Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 222 346 LUKERGANJ LUKERGANJ LUKERGANJ ALLAHABAD UTTAR PRADESH 211003 | PRAYAGRAJ | UTTAR PRADESH | 211003 | Admitted-Finance |
| 2 | Admitted-Finance UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance 16F 1K NEW MARKET BAMRAULI NEAR BAMRAULI RAILWAY STATION ALLAHABAD UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
20 Nov 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
ETD-II 132 KV GIS OPH Near kamla Nehru Road Prayagraj
strengthening of three phase Aux AC supply system at 220 KV Stn Cantt Prayagraj
2021_UPTCL_642528_1
05/ETD-II(P)/2021-22
Open Tender
Electrical Works
Fixed-rate
60 days
220 KV Stn Cantt Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
Executive Engineer
₹1,000
23 Nov 2021
12 Nov 2021
20 Nov 2021
12 Nov 2021
20 Nov 2021
12 Nov 2021
90 days
Amount
Connection of 3.5 C × 400 mm² Power Cable by making proper joint including the cost of suitable size lugs and consumable materials.
Dismantling of old and burnt main switches from ACDB-1 by opening cable connection and nut bolts burned bus bar strip, Cleaning of all carbon from bus bar, Supply and Fixing of following capacity main switches at the place of old main switches. Making all cable connection by using proper size lugs & bus bar strip and connector. All labour and T&P and consumable item will be provided by contactor at his own cost. (a) 3 Phase 160 Amp.,415 Volt Main Switch Havells make
Dismantling of old and burnt main switches from ACDB-1 by opening cable connection and nut bolts burned bus bar strip, Cleaning of all carbon from bus bar, Supply and Fixing of following capacity main switches at the place of old main switches. Making all cable connection by using proper size lugs & bus bar strip and connector. All labour and T&P and consumable item will be provided by contactor at his own cost. (a) 3 Phase 63 Amp.,415 Volt Main Switch Havells make
Complete overhauling of 415 Volt Air Circuit Breaker. The Job include of mechanical assembly by opening assembly mechanism cleaning, oiling, greasing & tightening of all nut & bolts and mechanism box. Checking & tightening of all ac connection/terminals, including other associated work also if required for satisfactory completion of job. All labour and T&P and consumable item will be provided by contractor at his own cost.
Replacement of indication lamp of ACDB –I & II (70 Nos.) including of the cost of all associated work, wire & indication bulbs etc.
Repairing of one no. damaged back door of ACDB-I including all associated work.
Complete overhauling of 415 volt bus coupler including all associated work.
NEELAM ENTERPRISES
R.S.ASSOCIATE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .