| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | -37.11% | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹35.8 L (16.7%)Admitted-Finance 37A 99 1 MADHU NAGAR GWALIOR ROAD AGRA | AGRA | -26.61% | ₹2.5 Cr+₹35.8 L (16.7%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹42.0 L (19.6%)Admitted-Finance 33 73 LATAKUNJ AJMER ROAD BALUGANJ AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | -24.78% | ₹2.6 Cr+₹42.0 L (19.6%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 Cr+₹75.0 L (35.0%)Admitted-Finance B 5 BASANT BAGH ALIGARH ROAD HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | -15.11% | ₹2.9 Cr+₹75.0 L (35.0%) | L4 | Admitted-Finance |
Tender Value
₹3.4 Cr
EMD Value
₹19.0 L
Closing Date
2 Jul 2026, 12:00 pmClosed
Chief Engineer civil
NAGAR NIGAM AGRA
Under the Tajganj Zone Construction of an RCC drain from Madhunagar Crossing to Kamala Arun School (covering the area of Room No. 05 and Room No. 19).
2026_DOLBU_1163179_1
03-06-2026/NAGAR NIGAM AGRA/02-07-2026/24
Open Tender
Construction Works
Percentage
60 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹23,600
Nagar Nigam
₹19.0 L
12 Aug 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing of bandha for diversion of nala etc. all complete. (NS) | 50 | Bags | 600 | ₹30,000 |
| 2 | Providing of 32HP diesel pump for dewatering of nala with pump, driver etc. all complete. (NS) | 60 | Day | 2,100 | ₹1,26,000 |
| 3 | Removle of for Nala/Nali in liquid mud or faul position with special T&P including lead 30 m and lift up to 3.00 m etc. all complete | 1,560 | Cum | 239 | ₹3,72,840 |
| 4 | Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including with green net cloth supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling). | 1,300 | Rmt | 225 | ₹2,92,500 |
| 5 | Earth work cutting in or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge including royalty 9.00 cum. {Chapter No. 4, S.I. No. 253(a)} | 1,300 | Cum | 140 | ₹1,82,000 |
| 6 | Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance | 1,040 | Cum | 230.1 | ₹2,39,304 |
| 7 | Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. | 390 | Cum | 5,325 | ₹20,76,750 |
| 8 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. | 520 | Cum | 6,600 | ₹34,32,000 |
| 9 | R.C.C. work Providing and laying in position specified grade of R.C.C. Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) (Chapter 5 S.I. No. 5.1.4) | 1,196 | Cum | 7,000 | ₹83,72,000 |
| 10 | Renforced cement concrete work in beams, suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth, level up to floor five level, including cost of centering, shuttering, Finishing and Reinforceement with 1:1½:3 {1 cement : 1½ coarse sand (zone-III): 3 graded stone} | 520 | Cum | 8,900 | ₹46,28,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
BOQ_2182214.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .