| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC ERODE | ERODE | TAMIL NADU | 638001 | L1 | Accepted-AOC OK | |
| 2 | L2₹4.3 L+₹20,533.50 (5.02%)Rejected-Finance A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | L2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | MSK Infra Projects L1 | M/s. Kousic & Co L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and Removal and Conveyance of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 58 | M3 | 115.48 ₹6,697.84 Lowest | 121.28 ₹7,034.24 |
| 2.00 | Plain Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 30 | M3 | 5,578.33 ₹1,67,349.9 Lowest | 5,858.42 ₹1,75,752.6 |
| 3.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification | |||||
| 3.01 | CC Side wall- Without Strutting | 23 | M2 | 487.15 ₹11,204.45 Lowest | 511.61 ₹11,767.03 |
| 4.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 29 | M3 | 7,594.63 ₹2,20,244.27 Lowest | 7,975.96 ₹2,31,302.84 |
| 5.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement Concrete to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 7 | M2 | 478.2 ₹3,347.4 Lowest | 502.95 ₹3,520.65 |
Tender Value
₹4.9 L
EMD Value
₹4,940
Closing Date
3 Mar 2026, 6:00 pmClosed
THE COMMISSIONER,ERODE CITY MUNICIPAL CORPORATION
246,MEENAKSHI SUNDARANAR SALAI ERODE
PROVIDING CC PAVEMENT AT BEEMANKATTU STREET NEHRUJI STREET 2IN WARD NO -59.
2026_MAWS_669479_1
E1-0118-2025-04-1-73-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
60 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹885
₹4,940
8 Oct 2026
3 Mar 2026
3 Mar 2026
3 Mar 2026
3 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and Removal and Conveyance of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 58 | M3 | - | - |
| 2 | Plain Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 30 | M3 | - | - |
| 3Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification | |||||
| 3.01 | CC Side wall- Without Strutting | 23 | M2 | - | - |
| 4 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 29 | M3 | - | - |
| 5 | Providing and fixing Bitumen Pad for Expansion joint in between pavement Concrete to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 7 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_804499.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .