| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAccepted-AOC | ₹11.6 Cr Quoted ₹11.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹12.0 CrRejected-Finance | ₹12.0 Cr | L2 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 3 | L3₹12.1 CrRejected-Finance | ₹12.1 Cr | L3 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 4 | L4₹12.2 CrRejected-Finance | ₹12.2 Cr | L4 | Rejected-Finance REJECTED BEING HIGHER RATE |
Tender Value
₹16 Cr
EMD Value
₹30 L
Closing Date
20 Feb 2024, 12:00 pmClosed
SE Lucknow Circle PWD. Lucknow
SE Lucknow Circle PWD. Lucknow
Widening and Strengthening of Maharajganj-Chandapur to Semarauta Road (ODR)
2024_CEUCZ_895141_1
865/401C-LKOCIR/2023-24 DATED 05.022024
Open Tender
Civil Works
360 days
Raebareli
Widening and Strengthening of Maharajganj-Chandapur to Semarauta Road (ODR)
2 documents required · 2 mandatory
₹2,714
₹30 L
Yes
SE Lucknow Circle PWD. Lucknow
14 Mar 2024
12 Feb 2024
20 Feb 2024
12 Feb 2024
20 Feb 2024
12 Feb 2024
13 Feb 2024
Amount
Construction of subgrade and earthen shoulders with material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to the desired dry density not less then 97% as per table 300-2. work should be done as per MORTH & H Specification Clause 305 complete in all respects.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Construction of Subgrade with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to the desired dry density not less then 97% as per table 300-2. work should be done as per MORTH & H Specification Clause 305 complete in all respects. (Compaction Only) Including all labour & T&P with all taxes etc complete but excluding GST.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material. .Including all labour & T&P with all taxes etc complete but excluding GST.
Construction of granular sub-base by grade-1 for providing well graded material from approved quarry , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete as per Technical Specification Clause 401.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Scarifying existing bituminous road surface to a depth of 20 mm and disposal of scraified material within all lifts and lead upto 1000 metres.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Stabilized WMM:-Providing, laying and spreading of graded stone aggregate (WMM) after mixing with 3.5% Emulsion & 1% OPC cement with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying in uniform single layer with paver as cemented base on sub base/sub grade ( modified soil) and compacting with the road roller to achieve the desire compaction as per MORT & H Specification Clause 406 complete in all respects Including all material, labour & T&P with all taxes etc complete but excluding GST.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-30 Grade over a prepared sub base with approved grade cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing . Including all material, labour & T&P with all taxes etc complete but excluding GST.
Providing and applying tack coat with bitumen VG-10 using Bitumen Boiler with sprayer at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom as per MoRT & H Specifications Clause 503 complete in all respects.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Providing and laying bituminous concrete Grading 2 with higher capacity batch type hot mix plant producing using crushed aggregates from approved quarry of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.(Including all labour & T&P with all taxes etc complete but excluding GST.)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compected by vibration including curing for 14 days.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Brick work in 1:3 cement and coarse sand mortar including supply of all material, labour T .P. etc. required for proper completion of work.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Furnishing and Placing Reinforced cement concrete M-25 in super-structure as per drawing and Technical Specification.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Furnishing and Placing Reinforced cement concrete M-20 in super-structure as per drawing and Technical Specification.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Supplying, fitting and placing HYSD bar / SAIL TMT bar reinforcement in super-structure complete as per drawing and technical specifications.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Drainage Spouts complete as per drawing and Technical specification.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Pointing with cement mortar 1:3(C:Cs) deep veriety (cut or weather) on brick & tile work including supply of all materials, labour and T&P reqd. for proper completion of work as per drawing & technical specification clauses 613.3 and 1204 Standard data book for analysis of rates for Rural Roads, Sr. no. 12.2,[MORt&H Specification 600] Including all material, labour & T&P with all taxes etc complete but excluding GST.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Laying reinforced cement concrement NP-3 pipe 600 mm dia for culverts on first class bedding of granular material in single row including fixing coller with cement motar 1:2 but excluding excavation protection work back filling concrete and masonary works in head walls as per MORT & H specification 2900 laying in diversion and hume pipe culvert.Including all material, labour & T&P with all taxes etc complete but excluding GST.
Laying reinforced cement concrement NP-3 pipe 1000 mm dia for culverts on first class bedding of granular material in single row including fixing coller with cement motar 1:2 but excluding excavation protection work back filling concrete and masonary works in head walls as per MORT & H specification 2900 laying in diversion and hume pipe culvert.Including all material, labour & T&P with all taxes etc complete but excluding GST.
M/s Ram Singh Agarwal
M/S LUCKY TRADERS
M/s Raj Laxmi Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid