Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93,248.50Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.1 L+₹13,048.01 (14.0%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MH CONSTRUCTION COMPANY L1 | FAYAZ AHMED MANHAS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift 37.13 m3 upto 1.5 m, as directed by Engineer-in-Charge.
L H W
328.08 2 2
1312.32 i.e 1312.32x0.0283=37.13 | 37.13 | m3 | 450 ₹16,708.5 | 427 ₹15,854.51 Lowest |
| 2.00 | Random Rubble masonry with nallah stone hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement: 6 coarse sand)
L H W
328.08 0.33 2
216.53 i.e. 216.53 x 0.0282 = 6.11 | 6.11 | m3 | 4,000 ₹24,440 Lowest | 4,700 ₹28,717 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement 3 coarse sand: 6 graded stone aggregate 20 mm nominal size)
656.16 0.33 1.5
324.16 i.e 324.79 x0.0282=09.15 M3 | 9.15 | m3 | 4,500 ₹41,175 Lowest | 5,200 ₹47,580 |
| 4.00 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild Steel and Tensile steel bars.
MS Bars 08mm=115 Kg | 115 | kg | 95 ₹10,925 Lowest | 123 ₹14,145 |
Tender Value
₹1.2 L
EMD Value
₹2,400
Closing Date
5 Aug 2026, 12:00 pmClosed
EXECUTIVEV ENGINEER M AND H DIVISION DODA
KHELLANI
Construction of Drain and allied works in the Mechanical and Hospital Complex in Ramban
2026_PWDJK_315247_1
MHDD/TS/2026-27/22
Open Tender
Civil Works - Others
Turn-key
20 days
RAMBAN
AS PER SBD
2 documents required · 2 mandatory
₹500
EXECUTIVEV ENGINEER M AND H DIVISION DODA
₹2,400
6 Aug 2026
9 Jul 2026
5 Aug 2026
9 Jul 2026
5 Aug 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift 37.13 m3 upto 1.5 m, as directed by Engineer-in-Charge.
L H W
328.08 2 2
1312.32 i.e 1312.32x0.0283=37.13 | 37.13 | m3 | 100 | ₹3,713 |
| 2 | Random Rubble masonry with nallah stone hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement: 6 coarse sand)
L H W
328.08 0.33 2
216.53 i.e. 216.53 x 0.0282 = 6.11 | 6.11 | m3 | 100 | ₹611 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement 3 coarse sand: 6 graded stone aggregate 20 mm nominal size)
656.16 0.33 1.5
324.16 i.e 324.79 x0.0282=09.15 M3 | 9.15 | m3 | 101 | ₹924.15 |
| 4 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild Steel and Tensile steel bars.
MS Bars 08mm=115 Kg | 115 | kg | 102 | ₹11,730 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_1021948.xls
BOQ • 0.28 MB
cor33.pdf
PDF • 0.51 MB
cor221.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .