Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.0 L+₹17,685 (4.60%)Rejected-Finance | ₹4.0 L+₹17,685 (4.60%) | L2 | Rejected-Finance Rejected |
Tender Value
₹3.9 L
EMD Value
₹3,855
Closing Date
19 Jan 2024, 3:00 pmClosed
commissioner madurai corporation
Aringar Anna Maligai
Providing Culvert arrangements at kirubananthan nariyar nagar 1st street in ward 41
2024_MAWS_406611_1
E3 / Est.No. 262 / 23-24
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹3,855
26 Nov 2024
6 Jan 2024
19 Jan 2024
6 Jan 2024
19 Jan 2024
6 Jan 2024
Amount
Earthwork excavation in all kinds of soils, except hard rock requiring blasting, inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within in compound in places as shown by the department officers, clearing and levelling the site with initial lead of 10M and lift of 2M etc., complete. ( BD - 18)
Supplying and Filling in Foundation and Basement with filling Quarry Dust in layers of 15cm thick well rammed and consolidated including watering complying with std. specification etc complete.( BD - 20)
Plain Cement Concrete 1:4:8 (One Cement, Five sand and ten Aggregates) using 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation wherever necessary etc. Complete. ( BD - 21)
Supplying and erecting shuttering with necessary supports for earth beam with all cross bracing etc., complete plinth beam & Earth Beam side as building all round. ( BD - 24)
Plain Cement Concrete 1:1:5:3 (One Cement, one and half sand and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification ( BD - 20)
Supplying erecting STEEL CENTERING for sides and soffits inc supports and strutting for plain surface such as reinforced cement concrete slasp rectangular beams tee or el beams lintels, bed blocks staircase in all floors of any height (the retrived materials should betaken back by the contractor) the payment for centering shall be given by the concrete is laid (Bottom only)
Supplying fabricatting and placing in position steel reinforcement using MS or RTS rods for all RCC works, including cost of steel, GI Binding wire also ( BD - 32)
Reinforced Cement concrete 1:1:5:3 (One cement one and half sand & three course aggregates) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc complete
ADD GST 18%
SenthooranP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .