Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.2 Cr+₹0.37 (<0.01%)Rejected-AOC | ₹2.2 Cr+₹0.37 (<0.01%) | L2 | Rejected-AOC NOT QUALIFIED FOR AOC |
| 3 | L3₹2.2 Cr+₹0.80 (<0.01%)Rejected-AOC | ₹2.2 Cr+₹0.80 (<0.01%) | L3 | Rejected-AOC NOT QUALIFIED FOR AOC |
| 4 | Not Admitted-Fee/PreQual/Technical VILL BORPAMUA GAON P O JENGRAIMUKH DIST MAJULI | MAJULI | ASSAM | 785102 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Finance | - | - | Not Admitted-Finance Price Bid not complied |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
23 Jan 2021, 2:00 pmClosed
Addl. Chief Engineer, UAZ, W. R. Deptt. Dibrugarh
Addl. Chief Engineer, UAZ, W. R. Deptt. Dibrugarh
Immediate measures to PGJH dyke on L/B of Subansiri River (Recoupment of flood damages at Jengrai Chapori and Jambukchuk area) under SDRF for 20202021
2021_DoWR_20186_1
MAJ/SDRF/JENGRAI/2020-21/1
Open Tender
Civil Works
Works
60 days
Majuli
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹5.0 L
Yes
2 Sept 2021
13 Jan 2021
25 Jan 2021
13 Jan 2021
23 Jan 2021
18 Jan 2021
Amount
Medium Jungles: Clearing medium jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. ( When 30% to 60 % of the area is covered by shrubs,trees etc).
Uprooting bamboo clumps where bamboo already removed including removing stumps to a distance as directed.
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage) For initial lead beyond ½ Km and up to 4.00 Km and for all lifts
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts.
KALITA CONSTRUCTION UPEN KR BORTHAKUR JV
PARTHA PRATIM HAZARIKA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .