| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹49.8 L+₹5.9 L (13.4%)Rejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L2 | Rejected-Finance Rejected being L2 | |
| 3 | L3₹49.8 L+₹5.9 L (13.5%)Rejected-Finance NO 9 1ST FLOOR C J N HERITAGE PWD MAIN ROAD AKASH NAGAR B NARAYANAPURA DOORAVANI NAGAR BANGALORE 560016 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560016 | L3 | Rejected-Finance Rejected being L3 | |
| 4 | L4₹49.9 L+₹6.0 L (13.7%)Rejected-Finance M S RRK PROJECTS D 306 ADG P CHENNAI 11 3RD CROSS SIR MV LAYOUT VIDHYARANYAPURA POST BANGALORE 560097 | BENGALURU URBAN | KARNATAKA | 560097 | L4 | Rejected-Finance Rejected being L4 | |
| 5 | L5₹50.0 L+₹6.1 L (13.9%)Rejected-Finance | L5 | Rejected-Finance Rejected being L5 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
11 Apr 2023, 6:00 pmClosed
GE I RD East Bangalore
GE I RD East Bangalore 93
REPAIR MAINTENANCE TO CENTRAL AC PLANTS UNDER VARIOUS LABS UNDER GE I RD EAST BANGALORE
2023_MES_586580_1
8379
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE I RD East Bangalore
D c (i)
8 documents required · 8 mandatory
₹500
Yes
GE I R AND D East Bangalore
₹96,000
Yes
11 Aug 2023
21 Mar 2023
13 Apr 2023
22 Mar 2023
11 Apr 2023
4 Apr 2023
22 Mar 2023 - 28 Mar 2023
Amount
M & L for Periodical maintenance of Central AC plants of any capacity like checking for proper electrical connection, checking/tightening of V belt, checking refrigerant pipe line, arresting refrigerant gas leakage if any, checking of proper functioning of electrical control panel, checking/cleaning of pre filter (twice in a month), cleaning of out door unit with soap solution and routine checking to ensure smooth running of package AC plants including preparation of monthly inspection report in the register as per proper format for each plant installed at following locations complete all as specified and as directed (a) Central AC Plant 1 x 34.5 TR + 1 X 34.5 TR standby at SIMULATION Bldg AC Plant (b) Central AC Plant 2 x 8.5 TR for Flight Simulator Doom 1 &2 (c) Central AC Plant 2 x 60 TR + 1 X 60 TR standby at RUSTOM II (d) Central AC Plant 2 x 60 TR + 1 X 60 TR standby at NIRBHAYA Note: Replacement of unserviceable spare parts will be measured and paid separately.
M & L for Periodical maintenance of Central AC plants of any capacity like checking for proper electrical connection, checking/tightening of V belt, checking refrigerant pipe line, arresting refrigerant gas leakage if any, checking of proper functioning of electrical control panel, checking/cleaning of pre filter (twice in a month), cleaning of out door unit with soap solution and routine checking to ensure smooth running of package AC plants including preparation of monthly inspection report in the register as per proper format for each plant installed at following locations complete all as specified and as directed (a) Central AC Plant 2 x 40 TR + 1 X 40 TR standby at P-63 Abdul Kalam Sabhagana (b) Central AC Plant 2 x 15 TR + 1 X 15 TR standby at CASSA Bldg (c) Central AC Plant 1 x 27.5 TR at SAMEEKSHA (d) Central AC Plant 2 x 18 TR at FTTI/ Avionics Note: Replacement of unserviceable spare parts will be measured and paid separately.
M & L for Periodical maintenance of Central AC plants of any capacity like checking for proper electrical connection, checking/tightening of V belt, checking refrigerant pipe line, arresting refrigerant gas leakage if any, checking of proper functioning of electrical control panel, checking/cleaning of pre filter (twice in a month), cleaning of out door unit with soap solution and routine checking to ensure smooth running of package AC plants including preparation of monthly inspection report in the register as per proper format for each plant installed at following locations complete all as specified and as directed (a) Central AC Plant 1 x 16 TR at PCDG Bldg (b) Central AC Plant 1 x 20 TR + 2 X 16 TR standby at AK Bldg (c) Central AC Plant 3 x 50 TR + 2 X 50 TR standby at SIMEL AC Plant (e) Central AC Plant 2 x 30 TR at Aerodynamics Bldg (e) Central AC Plant 2 x30 TR at FRP Bldg Note: Replacement of unserviceable spare parts will be measured and paid separately.
M & L for Evacuating of refrigerant gas from the plant into the empty cylinder for up to 120 TR capacity central AC plants, leak testing of the plant with nitrogen (N2) pressure by separating the entire system like low side, high side compressor condensers and rectifying the leakage vacummising re-charging of evacuated refrigerant gas and testing complete all as directed. Note: Topping up of gas will be measured and paid separately.
M & L for descaling of condensing unit up to 40 TR capacity of air-conditioning plants by circulating descaling agent (HCL) through the condensers by forced feed method after removing of the end covers of the condensers, cleaning of each tube of condensers thoroughly by the brushing and refixing the end covers of the condensers, replacement of old/unserviceable rubber gasket, bolts, nuts & washers, cleaning of spray nozzles, cup, water line strainer and testing spray nozzles for proper functioning on working pressure complete all as specified and as directed.
M & L for cleaning of FRP cooling tower of round/bottle/suare type of up to 60 TR capacity by opening the top cover of cooling tower, removing the spare pipe and nozzles properly without any damage to clean the same, cleaning the PVC fills and cooling tower base through circulating caustic soda mixed with water solution for half-an-hour and drain out the dirty water, cleaning the entire cooling tower with wire brush including replacement of old/unserviceable worn out gaskets, bolts, nuts & washers and painting the cooling tower completely with enemelled paint as per instructions of Engr-in-Charge including testing and commissioning for proper functioning complete all as specified and as directed.
M & L for disconnecting compressor of 33 TR from the system for maintenance/ servicing after closing by suitable dummy plates on suction and discharge valves and opening the compressor & removing of all internal parts, cleaning of the all parts thoroughly, polishing of crank shaft, piston pin including replacement of thrust washers, spring washers and nut bolts etc, and re-fixing back all parts, refixing the compressor in the system and removing of the dummy plates, leak testing of the compressor, testing and commissioning of the compressor all as directed. Notes: a) Compressor oil will be measured and paid separately. b) Spare parts required to be replaced will be measured and paid separately.
M & L for disconnecting compressor of 20TR from the system for maintenance/ servicing after closing by suitable dummy plates on suction and discharge valves and opening the compressor & removing of all internal parts, cleaning of the all parts thoroughly, polishing of crank shaft, piston pin including replacement of thrust washers, spring washers and nut bolts etc, and re-fixing back all parts, refixing the compressor in the system and removing of the dummy plates, leak testing of the compressor, testing and commissioning of the compressor all as directed. Notes: a) Compressor oil will be measured and paid separately. b) Spare parts required to be replaced will be measured and paid separately.
M & L for disconnecting compressor of 15TR/ 16TR capacity from the system for maintenance/ servicing after closing by suitable dummy plates on suction and discharge valves and opening the compressor & removing of all internal parts, cleaning of the all parts thoroughly, polishing of crank shaft, piston pin including replacement of thrust washers, spring washers and nut bolts etc, and re-fixing back all parts, refixing the compressor in the system and removing of the dummy plates, leak testing of the compressor, testing and commissioning of the compressor all as directed. Notes: a) Compressor oil will be measured and paid separately. b) Spare parts required to be replaced will be measured and paid separately.
M & L for disconnecting compressor of 10 TR from the system for maintenance/ servicing after closing by suitable dummy plates on suction and discharge valves and opening the compressor & removing of all internal parts, cleaning of the all parts thoroughly, polishing of crank shaft, piston pin including replacement of thrust washers, spring washers and nut bolts etc, and re-fixing back all parts, refixing the compressor in the system and removing of the dummy plates, leak testing of the compressor, testing and commissioning of the compressor all as directed. Notes: a) Compressor oil will be measured and paid separately. b) Spare parts required to be replaced will be measured and paid separately.
Supply and replacement of unserviceable following spare parts as per item No 7, 8, 9 & 10 suitable for ANY TYPE OF compressor of 33/20/16/15/10 TR capacity and model
Main bearing front and rear end
Cylinder liner
Connecting rod
Discharge valve assembly
Piston assembly
Oil pump gear wheel with bush
Rocker arm frame
Oil filter
Suction strainer
Gasket Set
Crank shaft
SV Reed
CR Bearing
Aluminium Washer Set
CR Nut & Bolt
O Ring set
S V spring
M & L for disconnecting compressor of 15 TR from the system for maintenance/ servicing after closing by suitable dummy plates on suction and discharge valves and opening the compressor & removing of all internal parts, cleaning of the all parts thoroughly, polishing of crank shaft, piston pin including replacement of thrust washers, spring washers and nut bolts etc, and re-fixing back all parts, refixing the compressor in the system and removing of the dummy plates, leak testing of the compressor, testing and commissioning of the compressor all as directed Notes: a) Compressor oil will be measured and paid separately. b) Spare parts required to be replaced will be measured and paid separately.
Supply and replacement of unserviceable following spare parts as per item No 29 suitable for compressor of 15 TR capacity Make of the spares should be as per existing
Main bearing front and rear end
Cylinder liner
Connecting rod
Discharge valve assembly
Piston assembly
Oil pump gear wheel with bush
Rocker arm frame
Oil filter
Suction strainer
Gasket Set
Crank shaft
SV Reed
CR Bearing
Aluminium Washer Set
CR Nut & Bolt
O Ring set
S V spring
M & L for dismantling and taking out the existing unserviceable compressor induction motor after disconnecting the electric connection and in let/out lets, transporting to workshop, removing the burnt out winding from slots, cleaning the rotor slots with CTC and emery paper and rewinding the motor with as per existing size of new supper enameled copper winding wire and insulating by using class ‘B’ insulation keeping for drying, bring back to site, reassemble the motor, transporting back to site and fixing in position, connecting electric connections and in let/outs including testing and commissioning for its satisfactory performance including taking down old unserviceable copper widing complete all as specified and as directed for the following capacities :-
40 HP capacity
25 HP capacity
20 HP capacity
15 HP capacity
M & L for disconnecting and removing the condensing pump set from the central AC plant installations transporting to workshop for repairing after opening up pump set and replacing of unserviceable ball bearings, including cleaning, oiling, greasing of internal parts, replacement of worn out nut, bolts, washers and gland packing etc, transporting back to site, reassembling in the central AC plantincluding testing and commissioning complete for proper functioning complete all as specified all as directed for the following capacities :-
7.5 HP capacity
5 HP capacity
3 HP capacity
M & L for dismantling and taking out the existing unserviceable blower motor after disconnecting the electric connection, transporting to workshop, removing the burnt out winding from slots, cleaning the rotor slots with CTC and emery paper and rewinding the motor with as per existing size of new supper enameled copper winding wire and insulating by using class ‘B’ insulation keeping for drying, bring back to site, reassemble the motor, transporting back to site and fixing in position, connecting electric connections including testing and commissioning for its satisfactory performance including taking down old unserviceable copper widing complete all as specified and as directed for the following capacities :-
15 HP capacity
10.3 HP/10 HP/7.5 HP capacity
5 HP/3 HP capacity
M & L for dismantling and taking out the existing unserviceable CT Fan motor after disconnecting the electric connection, transporting to workshop, removing the burnt out winding from slots, cleaning the rotor slots with CTC and emery paper and rewinding the motor with as per existing size of new supper enameled copper winding wire and insulating by using class ‘B’ insulation keeping for drying, bring back to site, reassemble the motor, transporting back to site and fixing in position, connecting electric connections including testing and commissioning for its satisfactory performance including taking down old unserviceable copper widing complete all as specified and as directed for the following capacities :-
10 BHPcapacity
3 BHP/2 BHP capacity
1.5 BHP/1 BHP capacity
Supply and fixing of the following HP/LP & pressure cutouts including dismantling of unserviceable cutouts of any type complete all as specified and as directed.
HP/LP Cutouts
Oil pressure cutouts
Supply and fixing of V-belt for AC plants of the following sizes including removing of old/unserviceable V belt all as specified and as directed.
V Belt of size Up to B-95
V Belt of size above B-95 to B-120
M & L for replacement of unserviceable single phase preventer of following capacity for three phase motor starter type to protect motor from the control panel in AC plants including aking out old/unserviceable single phase preventor complete and testing complete all as specified and as directed.
Phase Failure Relay (Single phase preventor) Auto Reset, 40 Volts. Unbalance, 1 CO Contact
Phase Failure Relay (Single phase preventor) Auto / Manual / Remote Reset Adj. Unbalance, 2 CO Contact Make : MINILEC/MINITEC/BEC
M & L for replacement of unserviceable AC power contactor of following capacity from the control panel in AC plants including reconnectiong/testing complete all as specified and as directed.
AC power contactor upto 16 Amps capacity 440 volts, 50 Hz, 3 phase Make: Siemens Cat No 3TF32 or equivalent
AC power contactor 16 Amps up to 32 Amps capacity 440 volts, 50 Hz, 3 phase Make: Siemens Cat No 3TF34 or equivalent
AC power contactor 32 Amps up to 63 Amps capacity 440 volts, 50 Hz, 3 phase Make: Siemens Cat No 3TF47 or equivalent
Supply and fixing of Bimetal overload relay of the following capacity for central AC plants including taking out old/unserviecable relay of any type/capacity complete all as specified and as directed. Make: L&T /Siemens /BCH.
Bimetal over load relay upto 16 Amps capacity
Bimetal over load relay over 16 amps upto 32 Amps capacity.
Bimetal over load relay over 32 amps upto 63 Amps capacity.
Supply and fix PVC fills suitable for following capacity cooling tower including removing unserviceable fills complete all as specified and as directed
60 TR capacity
40 TR capacity
Supply and fixing of shaft seal assembly of compressor of any capacity including removing of the unserviceable shaft seal assembly and testing & commissioning complete all as specified and as directed.
Supply and weld ball valve of size model DN-25 made out from carbon steel with stainless steel ball with teflon sheeting including necessary modification of existing pipe line to fix new ball valve etc including taking out old/unserviceable ball valve of any make complete all as specified and as directed
Supply and weld ball valve of size model DN-40/50 made out from carbon steel with stainless steel ball with teflon sheeting including necessary modification of existing pipe line to fix new ball valve etc including taking out old/unserviceable ball valve of any make complete all as specified and as directed
Supply and charging of compressor oil servo friz F 68 after draining out old/unserviceable compressor oil complete all as specified and as directed. Make of oil : INDIAN OIL or equivalent in BPCL/HPCL
Supply and fixing of cooling tower sprinkler with spin suitable for up to 60 TR capacities cooling tower including removing of unserviceable sprinkler complete all as specified and as directed
Supply & Charge refrigerant gas R-22.
Supply and fix pressure relief valve (safety valve) suitable for compressor including taking down unserviceable pressure relief valve complete all as specified and as directed.
Supply and fix catchall filter of suitable size for 8.5 TR capacity ductable/package AC plant including removing of U/S catchall filter etc., Make: Sporlan /Danfoss/Synergy
Supply and fixing of thermostatic expansion valve suitable for upto 40 TR capacity of compressor, including removing of unserviceable thermostatic expansion valve complete all as specified and as directed.
Supply and fixing water pressure gauge 0 - 8 kg and 4" dia suitable for condenser / Chiller water line including removing of old/unserviceable pressure gauge complete all as specified and as directed.
Supply and fixing suction/ discharge/oil pressure gauge of 0-150/ 130 PSI equivalent in Kg/ Cu cm for central type AC plant including removing of old unserviceable pressure gauge complete all as specified and as directed. Make- Aerosol
Supply and fixing removable type factory made metallic pre-filter of 20 microns of standard size with GI frame both side (sizze 1430 mm x 415 mm) including removing of unserviceable metallic pre-filters all as directed. Make: AEROSOL
M & L for dismantling and taking out the existing unserviceable CT Fan motor after disconnecting the electric connection and with out distrurbing all connections and replacement of CF Fan motor following capacity and fixing in position, connecting electric connections including testing and commissioning for its satisfactory performance complete all as specified and as directed for the following capacities :- (a) 1 HP capacity
(b) 2 HP capacity
devan enterprises
Glacier Cooling Solutions Private Limited
RRK PROJECTS
KARTHIK INCORPORATE
UNIVERSAL ENGINEERING
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .