General Manager, Zone-7, Lucknow
General Manager, Zone-7, U.P. Projects Corporation Ltd. Lucknow. Gomti Barrage, Left Bank, Gomti Nagar Lucknow
Construction of boundary wall and gate for Campus (Principal Residence) at Autonomous State Medical College Auraiya District-Auraiya (U.P.)
2026_UPPRC_1139635_2
10/UPPCL/GM-7/E-TENDER/2026-27 Dated-10.04.2026
Open Tender
Civil Works
270 days
District-Auraiya (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹6.1 L
13 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of boundary wall and gate for Campus (Principal Residence) at Autonomous State Medical College Auraiya District-Auraiya (U.P.) | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the ide of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). | 7,943.9 | KG | 550.28 | ₹43,71,369.29 | BI01010001010000000000000515BI0100001123 |
| 3 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after.
The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 5,500 | SQM | 240.98 | ₹13,25,390 | BI01010001010000000000000515BI0100001123 |
| 4 | INTERLOCKING
Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 35.2 | CUM | 185.45 | ₹6,527.84 | BI01010001010000000000000515BI0100001123 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag ce engineer-in-charge; for the followinggrades of concrete.M10 Grade | 77.64 | CUM | 6,294.42 | ₹4,88,698.77 | BI01010001010000000000000515BI0100001123 |
| 6 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineerin- charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge | 14.08 | CUM | 7,208.07 | ₹1,01,489.63 | BI01010001010000000000000515BI0100001123 |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 30.8 | CUM | 1,513.02 | ₹46,601.02 | BI01010001010000000000000515BI0100001123 |
| 8 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. | 440 | SQM | 777.94 | ₹3,42,293.6 | BI01010001010000000000000515BI0100001123 |
| 9 | EXTENSION BOUNDARY WALL
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.67 | CUM | 8,196.85 | ₹30,082.44 | BI01010001010000000000000515BI0100001123 |
| 10 | TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. | 4.83 | QTL. | 7,683.54 | ₹37,111.5 | BI01010001010000000000000515BI0100001123 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.61 MB
BOQ_2174627.xls
BOQ • 0.55 MB
BIDDOC10rt.pdf
Tender Documents • 21.47 MB
Cori10.pdf
Additional Documents • 0.53 MB
Download all tender documents and submit your bid