Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance 11 VAISHALI SHAH G 11 3RD FLOOR BHUMI FLAT NAR NARAYAN SOC OPP PUNJABI HALL NAVRANGPURA NAVRANGPURA AHMEDABAD GUJARAT 380009 UDYAM GJ 01 0164474 | AHMADABAD | GUJARAT | 380009 | -37.00% | ₹3.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.0 LAdmitted-Finance | -34.94% | ₹4.0 L | L2 | Admitted-Finance |
| 3 | L3₹4.1 LAdmitted-Finance 224 KAILASH NAGAR SHOBHAPUR COLONY DISTRICT BETUL MADHYA PRADESH PIN 460449 | BETUL | MADHYA PRADESH | 460449 | -33.53% | ₹4.1 L | L3 | Admitted-Finance |
| 4 | L4₹4.5 LAdmitted-Finance | -26.11% | ₹4.5 L | L4 | Admitted-Finance |
| 5 | L5₹4.6 LAdmitted-Finance | -24.67% | ₹4.6 L | L5 | Admitted-Finance |
Tender Value
₹6.1 L
EMD Value
₹12,225
Closing Date
8 Jul 2026, 5:00 pmClosed
Unit Office RIICO Malviya Jaipur (South) Ind. area
Unit Office RIICO Malviya Jaipur (South) Ind. area Jaipur
Improvement of RIICO Wood Land Park at Industrial area Bassi, Jaipur.
2026_RIICO_572036_1
776/2026-2027-19-2
Open Tender
Civil Works
Percentage
60 days
Ind. area Bassi
Scanned copy of tenderers registration in appropriate class according this tender and as per technical bid according this tender
4 documents required · 4 mandatory
₹590
RIICO
₹12,225
14 Aug 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
8 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil | - | Per Sqm | 9 | - |
| 2 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :, 25 mm thick | - | Per Sqm | 211 | - |
| 3 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding:, New work (Two or more coats applied @ 3.84 kg/10 sqm). | - | Per Sqm | 53 | - |
| 4 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide | - | Per Kg | 96 | - |
| 5 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in :, Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | Per Cum | 3,479 | - |
| 6 | Add extra for Random Rubble stone masonry with hard stone in, Wall upto 30cm. and less thickness. | - | Per Cum | 186 | - |
| 7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | - | Per Cum | 4,624 | - |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | - | Per Cum | 64 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
fd.pdf
Tender Documents • 0.19 MB
BOQ_1017832.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].