Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC GORAKHPUR UP 273001 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹2 L+₹1,000 (0.50%)Rejected-Finance H N 131 GOPLAPUR NEW SHIVPURI GOPLAPUR GORAKHPUR UTTAR PRADESH 273016 | GORAKHPUR | UTTAR PRADESH | 273016 | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | L3₹2.0 L+₹3,000 (1.51%)Rejected-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
10 Dec 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
ELECTRICITY URBAN DISTRIBUTION CIRCLE, BUNGLOW NO.-9, OLD POWER HOUSE COLONY, RAILWAY STATION ROAD, GORAKHPUR
FOR THE WORK OF INSTALLATION OF NEW ELECTRONIC METER AT CONSUMER PREMISES ON EXISTING UNDERGROUND SERVICE CABLE (ARMOURED) ALONG WITH DISMANTLING OF EXISTING ELECTRONIC METER
2020_PVVNV_533268_1
44/EUDC(G)/2020-21
Open Tender
Electrical Works
Lump-sum
30 days
Area of EUDC
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EUDC, Gorakhpur
₹2,000
30 Jan 2021
26 Nov 2020
11 Dec 2020
26 Nov 2020
10 Dec 2020
26 Nov 2020
180 days
Amount
Preparing the Single/Three phase electronic meter by fixing plastic/hologram seals and entering meter data on meter register and then marking the lab meter No. on meter cover with permanent marker pen and then cartaging the meter from the test lab to site of work as per direction of Supervising Engineer including the work of loading, unloading & stacking the meter at the respective ends and also including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. Old meter along with overhead service cable taken out from consumer's premises shall be properly sealed and deposited to Electricity Urban Test Lab, Gorakhpur by the contractor.
Replacement/Installation of Single Phase electronic meters on connections at the outside the main gate of permises of the consumer where underground cabling work done including the work of Sealing the meter and filling of sealing certificate properly and handing over copy of sealing certificate to consumer and concerned division/subdivision on same day.
Replacement/Installation of Three Phase electronic meters on connections at the outside the main gate of premises of the consumer where underground cabling work done including the work of Sealing the meter and filling of sealing certificate properly and handing over copy of sealing certificate to consumer and concerned division/subdivision on same day.
M/s S.B.S. Traders
M/s Anil kumar singh
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .