Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | -6.60% | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹11.3 LAdmitted-Finance | -0.50% | ₹11.3 L | L2 | Admitted-Finance |
| 3 | L3₹11.3 LAdmitted-Finance | -0.05% | ₹11.3 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Pdf Attached |
Tender Value
₹13.3 L
EMD Value
₹1.1 L
Closing Date
21 May 2026, 11:00 amClosed
AMA
ZILA PANCHAYAT JHANSI
NALA NIRMAN KARYA
2026_UPPRD_1147227_26
etender/jhansi/2026-27
Open Tender
Civil Works
Percentage
ZILA PANCHAYAT JHANSI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,335
AMA
₹1.1 L
4 Jul 2026
11 May 2026
21 May 2026
11 May 2026
21 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | - | M3 | 7.7 | - |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side and bottom and backfilling in trenches with excavated suitable material. | - | M3 | 403.5 | - |
| 3 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (1:3:6) | - | M3 | 4,970.9 | - |
| 4 | Providing concrete for reinforced concrete in sub structure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 M-25 | - | M3 | 6,314.3 | - |
| 5 | Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. | - | kg | 89.46 | - |
| 6 | S/F sign board | - | Job | 6,000 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.96 MB
BOQ_2145983.xls
BOQ • 0.34 MB
jhansi.pdf
PDF • 4.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].