Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC L-1 Being the lowest bidder | |
| 2 | L2₹5.5 L+₹99,200.56 (22.0%)Rejected-Finance 02 UMRER PIPLA UDASA APTUR ROAD VILLAGE TOWN APTUR CITY UMRER NAGPUR MAHARASHTRA 441204 INDIA | NAGPUR | MAHARASHTRA | 441204 | L2 | Rejected-Finance Quoted value higher than L-1 bidder |
Tender Value
₹6.8 L
EMD Value
₹8,600
Closing Date
15 Aug 2023, 11:00 amClosed
SO(C), Umrer Area
O/o AGM Umrer Area, WCL.
Strengthening of Existing columns of Elecon Crusher, IR Crusher and its Bunker footing at Umrer O/C Mine of Umrer Sub Area. (2nd Call)
2023_WCL_284814_1
um4550-civ-0024-2023-24
Open Tender
Civil Works - Others
Item Rate
45 days
Umrer
Please refer tender document
3 documents required · 3 mandatory
₹8,600
19 Oct 2023
1 Aug 2023
16 Aug 2023
2 Aug 2023
15 Aug 2023
2 Aug 2023
2 Aug 2023 - 8 Aug 2023
Amount
Item Description/ Heading
Carrage of material/excavated earth over distance exceeding 0.50 km. including loading and unloading by mechanical means For a lead of 1 km
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Total impact of GST for the purpose of CTC
SINGH BROTHERS COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .