| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC - | |
| 2 | L2₹3.0 L+₹16,137.31 (5.60%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | c selvakumar L1 | sankaranayagam L2 |
|---|---|---|---|---|---|
| 1.00Construction of kitchen shed at Community hall in K.Chidambarapuram Village and Panchayat. | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead lift in Hg soil for foundation etc. complete. | 9.43 | cum | 263 ₹2,480.09 Lowest | 300 ₹2,829 |
| 3.00 | Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 0.59 | cum | 1,907 ₹1,125.13 Lowest | 1,950 ₹1,150.5 |
| 4.00 | Cement concrete 1:4:8mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 1.43 | cum | 5,687 ₹8,132.41 Lowest | 5,700 ₹8,151 |
| 5.00 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance of all materials to site and all labour charges etc complete. | 7.43 | cum | 6,030 ₹44,802.9 Lowest | 6,050 ₹44,951.5 |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 7.85 | cum | 6,249 ₹49,054.65 Lowest | 6,280 ₹49,298 |
| 7.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 25.68 | Sqm | 1,094.5 ₹28,106.76 Lowest | 1,100 ₹28,248 |
| 8.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 0.1 | Mt | 91,950 ₹9,195 Lowest | 91,980 ₹9,198 |
| 9.00 | RCC 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 2.59 | cum | 9,595 ₹24,851.05 Lowest | 9,600 ₹24,864 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 13.15 | Sqm | 273 ₹3,589.95 Lowest | 300 ₹3,945 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
26 Sept 2025, 3:00 pmClosed
BDO(BP)
Panchayat Union Office,Kayathar
Construction of kitchen shed at Community hall in K.Chidambarapuram Village and Panchayat in Kayathar Panchayat Union
2025_RDTN_606854_1
A2/1820/2025 - 5
Open Tender
Civil Works
Item Rate
Kayathar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
Yes
9 Dec 2025
20 Sept 2025
26 Sept 2025
20 Sept 2025
26 Sept 2025
20 Sept 2025
Amount
Construction of kitchen shed at Community hall in K.Chidambarapuram Village and Panchayat.
Earth work excavation and depositing on bank with in initial lead lift in Hg soil for foundation etc. complete.
Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance of all materials to site and all labour charges etc complete.
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
RCC 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of machine pressed tiles of size 23x23x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats with ready mixed Plastic Emulsion of first class quality paint and of approved colour over a priming coat ,inculding through scrapping, clean removal of dirt etc. complete and inculding necessary plasterof paris , putty whereever required
Painting two coats with ready mixed paint for new iron work including cost of all materials to site and all labour charges etc complete.
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18%
sankaranayagam (BID ID -1473308)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .