm | - | - |
| 2 | Dismantling old plaster or skirting, racking out joints and cleaning the surfaces for plaster including scaffolding, disposal of debris to the dumping ground within 50 mtr. lead etc. complete as per drawings, specifications and as directed by the Engineer-in-Charge. | 250 | Sqm | - | - |
| 3 | Water proof cement plaster 20 mm thick at all levels in cement mortar 1:3, finished smooth with neat cement punning and addition of water proofing compound @ 2% by weight of cement or as per recommendation of manufacturers, over treated / untreated R. C. C. roof slab (after applying cement slurry) including double scaffolding, curing, hacking of concrete surfaces, reaparing visible holes/honeycomb if any etc. complete as per drawings, specifications and as directed by the Engineer-in-charge. | 1,500 | Sqm | - | - |
| 4 | Applying at all levels two coats of Cement Slurry duly modified with acrylic polymer hydrocrete of preffered make polymers in one or two part system including removing fungal growth if any, surface preparation , instant plugging of visible source of ingress using approved equivelent polymers of preffered make, penetrable grouting of surface using mixing of cement and approved acrylic polymer @ 50 % by weight of cement for application in each coat (base coat with ordinary cement and top coat with white cement of approved brand), glass fibre matt of min. 45 gsm, curing each coat for at last three days , scaffolding , cost of all materials like cement, colour pigment mixed with acrylic polymer, water proofing compound, approved equivalent grouts , cleaning items, requisite labourers, tools and tackles, testing by ponding etc. complete as per drawing, generally as per Manufacturer's specifications/recommendation and as directed by Engineer- in- Charge. Note:- 1) The waterproofing treatment is to be guaranteed for bone dry condition for a period of 05 years. 2) The measurement for payment shall be the actual superficial area covered by the treatment. Edges shall be treated but shall not be measured seperately. 3) An amount @ 10% of the gross value of the item shall be with held by the department for the period of 05 years from the date of completion.(as per service guarantee) | 1,500 | Sqm | - | - |
| 5 | Repairing the cracks in wall/ceilling by making groove of size 6mm X 6mm, cleaning the grooved surface, remove loose material if any, fill the crack with elastomeric polymer based crack filling compound of preffered make polymers in one or two part system including removing fungal growth if any, surface preparation , scaffolding , cost of all materials, requisite labourers, tools and tackles etc. complete generally as per Manufacturer's specifications/ recommendation and as directed by Engineer- in- Charge. | 500 | Rm | - | - |
| 6 | Providing & applying breathable, non reactive, transperent,antifungal, non blackening-wettable, water repellent coat of seal coat of preffered make, silicon in solvent base of preffered make with two coats as per manufacturers specifications (after treating the surfaces for cracks, cleaning the surface, all wax, oil or grease should be removed by swabbing with a suitable solvent, followed by a thorough scrubbuing with a mild detergent ) at all levels on old horizental & /or vertical cemented surfaces to give water tight surface of uniform finish without causing any scratch or damage etc.complete generally as per manufacturers specifications and as directed by the Engineer-in-Charge. Note:- 1) The waterproofing treatment is to be guaranteed for bone dry condition for a period of 03 years. 2) An amount @ 10% of the gross value of the item shall be with held by the department for the period of 03 years from the date of completion.(as per service guarantee) | 1,500 | Sqm | - | - |
| 7 | Removing bitumin based water proofing treatment from terrace, chajjas etc. & disposal of all materials within 50 meter lead including cost of all materials, labour, tools & tackles, scraping the surface to make it clean, scaffolding etc. complete as per specification and as directed by the Engineer-in-charge. | 500 | Sqm | - | - |
| 8 | Disposing by mechanical transport; the garbage consisting of debris, rubbish, cartons as packing boxes, iron scraps, bitumasic sheets etc. from domestic houses/office to the predetermined locations in RRCAT campus including loading, unloading, levelling, carrying by mechanical transport as required to maintain cleanliness around houses & buildings in RRCAT campus including cost of tools & tackles, covering to avoid pilferage etc. complete as per specifications and as directed by Engineer-in-Charge. | 20 | Trip | - | - |
| 9 | Providing and laying 3mm thick and weight 4kg/m². APP Polymer Modified bituminous membrane (non-woven polyester reinforced) of preffered make, weighing not less than 160 grams/m² and having specified properties by torch welding over a layer of the bituminous primer @ 0.3kg/m² (minimum) and confirming to IS-3384, 1965 on prepared surfaces, side and end laps between adjacent rolls shall be kept 10 cms and 15 cms respectively and torch bonded by hot round nosed trowel to ensure water tightness. Providing and applying on top of the membrane two coats of reflective Aluminum paint all as per manufacturer's specification & as directed by Engineer-in-charge. & as directed by Engineer-in-charge. Note: 1. The waterproofing treatment shall be guaranteed for absolute water tightness for a period of 5 years. The measurement for payment shall be the entire area of slab/walls covered by the treatment in m². and no extra shall be paid for laps. 2. An amount @ 10% of the value of the item shall be withheld by the department for a period of 5 years from the date of completion. | 500 | Sqm | - | - |
| 10 | Scraping the walls and concrete surfaces to remove the existing wite wash, distemper etc., at all height including necessary scaffolding inclusive of the cost of sand papers, steel scrapers etc. complete as per drawing, specifications and as directed by Engineer-in-charge. | 10,000 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.94 MB
NIT.pdf
Tender Documents • 0.92 MB
SGF.pdf
Tender Documents • 1.96 MB
CCC.pdf
Tender Documents • 2.45 MB
SpecificationCivil.pdf
Tender Documents • 1.72 MB
ScheduleA.pdf
Tender Documents • 0.49 MB
ScheduleB.pdf
Tender Documents • 0.19 MB
BOQ_963530.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .