Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
15 Jul 2026, 6:00 pm7d left
EXEN REW SRINAGAR
OFFICE OF THE EXECUTIVE ENGINEER REW SRG
Development of CFC Building Muftibagh Gandtal by way of tiling earth filling etc
2026_RDPR_314714_8
ENIT08/REW SGR 2025-26
Open Tender
Civil Works
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹7,000
7 Jul 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by Manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and i/c cost of filling/ leveling at site surplus excavated earth as directed EIC | 3.01 | Cum | 479.3 | ₹1,442.69 |
| 0_) | Laying of Stone Solling duly Hand packed in Trenches incl. compaction with hand rammer and carriage (stone avaliable near site) | 3.4 | Cum | 450 | ₹1,530 |
| 0_) | P/laying of GSB/nallahmuck 90mm and above i/c consolidation with PPR of same and carriages of same by MT 20KMs | 46.92 | Cum | 1,250 | ₹58,650 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 12.85 | Cum | 5,202.9 | ₹66,857.27 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 48.47 | Cum | 286.35 | ₹13,879.38 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering and (Using Concrete Vibrator for Compaction of Concrete). All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) i/c plum | 8.47 | Cum | 5,733.6 | ₹48,563.59 |
| 0_) | P/ Applying 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand | 43.03 | Sqm | 283.8 | ₹12,211.91 |
| 0_) | Structural steel work in built up sections, framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 473.85 | Kg | 138.2 | ₹65,486.07 |
| 0_) | Supplying and filling of good earth and watering of the earth in layers not exceeding 20 cm complete i/c carriages in all respects | 88.05 | Cum | 750 | ₹66,037.5 |
| 0_) | Carriage of material Stone aggregate Avg lead 15 Km | 29 | Cum | 344.49 | ₹9,990.21 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1019585.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid